HomeMy WebLinkAbout20201981 Ver 1_Durham St Buffer Impacts_20210122BUFFER IMPACTS PERMIT
SHEET 1 OF 3
BUFFER DRAWING
4
-L- POT STA. 15+35.00
END TIP PROJECT B-5346
BEGIN BRIDGE END BRIDGE
BEGIN TIP PROJECT B-5346
-L- POT STA. 12+45.00
TO HWY 87 TO BURLINGTON
D
T
V
=
=
=
=
=
=
%
%
MPH
ADT
ADT
% *
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
K DRY CREEKDRY CREEK0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA Prepared in the Office of:
SIGNATURE:
SIGNATURE:
P.E.
P.E.
DIVISION OF HIGHWAYS
2012 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
5/31/2017B5346_Hyd_prm_buf_psh_01.dgnjharvey1000 Birch Ridge Dr., Raleigh NC, 27610
CONTRACT:TIP PROJECT:ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NA-L-SR 1666 LITTLE JOHN LANESR 1529 DURHAM STREET EXTENSION SR 1529 DURHAM STREET EXTENSION DURHAM MEADOWS DRIVETOTAL LENGTH OF T.I.P. PROJECT B-5346 = 0.055
JUNE 19, 2018
JUNE 16, 2017
ALAMANCE COUNTY
SR 1529 (DURHAM STREET EXTENSION)
GRADING, DRAINAGE, PAVING, AND STRUCTURE
100'
100'
5'
2591
3500
12
65
50
2015
2035
DUAL=3%* TTST =1%
SUB-REGIONAL TIER
46060.1.1 P.E.
B-5346
See Sheet 1A For Index of Sheets
B-5346See Sheet 1B For Conventional Symbols
BRZ-1529(10)
4
50'25'50'
50'25'50'
10'10'20'FUNC CLASS = RURAL
LOCAL
BRIDGE No. 3 OVER DRY CREEK ON
JAMES A. SPEER, PE
NYA K. BOAYUE, PE
LENGTH STRUCTURE T.I.P. PROJECT B-5346 =
LENGTH ROADWAY T.I.P. PROJECT B-5346 =
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD .
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
B-5346
TIP PROJECT
87
87
Glen Raven
100
100
SR 1638
SR 1642SR 1529SR 1529SR 1547
SR 1509
S
R
1
5
1
3
SR 1803
SR 1650 2461 RSSR 1 6 4 3
VICINITY MAP
SR 1506 SR 1507
SR 1640
SR 1645
SR 1514
SR 1666
SR 1665
SR 1664
DETOUR ROUTE
DETOUR ROUTE INTERSECTION IMPROVEMENT DETAIL
-L1-
-Y2-
-Y2- POT STA. 11+20.00
END CONST.
SR 1547 (ROUTH RD)
SR 1529 (DURHAM ST EXTENSION)
NAD 83/ 2011
0 50'25'50'
SCALE: 1"=100'
100'
SHEET 2 OF 3
BUFFER DRAWINGNAD
83/ 2011NOTE : SEE SHEET 5 FOR -L- PROFILE
-L-
TYPE-III TYPE-III
TYPE-III
AT-1
TYPE-III
22'.02.02.02.02DETAIL SHOWING BRIDGE / ROADWAY RELATIONSHIP
BEGIN BRIDGE END BRIDGE
BEGIN APPROACH SLAB END APPROACH SLAB
22'DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
SEE DETAIL 2C-1
(SHOP CURVED)4'-5"4'-5"DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
REVISIONS HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
4B-5346 5/31/2017B5346_Hyd_prm_buf_psh_04.dgnjharvey8/17/99INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NAD 83/ 2011DETOUR ROUTE INTERSECTION IMPROVEMENT DETAIL
-L1- (SR 1529-DURHAM ST. EXT.) / -Y2- (SR 1547-ROUTH RD.)30'-10"ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
S72" WDWD1SFD48" CONC20' CONC
1SBKDS
WD
72" WD
21' CONC
36" CONCPOLE
FLAG 30" C&G30" C&G12' GRWOODSSIGN
S15" RCP18" RCP
15" RCP
18" RCP 18" RCPDIDI1SBKD48" CONCWD19' CONC
S 72" CHL
SPAVER
S
36"STONE
WD
1SFD
2SF
G
CONC36" CONC21' CONC
POLE
FLAGLT
36" BKWALL48" WDCTGR
1SBKD
STEPS
WD
CONC
S1SBKD
WELL VAR. GR
GRWOODSWOODSWOODS WOODS
18" RCP CEDAR HEDGEROW
WD
WD2SFD48" CONC15" CMP15" CMP2SFD36" CONC2SFDWD48" CHL
48" CHL 48" WW72" CHL
SSS15" RCPGR1SFDSCONCWD WALL
VAR. HT78" WDWOODSC12" RCP
15" CMPAREA
GARDEN
WELL
18" RCP
18" RCPEIP
EIP
EIP
EIP
EIP
EIPEIP
EIP
EIP
EIP
EIP
EIP
EIP
EIP
EIPDRY CREEKDRY CREEKBST DECK
WD WWWD WW
WD WW
10.00'20.00'
2
0.0
0'
10.0
0'REF. PB 34 PG 61 30' SEWER EASEMENTREF. PB 48 PG 3230' SEWER EASEMENTEIP
EIP
TO BURLINGTON10' UTILITY EASEMENT10' UTI
LI
TY EASEMENT10' UTILITY EASEMENT10
' DRAINAGE EASEMENT 10' UTILITY EASEMENT15' SEWER
EASEMENT
DRAINAGE EASEMENT
30' WATER LINE &
10' UTILITY EASE
MENT
10' X 70' SEWOODS
18" RCP
JB
POSSIBLE
END UNKNOWN18" RCP CBCBCABLE WIREVALERIE J. GARCIA
JESUS E. GARCIA, JR.
MARIA C. JONES
CHRISTOPHER P. JONES
SHEILA J. HARRIS
JOSEPH W. HARRIS
ANN L. STADLER
VIRGIL L. STADLER
RALPH EVANS
DELORES L. McFARLING
GEORGE T. McFARLING, IIIFRANK FULLERRHONDA W. MILES
CLARENCE R. MILES, JR.HEATHER A. STEINTIMOTHY A. STEINTHE OAK GROUP, LLCLILLIAN D. GERRINGER, ETALREF DB 299 PG 274ACCESS EASEMENTREF DB 299 PG 274ACCESS EASEMENT8' GRLIFE ESTATE
MARY E. PUTNAM
EIP
EIP
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W60.00'60.00'EXISTING R/WEXISTING R/W50.00'
EXISTING R/W
EXISTING R/WEXISTING R/W60.00'
ESTATE
KINNIE H. LOY
EIP
6 LT
8" VC8" VC
20" DI20" DI8" VCEIP
EIP
EIP
BRIDGE #3
WOODDURHAM STREET EXTENSION SR 1529 DURHAM MEADOWS DRIVE 30' BSTLITTLE JOHN LANE SR 1666 20' BSTDURHAM STREET EXTENSION SR 1529 20' BSTCONC
CONC
CONC
CONC
CONC14' GR11' GR
WOODS
-L--Y--Y1-10+0015+001 2
3
4
REMOVE
15"RCP-IV 15" RETAIN
RETAIN
RETAIN
( Not to Scale)
RIP-RAP AT EMBANKMENT
FROM STA. 14+05 TO STA. 14+28 -L- RT
DETAIL D
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 15 sy
Type of Liner= 9 TONS,CL I Rip-Rap
10'min.
1.0'min.15"LATERAL 'V' DITCH
( Not to Scale)
2:1 2:1
D
b
d
1"/Ft.
FROM STA. 14+82 TO STA. 15+41 -L- LT
Slope
Fill
Type of Liner= CL B Rip-Rap b= 3 Ft.
Max. d= 1 Ft.
Min. D= 1 Ft.
DETAIL B
Ground
Natural
Geotextile Flatter4:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 10+75 TO STA. 11+20 -Y2- LT
FROM STA. 12+58 TO STA. 13+00 -L- RT
DETAIL C
Min. D= 1 Ft.
Ground
Natural Slope
Ditch
Front
TB 2GI
TB 2GI
2 ELBOWS
15" W/
( Not to Scale)
LATERAL BASE DITCH
3:1D
B
b
d
2:1 1"/Ft.
FROM STA. 14+28 TO STA. 15+54 -L- RT
DETAIL A
b= 3 Ft.
B= 2 Ft.
Max. d= 2.0 Ft.
Min. D= 2.0 Ft.
*When B is < 6.0'
Type of Liner= CL B Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
ELB
ELB
HH
DI
T
T
12" RCP
12" RCP
36" SPLIT RAIL
2SBKD
1SBKD
12" RCP
12" RCP
1SFD
CONCCONC
42" VINYL GRACEWOOD CTSR 1547 (ROUTH RD)
TO NC 87
TO NC 87 20' PAVED
20' PAVED
20' PAVED
SUSAN GRACE
SUSAN GRACE
RAYNELLE D. ISLEY
EIP
EIP
EIP
EIP
EIPEIP
60.00'EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W
EXISTING R/W60.00'EXISTING R/W
EXISTING R/W
and wife JULIE S. ALLGEYER
JOESPH P. ALLGEYER 60.00'60.00'WS
OI
L & GRAVE
L
S
OI
L & GRAVE
LSOIL & GRAVELSOI
L & GRAVELS
OI
L & GRAVE
LEXISTING R/WEXISTING R/W11
12
13
14
15
SR 1529 (DURHAM ST EXTENSION)
wife MARIE P. CARDWELL
LARRY R. CARDWELL and
5
15"
REMOVE
SEE DETAIL C
SPEC. CUT 'V' DITCH
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)ROADWAY 13+27 to 15+16 -L- X 541 2145 2686 0BRIDGE 13+68 to 14+38 -L- X 2754 136 2890 0TOTAL:3295 2281 5576 0 0 0 0 0NOTE:IMPACTRIPARIAN BUFFER IMPACTS SUMMARYTYPESITE NO.STRUCTURE SIZE / TYPESTATION (FROM/TO)ALLOWABLE MITIGABLEBUFFER REPLACEMENTN.C. DEPT. OF TRANSPORTATIONDIVISION OF HIGHWAYS ALAMANCE COUNTY SHEET 3 OF 3 PROJECT: WBS # (B-5346)46060.1.1 DATE 06/07/2017Rev. May 2006