HomeMy WebLinkAbout20201981 Ver 1_Durham St. Stream Impacts Summary_20210122 WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 13+98 to 14+09 -L- RT RIP RAP AT EMBANKMENT < 0.01 16
SUB TOTALS *: < 0.01 16 0
*Rounded totals are sum of actual impacts
NOTES:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
06-07-17
Alamance
D-5346
46060.1.1
RovIzed 201510H SHEET 5 OF 5