From: Homewood, Sue
Sent: Tuesday, January 26, 2021 1:13 PM
To: 'Michael Brame'
Cc: 'Bailey, David E CIV USARMY CESAW (USA)'
Subject: RE: [External] Request for Additional Information - Brightwood Crossing LLC - 6479
Burlington Road, Whitsett, Guilford County; SAW-2020-02276
Michael,
I just wanted to follow up that I do not have any additional comments on this project. I will place the application on hold
until I receive a copy of your response to the USACE comments below. Thanks.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
#�j #r 1.1" ; fix..*i,r :ix * * ,f
From: Homewood, Sue
Sent: Monday, January 11, 2021 1:05 PM
To: Michael Brame <mbrame@pilotenviro.com>
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Subject: RE: [External] Request for Additional Information - Brightwood Crossing LLC - 6479 Burlington Road, Whitsett,
Guilford County; SAW-2020-02276
Hi Michael,
I have not reviewed the application yet but please copy me on your response. I will forward my comments once I review
the application.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
1
Winston Salem NC 27105
Lfi .: £ x.... :; x. .. x..
From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil>
Sent: Thursday, January 7, 2021 3:35 PM
To: Michael Brame <mbrame@pilotenviro.com>
Cc: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: [External] Request for Additional Information - Brightwood Crossing LLC - 6479 Burlington Road, Whitsett,
Guilford County; SAW-2020-02276
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Michael,
Thank you for your PCN and attached information, dated 12/24/2020, for the above referenced project. I have reviewed
the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29
(http://saw-reg.usace.army.mil/NWP2017/2017NWP29.pdf). Please submit the requested information below (via e-mail
is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide
Permit or consider your application withdrawn and close the file:
1) Your PCN included proposed impacts to streams and wetlands, however these and other potentially
jurisdictional boundaries have not been verified by the Corps. A site visit will be required to verify your
delineation of potential waters of the US. Please note that your PCN is considered on hold until your submitted
delineation is verified by our office. Further, additional revisions may be required on the PCN and plans based on
the final Corps -verified boundaries of potential waters of the US. I am currently available to field -verify your
delineation on Tuesday, 1/19/2021 at 11:30am; would this date and time work for you?
2) Please note that this parcel was included in the Brightwood Farm residential development project, originally
authorized via NWP 39 dated 12/17/2002 (see attached). This permit verification authorized impacts to 300
linear feet of stream channel, although not all of them involved the permanent loss of waters and not all were
constructed. Given that this parcel was intended to be part of this larger residential development, and due to
shared infrastructure with this overall development (e.g. access from Preakness Parkway) it is likely that the
Corps will view the proposed stream and wetland impacts as cumulative with Brightwood Farm residential
development. Please provide any information you have regarding the association of the proposed project with
the Brightwood Farm residential development. We also suggest providing a functional assessment (NCWAM) of
the wetland proposed for impact given the proximity of proposed wetland impacts to the typified compensatory
mitigation threshold in Nationwide Permit 29 General Condition 23(c);
3) Please note that responses to the questions above may prompt additional information requests to allow full
evaluation of the proposed project.
Please let me know if you have any questions.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David. E.Bailey2@usace.army.miI
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.