Loading...
HomeMy WebLinkAboutSW6200904_O&M Agreement Form_20210122Operation & Maintenance Agreement Project Name: Timberland Ranch Project Location: Calloway Road, Hoke County Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & corresponding O&M sheets will Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: 8 No No No oe aaaea automaucai (Various locations I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Signature: County of Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Ema' Ji u Ralph Huff President / Timberland Ranch, LLC 2919 Breezewood Avenue, Suite-499 100 Fayetteville, NC 28303 9104$64W4- 3 o a, 3� o e ra+ffhhUffCaA*hG.;.eT.GGM ID R H u _(f= e I {AFC Fct-h iq G(F,c e, c C , c ✓voo 't co-lci Date: I-] J c'q a c a l a N Public for the State of No �VI Cg_"tDU✓1C� do hereby c ify that D _ ►2 4 tVryt /A a:(F j personally appeared before me this i - tY j day of acknowledge the due execution of the Opyyera��tions✓and Maintenance Agreement . Witness mY hand and official seal, NOTAI?Y MY COMMISSION EXPIRES 4%2025 C 9, PUBLIC A Seal My commission expires g-3- RO&S- )0 Z� and STORM-EZ 1 /14/2021 Version 1.5 O&M Agreement Page 1 of 1 Infiltration Trench Maintenance Requirements Important operation and maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the infiltration trench. The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County. The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire infiltration Trash/debris is present. Remove the trash/debris. trench Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant erosive gullies have a ground cover and water until it is established. Provide lime and The grass filter strip or formed. a one-time fertilizer application. other pretreatment area Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth of greater than possible. Remove the sediment and dispose of it in a location three inches. where it will not cause impacts to streams or the SCM. Unclog the conveyance and dispose of any sediment in a location The flow diversion The structure is clogged. where it will not cause impacts to streams or the SCM. structure (if applicable) Make any necessary repairs or replace if the damage is too much The structure is damaged. for repair. Water is ponding on the Remove the accumulated sediment from the top of the infiltration surface for more than 24 trench and dispose of it in a location that will not impact a stream hours after a storm. or the SCM. The trench Grass or other plants are Do not pull the weeds (may pull out media as well). Wipe them growing on the surface of with a systemic herbicide such as glyphosate and then return within the week to remove them by hand. (Another option is to the trench. pour boiling water on them or steam them.) Water present more than Clean out any clogged underdrain pipes. Consult an appropriate Observation well three days after a storm professional for clogged soil subgrade. event The emergency overflow Erosion or other signs of damage have occurred at Repair or replace the berm. berm the outlet. Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the infiltration trench are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.