Loading...
HomeMy WebLinkAbout20201981 Ver 1_Pre-Filing Meeting Information_20210122DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* 20201981 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre-Filing Me eting Reque st submitte d 12/17/2020 Della Moore drmoore2@ncdot.gov Durham Street Bridge Extension NCDOT Alamance City Greensboro State / Province / Region NC Postal / Zip Code 27415 Country USA Street Address P.O. Box 14996 Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No 17.B.P.7.R.122 & B-5346/SR1529 Dave Wanucha Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date The North Carolina Department of Transportation (NCDOT) has proposed to replace Alamance County Bridge No. 3 on Durham Street (SR 1529), project B-5346 over Dry Run creek; a poorly functioning, substandard old bridge with a new bridge. Bridge No. 3 is located just north of the Town of Elon and City of Burlington. Subdivision Streets intersect SR 1529 just north and south of the existing bridge location. The existing structure is a three span (1@17'8, 1@17'0, 1@17'8) and is a timber deck on timber joists. The abutments and interior bents are timber caps, posts and concrete sills (timber bulkheads).The proposed structure is a single span (1@70'-24") prestressed concrete cored slab with 4' deep caps. This structure has been designed to have as little environmental, wetlands, and surface water impacts as possible. 2:1 roadway fill slopes shall be constructed to minimize drainage impacts in accordance to NCDOT design standards. 12/22/2020 1/5/2021 17BP7R122 Bridge No. 3 B5346 100% Plans.pdf 13.98MB 00 0003 2017 Rev 2017 B5346 DRY CREEK SR 1529.pdf 3.83MB B-5346 NRTR.pdf 4.52MB B-5346 Vic Map.pdf 219.11KB Bridge No. 3 Site Map.pdf 1.11MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 12/17/2020