HomeMy WebLinkAboutNCC200763_Modification Review_20210127Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 1/26/2021 2:48:19 PM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 1/27/2021 7:30:33 AM (Construction COC ADD TO FILE Review- NCC200763)
• The task was assigned to Georgoulias, Bethany. The due date is: January 29, 2021 5:00 PM
1 /26/2021 2:48 PM
Y. ,
NORTH CAPOLINA
EnYlrenmemf& Qualay
Certificate of NCC200763
Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters)
No.*
Information associated with this permit
Project Name
Parkwood Substation Tie 230kV
Address
618 Scott King Rd, Durham, NC
County
Durham
Latitude
35.8744
Longitude
-78.9324
Permittee Listed
Duke Energy Carolinas, LLC
Legally Responsible
Michael Robinson
Individual
NC Reference No.
NCG01-2020-0763
E&SC Plan ID
DURHA-2020-008
Original NOI
22377
Tracking No.*
Date COC Issued*
02/28/2020
Prior Rescission
This field will populate only if CCChas already been rescinded.
Date
Modification Information:
Reason for r Closed -Out Lots/Outparcels in E&SC Plan
Modification * r Additional Lots/Outparcels Approved - E&SC Revised
F Other Revision(s) to E&SC Plan
r Legally Responsible Individual and/or Site Contact Has Changed
r Multiple Reasons (List)
Addional We information if needed (e.g., new Site Contact details can be included here)
Explanation Updated LOD
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (%vised ESCApproval, (lose -Cut Doc, etc.)
Documentation PWT-NCDEQ APPROVAL .pdf 374.79KB
Mast be FDFformat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto e)ceed ten thousand
dollars ($10,000).
rJ I hereby request modification to coverage under the NPDES Stormwater Permit
for the subject project site. I am familiar with the information contained in this
request and to the best of my knowledge and belief such information is true,
complete and accurate.
Specify if you are:* r The Legally Responsible Individual
f Authorized Responsible Person*
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
�r9�l1r'���sYrlc�
Type Name* Michael D Robinson
Title * Manager, Substation Engineering
Organization* Duke Energy Carolinas, LLC
Date * 01 /26/2021
Email Address* Mike. Robinson@duke-energy.com
Errail for confirrration
Telephone Number* 980-373-4228
Contact nurrber if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email Additional email for confirmation
(Optional)
Original Permittee Mike. Robinson@duke-energy.com
Email
Original Site Contact jthomas@langstonconstr.com
Email
Review Date 01/27/2021
Rescinded Since
Submitted?
Request Date 20210126
Formatted
Review Date 20210127
Formatted