Loading...
HomeMy WebLinkAboutNCC210419_ESC Approval Submitted_20210126ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Duke Energy Corporation ATTN: Mr. Michael Robinson 550 S Tryon St. Charlotte, NC 28202 NORTH CAROLINA Environmental Quality„ August 13, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS RE: Project Name: PISGAH TIE TRANSFORMER REPLACEMENT Acres Approved: 2.40 Project ID: TRANS-2021-003 County: Transylvania City: Brevard Address: 2843 Old Hendersonville Hwy. River Basin: French Broad Stream Classification: French Broad River - B Submitted By: HDR Engineering Inc., Mr. Patrick Schoenecker, P.E. Date Received by LQS: August 12, 2020 Plan Type: Express - Infrastructure Dear Mr. Robinson, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Performance Reservations. A list of the performance reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources �Jl}` Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NaprHcwouru! !� o.p.dm.mor828.296.4500 Letter of Approval with Performance Reservations Duke Energy Corporation ATTN: Mr. Michael Robinson August 13, 2020 Page Z of 4 deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette. lucas@ncdenr.goy or Paul Clark at Paul. clarkC�ncdenr.goy. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. S' cerel , red Walker, P.E. Express Engineer Land Quality Section Letter of Approval with Performance Reservations Duke Energy Corporation ATTN: Mr. Michael Robinson August 13, 2020 Page 3 of 4 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Performance Reservations ec: Mr. Patrick Schoenecker, P.E. (Patrick.Schoenecker hdrinc.com- cc: Regional Office file Letter of Approval with Performance Reservations Duke Energy Corporation ATTN: Mr. Michael Robinson August 13, 2020 Page 4 of 4 PERFORMANCE RESERVATIONS Additional measures may be required - The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities