HomeMy WebLinkAbout20201981 Ver 1_ePCN Application_20210122 I I DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
October 26,2020 Ver 3.3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6 Yes
✓ No
Is this project a public transportation project?*
0 Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20201981 1
Is a payment required for this project?*
✓ No payment required Reviewing Office*
6 Fee received Winston-Salem Regional Office-(336)776-
✓ Fee needed-send electronic notification 9800
Select Project Reviewer*
Dave Wanucha:eads\djwanucha
Information for Initial Review
1a.Name of project:
Durham Street Ext.Bridge Replacement
1a.Who is the Primary Contact?*
Jerry Parker
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
japarker3@ncdot.gov (336)256-2063
Date Submitted
1/22/2021
Nearest Body of Water
Dry Creek
Basin
Cape Fear
Water Classification
WS-V:NSW
Site Coordinates
Latitude: Longitude:
36.130204 79.477098
Pre-Filing Meeting Information
ID# Version
20201981 1
Pre-fling Meeting or Request Date*
12/17/2020
Attach documentation of Pre-Filing Meeting Request here:*
Durham St DWR Pre-Filing Meeting Request Form.pdf 58.12KB
A. Processing Information C^U
County(or Counties)where the project is located:
Alamance
Is this a NCDMS Project
✓ Yes r No
Is this project a public transportation project?*
✓ Yes r No
Is this a NCDOT Project?*
✓ Yes r No
(NCDOT only)T.I.P.or state project number:
Formally B-5346
WBS#(?)
17BP.7.R.123
1a.Type(s)of approval sought from the Corps:
(7 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
r No
lb.What type(s)of permit(s)do you wish to seek authorization?
fJ Nationwide Permit(NWP)
r Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
C Yes rNo
Nationwide Permit(NWP)Number: 03-Maintenance
NWP Numbers(for multiple NWPS):
Id.Type(s)of approval sought from the DWR:
17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit 17 Riparian Buffer Authorization
r Individual Permit
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes r No
For the record only for Corps Permit: r Yes r No
If.Is this an after-the-fact permit application?*
✓ Yes r No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
C Yes r No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
lh.Is the project located in any of NC's twenty coastal counties?
C Yes r No
1j.Is the project located in a designated trout watershed?
✓ Yes r No
B. Applicant Information
Id.Who is applying for the permit?
7 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes r No
2.Owner Information
2a.Name(s)on recorded deed:
NCDOT
2b.Deed book and page no.:
2c.Responsible party:
Wright Archer
2d.Address
Street Address
1584 Yanceyville St.,Greensboro,NC 27401
Address Line 2
P.O.Box 14996
aty State/Province/legion
Greensboro NC
Postal/Zip Code Country
27415-4996 USA
2e.Telephone Number: 2f.Fax Number:
(336)487-0000
2g.Email Address:*
warcher@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
lb.Subdivision name:
(if appropriate)
1c.Nearest municipality/town:
Burlington
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Address Line 2
City State/Province/legion
Postal/Zlp Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Dry Creek
3b.Water Resources Classification of nearest receiving water:*
WS-V:NSW
3c. What river basin(s)is your project located in?*
Cape Fear
3d.Please provide the 12-digit HUC in which the project is located.
030300020404
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The project site consists of suburban neighborhoods of medium density interspersed with forest land and agricultural fields.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r' No r Unknown
4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR)
Durham ST.Ext.Topo Map.pdf 355.64KB
4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR)
4f.List the total estimated acreage of all existing wetlands on the property:
0
4g.List the total estimated linear feet of all existing streams on the property:
16
4h.Explain the purpose of the proposed project:*
The purpose of the project is to replace a functionally obsolete bridge with a new bridge in the same alignment.An offsite detour will be utilized during construction.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
The proposed project will replace the existing two lane bridge with a new two lane bridge in the same alignment.The roadway grade of the new structure will be approximately the same
as the existing structure.Six foot shoulders with two-foot paved will be provided on each side.The replacement structure will be approximately 70 feet long,replacing the old structure of
approximately 52 feet.Traffic will be detoured offsite during construction.Standard road building equipment such as,trucks,cranes and dozers will be utilized.
4j.Please upload project drawings for the proposed project.
Durham St.Permit Drawings.pdf 1.38MB
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
c Yes r No r Unknown
Comments:
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
r Preliminary r Approved r Not Verified a Unknown r N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known): J.Hartshorn
Agency/Consultant Company: IGmley-Horn Associates
Other:
5d1.Jurisdictional determination upload
Durham St.Wetland Delineation.pdf 476.31KB
6. Future Project Plans
6a.Is this a phased project?*
C Yes a No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la.Where are the impacts associated with your project?(check all that apply):
n Wetlands fJ Streams-tributaries 17 Buffers
r Open Waters r Pond Construction
3.Stream Impacts
3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
S1 Bank Stabilization Permanent Bank Stabilization Dry Creek Perennial Both 7 16
Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
16 0
3i.Total stream and ditch impacts:
16
3j.Comments:
6. Buffer Impacts(for DWR)
6a.Project is in which protect basin(s)?
Check all that apply.
✓Neuse n Tar-Pamlico
n Catawba r" Randleman
n Goose Creek fJ Jordan Lake
n Other
6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact
Road Crossing P Dry Creek No 541 2,145
Bridge P Dry Creek No 2,754 136
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 3,295.00 2,281.00
Zone 1 Zone 2
Total combined buffer impacts: 3,295.00 2,281.00
6i.Comments:
Supporting Documentation
Durham St Buffer Impacts.pdf 736.96KB
Durham St.Stream Impacts Summary.pdf 82.22KB
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The project was designed to replace a bridge with a bridge.It was also designed to span the width of the stream with no bents proposed to be in the
stream.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
No deck drains are proposed for the structure.Run-off from the bridge will be collected by inlets and discharged outside of Buffer Zone 2 onto Class B
riprap so that sheet flow can be established prior to run-off reaching the buffer.
2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
rYes RNo
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Project does not meet nor exceed the thresholds that require mitigation.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
6 Yes rNo
What type of SCM are you providing?
n Level Spreader
n Vegetated Conveyance(lower SHWT)
n Wetland Swale(higher SI-WT)
n Other SCM that removes minimum 30%nitrogen
fJ Proposed project will not create concentrated storm water flow through the buffer
Diffuse Flow Documentation
Durham St.Ext Stormwater Plan.pdf 321.04KB
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
✓ Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
✓ Yes r' No
lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPA/SEPA)?*
✓ Yes rNo
Comments:*
Project qualifies as Categorical Exclusion and is therefore exempt.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)7*
✓ Yes 6' No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
✓ Yes rNo
3b.If you answered"no,"provide a short narrative description.
The minimal impact of this bridge project should not stimulate growth nor influence nearby land uses.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes r No r N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
✓ Yes rNo
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ Yes r No
5c.If yes,indicate the USFWS Field Office you have contacted.
Raleigh
5d.Is another Federal agency involved?*
✓ Yes r No r Unknown
5e.Is this a DOT project located within Division's 1-8?
G Yes r No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS Website and IPac
Consultation Documentation Upload
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes rNo
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS County Index
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
CYes rNo
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT Cultural Resource Staff
7c.Historic or Prehistoric Information Upload
Durham St Architectural No Survey.pdf 3.08MB
Durham St.Archaeology No Survey.pdf 597.34KB
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-year floodplain?*
(' Yes rNo
8b.If yes,explain how project meets FEMA requirements:
Coordination with the NCDOT Hydraulic Unit
8c.What source(s)did you use to make the floodplain determination?*
FEMA Flood Maps
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature
*
I7 By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
W.R.Archer Ill,PE
Signature
912,.oritanc[sf '
Date
1/22/2021