Loading...
HomeMy WebLinkAboutNCC200168_NOT Closeout Documents_20210121North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Beach Club Improvements Phase 2 River basin: Lumber Person financially responsible: Resorts of Pinehurst, Inc. (Pinehurst, Project #: MOORE-2020-030 LLQ - Richard Higginbotham, Sup: CFO NCC200168 Address: P.O. BOX 4000, PINEHURST NC 28374, Pinehurst, 1. Project Location: Denichilo Court, Pinehurst Pictures: No 2. Weather and soil conditions: cloudy/workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 13, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process Reported by: Penny Markle Others present: Date of inspection: January 12, 2021 Time arriving on site: 11:58 AM Time leaving site: 12:08 PM cc: