Loading...
HomeMy WebLinkAbout20201624 Ver 1_More Info Requested_20210126Strickland, Bev From: Homewood, Sue Sent: Tuesday, January 26, 2021 1:13 PM To: 'Michael Brame' Cc: 'Bailey, David E CIV USARMY CESAW (USA)' Subject: RE: [External] Request for Additional Information - Brightwood Crossing LLC - 6479 Burlington Road, Whitsett, Guilford County; SAW-2020-02276 Michael, I just wanted to follow up that I do not have any additional comments on this project. I will place the application on hold until I receive a copy of your response to the USACE comments below. Thanks. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 #�j #r 1.1" ; fix..*i,r :ix * * ,f From: Homewood, Sue Sent: Monday, January 11, 2021 1:05 PM To: Michael Brame <mbrame@pilotenviro.com> Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Subject: RE: [External] Request for Additional Information - Brightwood Crossing LLC - 6479 Burlington Road, Whitsett, Guilford County; SAW-2020-02276 Hi Michael, I have not reviewed the application yet but please copy me on your response. I will forward my comments once I review the application. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 1 Winston Salem NC 27105 Lfi .: £ x.... :; x. .. x.. From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Sent: Thursday, January 7, 2021 3:35 PM To: Michael Brame <mbrame@pilotenviro.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [External] Request for Additional Information - Brightwood Crossing LLC - 6479 Burlington Road, Whitsett, Guilford County; SAW-2020-02276 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Michael, Thank you for your PCN and attached information, dated 12/24/2020, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29 (http://saw-reg.usace.army.mil/NWP2017/2017NWP29.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) Your PCN included proposed impacts to streams and wetlands, however these and other potentially jurisdictional boundaries have not been verified by the Corps. A site visit will be required to verify your delineation of potential waters of the US. Please note that your PCN is considered on hold until your submitted delineation is verified by our office. Further, additional revisions may be required on the PCN and plans based on the final Corps -verified boundaries of potential waters of the US. I am currently available to field -verify your delineation on Tuesday, 1/19/2021 at 11:30am; would this date and time work for you? 2) Please note that this parcel was included in the Brightwood Farm residential development project, originally authorized via NWP 39 dated 12/17/2002 (see attached). This permit verification authorized impacts to 300 linear feet of stream channel, although not all of them involved the permanent loss of waters and not all were constructed. Given that this parcel was intended to be part of this larger residential development, and due to shared infrastructure with this overall development (e.g. access from Preakness Parkway) it is likely that the Corps will view the proposed stream and wetland impacts as cumulative with Brightwood Farm residential development. Please provide any information you have regarding the association of the proposed project with the Brightwood Farm residential development. We also suggest providing a functional assessment (NCWAM) of the wetland proposed for impact given the proximity of proposed wetland impacts to the typified compensatory mitigation threshold in Nationwide Permit 29 General Condition 23(c); 3) Please note that responses to the questions above may prompt additional information requests to allow full evaluation of the proposed project. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey.