Loading...
HomeMy WebLinkAboutSWA000090_Application_20210121DEMLR USE ONLY Date Received Fee Paid Permit Number 01-25- 202t s,5vs de— 2.,2 D[90(3010 SW Program(s): ❑ Coastal SA-HQW ❑ Coastal SA-ORW ❑ Coastal FW-ORW ❑ Non -coastal HQW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ Coastal Other ❑ USMP NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER FAST TRACK PROCESS: r "AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATI& FORM Link to Application Instructions JAN 91 2021 A. ELIGIBILITY FOR FAST -TRACK PERMITTING To be considered for a Fast Track ATC Permit, AU of the items below must be checked. if any item cannot be checked, then the project must apply under the Standard Permitting Process. ® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project completion. ® The project is not proposing an alternative design. ® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's Certification. ® The project is not out of compliance with an existing stormwater permit or any other environmental permit. ❑ The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A NCAC 02H .1002(25)) to an existing state stormwater permit. ® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A or 89C of the NC General Statutes. ® 1 understand that at project completion, an application with the as -built stormwater plans (as described in 15A NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and Sedimentation Control Plan for the project may be closed out. ® I understand that the Fast Track ATC Permit will expire five years after the date of issuance. 1 Project Name: Townhomes At Brookshire Phase2A 2. Previous Project Name (if applicable): 3. Location of Project (street address): Brookshire Road City: Boone County:Wautaga Zi p:28607 4. Directions to project (from nearest major intersection): From the Intersection of Brookshire Road and Hwy421/221 in Boone. Turn Right onto Brookshire Road Continue for approximately 1 mile, Site will be on the Left. Phase 1 is currently under construction 5. Latitude:36' 13' 56" N Longitude:81 ° 38' 56" W of the main entrance to the project. 3(a. 23�-,?- -z- 81. &4_057 C. PERMIT INFORMATION 1. Specify whether project is (check one): ® New, no previous application ❑ New, replacing a previous Fast Track ATC Permit -- provide previous permitnumber: SWA By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit upon issuance of the new Fast Track ATC Permit. Stormwater Fast Track ATC Application Form Page 1 of 9 Feb. 10. 2018 ❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed M for modifications must be submitted by the original permittee and are allowed only if the SW permit is not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast Track ATC Permit. ❑ Transfer of existing Fast Track ATC Permit— provide existing ATC permit number: SWA 2. Applicable state stormwater program(s) (check all that apply): ❑ Coastal SA-HQW ❑ Urbanizing Areas (Phase 2) ❑ Coastal SA-ORW ❑ Non -Coastal HQW Is any portion of the project within 575 feet of SA-ORW waters? ❑ Yes ❑ No ❑ Non -Coastal ORW ❑ Coastal Freshwater ORW ❑ USMP ❑ Coastal — Other 3. Other Permits (as applicable, write NA" for those permit types that are not applicable): Project Name Permit/Appl Issue Date Other Information No. CAMA Major NA Erosion & Disturbed Area Sedimentation Control acre NPDES Industrial NA Stormwater 404/401 Permit Proposed Impacts Iflac 4. Local jurisdiction for building permits: Wautaga County Point of Contact: Planning and Inspections Dent Phone #: (828 ) 265-8043 D. CONTACT INFORMATION 1. Applicant/Financially Responsible Party (maybe an Organization):RCPBD Investments, LLC Signing Official Name & Title:Rick Miller, Registered Agent Street Address:324 NC Hwy 105 Ext. Suite 1 City: Boone State: NC Zi p:28607 Mailing Address (if different): Citv: State Zip: Phone: (828) 265-6344 Fax: { ) Email: mpi(cDbellsouth.net 2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of State): Name of Registered Agent:Rick Miller Mailing Address: PO Box 3018 City: Boone State: NC Zi p:28607 Phone: (828) 265-6344 Fax: ( ) Email: m pi(ftellsouth. net Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10 2018 3. The Applicant is the (check all that apply): ® Property Owner ❑ Lessee (Attach a copy of the lease agreement & complete Item 4.) ❑ Purchaser (Attach a copy of the pending sales agreement & complete Item 4.) ❑ Developer (Attach a copy of the development agreement & complete Item 4.) 4. If the Applicant is NQ= the Property Owner (skip to Item 5 if the Applicant IS the Property Owner): Property Owner Name/Organization: Signing Official &Title: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( 1 Fax: (_) Email: 5. The licensed Design Professional that will be retained for the duration of the project, who may provide information on the Applicant's behalf, and who will prepare and certify the as -built package: Consulting Engineer/Landscape Architect:W. JesseHanlin, PE Consulting Firm: Blue Ridge Engineering, PLLC Mailing Address:924 Main Street Suite 200 City:North Wilkesboro State:NC Zip:28659 Phone: (336 ) 838-2500 Fax: ( ) Email:iesse aaridge.blue 6. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title: Organization: Mailing Address: City: State: Zip: Phone: f ) Fax: ( ) E. PROJECT INFORMATION 1. Specify the type of project (check one): ® Low Density ❑ High Density 2. Briefly summarize how the stormwater runoff will be treated/conveyed: The majority of stomwater runoff will be conveyed via roadside ditches. To limit concentrated flows drop inlets with crossline stormwater pipes are used to discharge drainage conveyed by the roadsideditches 3. Stormwater runoff from this project drains to the New River River basin(s). 4. Receiving water information (if more than 3 receivinq waters, provide additional information on an attachedsheet): Receiving Water 1 Receiving Water 2 Receiving Water 3 Receiving Stream Name South Fork -New River Norris Branch Stream Classification C+ C;TR+ Stream Index Number 10-1-(3.5) 10-1-9-7-(2) Stormwater Fast Track ATC Application Form Page 3 of 9 Feb_ 10, 2018 5. Project area and densitv information: Total Property Area 4,143,776 lit Total Surface Water Area 8,586 sf Considered to include: • the normal pool of impounded structures; • the area between the banks of streams and rivers, and • the area below the Normal High Water (NHW) line or Mean High Water (MHW) line. Total Coastal Wetlands Area S Considered to include: coastal wetlands landward from the NHW (or MHW) line. Total Project Area 4,135,190 Excludes the surface water area and coastal wetland area identified above. §f May or may not be the same as Property Area. Built -Upon Area (BUA) associated with Existing Development "Existing development" means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. Proposed New BUA 213,097 sf Includes proposed new BUA that is not associated with existing development. "BUA" is defined in N C.G.S. 143-214.7(b2). It includes, but is not limited to. buildings, roads, parking areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1). Project Density w/Existing Development: Project Density = (New BUA]/(Total Project Area — Existing BUA] x 100 or 5.15 % w/o Existing Development: Project Density = [New BUA]/Total Project Area] x 100 6. Anticipated construction start date Feb 1, 2021 7. Is the project located within 5 miles of apublic airport? No Yes If `Yes,'see S.L. 2012-200, Part VI: http://www.ncleg.net/Sessions/2011/Bills/Senate/PDF/S229v6 pdf and DEQ Stormwater Design Manual Chapter E-4 Airports. 8. For projects in Union County: Contact DEMLR Central Office Stormwaterstaff at 919-707-9200 to determine if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements per 15A NCAC 02B .0600. Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018 F. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only application packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: Initials WJH 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track Process "Authorization to Construct" (ATC) Permit Application Form. WJH 2. Permit application processing fee of $505 payable toNCDEQ. VJH 3. Two hard copies and one electronic copy of a USGS map identifying the project location and GPS coordinates for the project. If the receiving water is Class SA or the receiving water drains to Class SA waters within'/2 mile of the project boundary, include the %2 mile radius on the map. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot radius on the map. WJH 4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary of the project or project phase currently being permitted, including the locations of SCIVIs, streams, wetlands, and buffers. WJH 5. Two hard copies and one electronic copy of a construction sequence that discusses how any future development on the project may be phased. '.'J.IH 6. A copy of the most current property deed. Deed book: 2095 Page No: 0675 WV �H 7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide two hard copies and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active corporation in good standing with the NC Department of the Secretary of State; otherwise, the application will be returned. htti)s://www.sosnc.gov/search/index/corp 8. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. 9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one electronic copy of lease agreements, affidavits, pending sales agreement, developmentagreement, or other documents showing that the applicant has obtained legal rights to submit a stormwater permit application within the proposed project area. _ 10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy of the designer's certification. Stormwater Fast Track ATC Applic,t;on Form Page 5 of 9 Feb. 10, 2018 G. CERTIFICATION OF APPLICANT/ FINANCIALLY RESPONSIBLE PARTY The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have notarized the following guaranty: 1, (print or type name of Applicant/Financially Responsible Party) RCPBD Investments. LLC certify that the information included on this permit application form is, to the best of my knowledge, correct and that: 1. the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, to the best of my knowledge; 2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the design shall not be exceeded, to the best of my knowledge; and 3. As the applicant, I shall maintain a licensed professional of record for the duration of the project who will prepare and certify the as -built package. If I retain another licensed professional before the project is complete, then I shall provide an updated guaranty with the current licensed professional's seal. A licensed professional shall inform the Division if he is no longer associated with this project. The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I agr to provide corrected information should there be any change in the inform ion provided herein. r 3'L `��' Cr Vt, Liz Q T yQ o p ' t UL Title or Authority I Llyu 69 P&C c/, Signature -----Date -- C- Z / -------------------------------------------- ----(-------- ice— � I,yayi'e_ �` ate` �� a Notary Public for the State ofv wa ' —(-� County of QX/, doherebycertify that Ig rC-C— rn ? I -e-(C personally appeared before me this liday of Gt n Va r'� and acknowledge the due exe tion of the applic9fign for a stormwater permit. Witness my hand and official seal, My commission expires ?;11149va� Stormwater Fast Track ATC Application Form Page 6 of 9 Feb. 10, 2018 H. DESIGN PROFESSIONAL'S CERTIFICATION To be completed by the Design Professional identified in Section D.5. I, W. Jesse Hanlin, PE , attest to the following: 1. This application has been reviewed by me and is accurate and complete, to the best of myknowledge; 2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062, as applicable; 3. The percentage built -upon area that is the basis for the design will not be exceeded; and 4. 1 have the expertise, education, and experience required to design the SCMs proposed in this application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through.1062. 5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new Applicant/Property Owner. Note: In accordance with N.C.G.S. 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person who knowingly makes any false statement, representation, or certification in any application may be reported to the appropriate NC professional licensing board. Signature: W'&'-' Li�� Date: l /I b/Z( %%%111111111".11 .0N GARO4, =0 Qo�ssiaNq�'q�`'�, 042046 94�i�n /1111111 SEAL Stormwater Fast Track ATC Application Form Page 7 of 9 Feb. 10, 2018 North Carolina Secretary of State Search Results Page 1 of 1 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online - Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form Limited Liability Company Legal Name RCPBD Investments, LLC Information Sosld: 1949629 Status: Current -Active O Date Formed: 2/13/2020 Citizenship: Domestic Annual Report Due Date: April 15th Registered Agent: Miller, Rick Addresses Mailing Principal Office 324 NC Highway 105 Ext. Suite 1 324 NC Highway 105 Ext. Suite 1 Boone, NC 28607 Boone, NC 28607 Reg Office Reg Mailing 324 NC Highway 105 Ext. Suite 1 P.O. Box 3018 Boone, NC 28607 Boone, NC 28607 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. https://www.sosne.gov/online_services/search/Business_Registration Results 1/26/2021