HomeMy WebLinkAboutNCC205871_ESC Approval Submitted_20210125d�ST�A7Eo
ROY COOPER
"
Governor
MICHAEL S. REGAN
-
Secretary
S. DANIEL SMITH
Director NORTH CAROLINA
Environmental Quality
November 24, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
City of Greensboro
ATTN: Nasha McCray, Director of Parks & Rec.
PO Box 3136
Greensboro, NC 27402
RE: Project Name: Peeler Community Recreation Center Parking Lot Improvement
Acres Approved: 2.50
Project ID: GUILF-2021-009
County: Guilford
City: Greensboro
Address: Sykes Ave
River Basin: Cape Fear
Stream Classification: WS-V; NSW
Submitted By: Wescott, Small, & Associates
Date Received by LQS: November 04, 2020
Plan Type: New
Dear Ms. McCray,
This office has reviewed the subject erosion and sedimentation control
plan. We find the plan to be acceptable and hereby issue this Letter of
Approval. The enclosed Certificate of Approval must be posted at the job
site. This plan shall expire three (3) years following the date of approval,
if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to
complete and submit an electronic Notice of Intent (NOI) form requesting
a Certificate of Coverage (COC) under the NCGO10000 Construction
Stormwater General Permit.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
�D_F W[nston-SalemRegionalOffice 1 450Hanes Mill Road,Sulte3001 Winston-Salem, North Carolina27103
"� 336.776.9800
Letter of Approval with Modifications
City of Greensboro
November 24, 2020
Page 2 of 4
This form MUST be submitted prior to the commencement of any land
disturbing activity on the above -named project. The NOI form may be
accessed at deq-.nc.gov/NCGO1. Please direct questions about the NOI
form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. Initially,
DEMLR will not charge a fee for coverage under the NCG01 permit.
However, a $100 fee will soon be charged annually. This fee is to be sent
to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the
following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right
of periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -
oriented, requiring protection of existing natural resources and adjoining
properties. If, following the commencement of this project, the erosion
and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to insure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your
compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Letter of Approval with Modifications
City of Greensboro
November 24, 2020
Page 3 of 4
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you
provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an
amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference. Your cooperation is appreciated.
Sincerely,
ack Dalton
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
Modifications Required for Approval
cc: Westcott, Small, & Associates
ATTN: Victoria Waldron Small, PE
125 S. Elm Street, Suite 606
Greensboro, NC 27401
WSRO
Letter of Approval with Modifications
City of Greensboro
November 24, 2020
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Peeler Community Recreation Center Parking Lot Improvement
Project ID: GUILF-2021-009
County: Guilford
1. Additional measures may be required - The applicant is responsible for the
control of sediment on -site. If the approved erosion and sedimentation
control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site.
[15A NCAC 4B .0115]
2. Any off -site borrow and waste required for this project must come from a
site with an approved erosion control plan, a site regulated under the
Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any
activities on site must be disposed of at a facility regulated by the Division
of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 413.0110]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities