Loading...
HomeMy WebLinkAboutWQ0015532_Permit (Issuance)_19980629r State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Govemor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director June 29, 1998 Mr. Delane Jackson Town of Bladenboro P.O. Box 455 Bladenboro, North Carolina 28320 A �� 11:3 la Nit i 1 021995 FAYETTEV L .f: REG. OFF'iCE Subject: Permit No. WQ0015532 Town of Bladenboro Industrial Drive Wastewater Collection System Bladen County Dear Mr. Jackson: In accordance with your application received June 25, 1998, attached is Permit No. WQ0015532, dated June 29, 1998, to the Town of Bladenboro for the construction and operation of the subject wastewater collection extension. This permit shall be effective from the date of issuance until rescinded and you shall be subject to the conditions and limitations as specified in the North Carolina Gravity Sewer Design Criteria adopted February 12, 1996 and the attached permit. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 880 linear feet of 8 inch gravity sewer to serve 100 office employees at Industrial Drive, and the discharge of 17,500 GPD of collected domestic and industrial wastewater into the Town of Bladenboro's existing sewerage system, pursuant to the application received June 25, 1998, and in conformity with the North Carolina Gravity Sewer Design Criteria. The sewage and wastewater collected by this system shall be treated in the Town of Bladenboro Wastewater Treatment Facility (NPDES Permit No. NC0026352) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other govemment agencies (local, state, and federal) which have jurisdiction. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper 3 If you need additional information concerning this matter, please contact Marcia Eaddy at (919) 733-5083 extension 524. Sincerely, r A. Preston Howard, Jr., P.E. cc: Bladen County Health Department Fayetteville Regional Office, Water Quality Section Universal Engineering & Design, L.L.P. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH GRAVITY SEWER COLLECTION SYSTEMS PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1 This permit shall become voidable unless the facilities are constructed in accordance with the conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12, 1996. 2. This permit is effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The facilities must be properly maintained and operated at all times. 4. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality (Division) accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of this permitted facility, a certification and a copy of the record drawings (i.e., as constructed plans) must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the Division of Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a fmal certificate of completion once the entire project has been completed. A copy of the record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Certification and one (1) copy of the "Record Drawings" to the Non -Discharge Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-0535. 7. A copy of the Record Drawings shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. 8. Failure to abide by the conditions and limitations contained in this general sewer permit or the North Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 9. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater collection facilities. 1 10. Noncompliance Notification: The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number (910) 486-1541, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five (5) days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the 29th day of June, 1998 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION rQv A. Preston oward, Jr., P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0015532 2 Permit No. WQ0015532 June 29, 1998 ENGINEER'S CERTIFICATION Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Project Name Location and County Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, the certificate of coverage, the North Carolina Gravity Sewer Minimum Design Manual, and other supporting materials. Signature Registration No. Date The above Engineer's Certification must be completed and submitted to the address below with one (1) copy of the "Record Drawings" (i.e., as -constructed plans) of the wastewater collection system This project shall not be considered complete and allowed to operate until this Engineer's Certification and the "Record Drawings" plans have been submitted. Any wastewater flow made tributary to the wastewater collection system prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. NORTH CAROLINA DIVISION OF WATER QUALITY WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 3 State of North r nrolina Department of Environment, Health and Natural Resources Division of Environmental Management NON -DISCHARGE PERMIT APPLICATION GRAVITY SEWER COLLECTION SYSTEMS This form may be photocopied for use as an original. Pump Stations, force mains and low pressure sewers (including S.T.E.P. systems) are not to be included as part of this application package. Any changes made to the content of this form shall not be allowed and will result in the application being returned. This -application will not be accepted by DEM unless all of the applicable items are included with the submittal. 1. REQUIRED ITEMS CHECKLIST: please indicate that you have read the following list of application requirements by signing your initials in the space provided next to each item. Applicant's Initials 1. One original and one copy of the completed and properly executed application form. 2. The appropriate pc. —:it processing fee, in accordance with 15A NCAC 2H .0205(c)(5). The fee for sewer extensions is S.C.O. The fee for sewer extension by partially delegated municipalities (applies only to these governmental jurisdictions that have specific delegation review authority, as granted by the Division of Environmental Management) is S200. 3. If the owner/authority of the wastewater treatment facility (W l r) and/or collection system that will be accepting the wastewater flow from this project is different from the applicant of the project, then a letter(s) must be provided from the owner/authority of the WWTF and/or collection system specifying the volume of flow that will be accepted. The leuer(s) should be recent (within one [11 year) and should refer to the project by the same name as that identified on the application and the plans/specifications. j—g---- 4. If the application is being submitted in the name of a privately owned public utility, written documentation must be submitted from the Utilities Commission which demonstrates that the utility is authorized to hold the franchise for the area to be served. In the case of contiguous service areas, written documentation, must be provided from the Utilities Commission acknowledging these areas are covered under an existing franchise. 5. One original and two copies of a properly executed Operational Agreement must be submitted if the sewer extension will be serving single family residences, condominiums, or town houses AND if the subject sewer extension is owned by the individual residents, a homeowners association, or a developer. II. PERMIT INFORMATION: SOC Project: Yes X No. 1. Application Number (will be completed by DEM): VOQV ‘653z 2. Specify whether project is: X new.modification. 3. If th;s application is being submitted as a result of a modification to an.existing permit, please complete: existing permit number and permit issue date 4. Specify whether the applicant is: X public private. 5. Application Date: 31.1n a 16 , 19 9 8. 6. Fee Submitted: S !a t ; rt _ n n 7. County(ics) where project is located: B 1 a d e n 8. App:icant'sName (Please specify the name of the municipality, corporation, individual, ems.j;�' Town of' Bladenboro �" 2 5 1998 ) FORM: GSPA 02J96 Page 1 of 4 izEc,:!Ji4Jr''"3.°'ar,AGEMENT - ANCfi 1,400 copies of this do:umcnt were printed at a cost of SI 17.32, or SC2.082. per copy. III. GENERAL INFORMATION: 1. Print Owners or Sicning Official's name and agile (the person who is legally responsible for the facility and its compliance): Delane Jackson, Town Manager 2. Mailing address: Post Office Box 455 City: Bladenboro State:North Carolina Zip: 28320 Telephone Number ( 910 863-3655 Project Name (Please specify the name of the subdivision, facility, or establishment. The name should be consistent with the project name on plans, specifications, letters of flow acceptance, Operational Agreements, etc.): Sanitary Sewer Extension For the Town of Bladenboro — Industrial Drive IV. INFORMATION ON WASTEWATER: 1. Nature of Wastewater: 14 % Domestic/Commercial 86 % Industrial % Other (specify) 2. Volume of wastewater generated by this project: 17 , 500 gallons per day. 3. Explanation of how wastewater volume was determined: Domestic : 100 employees x 25 gpd/ern.. _ 25nn Process : 15,000 gpd gpd 4. Name of wastewater treatment facility receiving wastewater. Town of Bladenboro W W T P Owner of wastewater treatment facility: Town of Bla'denboro Facility Permit Number: NCO() 26352 or WQ 5. Indicate any parameters (and their concentrations) which will be greater than normal domestic levels: N/A 6. If wastewater is not domestic in nature, what level of pretreatment has been provided to ensure protectioat of the receiving wastewater treatment facility? 7. Ira pretreatment permit is required, has one been issued? Yes No. If Yes, please atuch a copy of the pretreatment permit. If No, when will one be issucd? FORM: GSPA 02/96 Page 2 of 4 V. DESIGN INFORMATION: 1. Summary of GRAVITY SEWER to be permitted, by diameter and length: Diameter (inches) Leneth (linear feet) 8 880 i 2. Are there any sections of the Gravity Sewer Minimum Design Criteria or 1SA NCAC 2H .0200 with which the subject wastewater collection system will not be able to comply? Yes X No. If Yes, please identify and explain: . . IMPORTANT:. If you responded Yes to question V.2 above, the completed application package, jncluding two (21 copies of plans. specifications, supporting information and anv other materials, should be submitted for an individual permit. FORM: GSPA 02/96 Page 3 of 4 VI. CERTIFICATIONS: Name and Complete Address of Engineering Firm: 1622 South Madison Street City: Whiteville Universal Engineering & Design, L.L.P. State: North f'arn1 i na Zip: 28472 Telephone Number: ( 910 ) 6 4 1 - 0 311 Professional Engineer's Certification: R. Allen Waddell I , attest that this application for Sanitary Sewer Extension For the Town of Bladenboro - Industrial Drive has been reviewed by me and is accurate and complete. I further attest the proposed design has been prepared in accordance with the applicable regulations and the North Carolina Gravity Sewer Minimum Design Criteria adopted February 12, 1996. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed desigti. ``ttuu►uiil�iiii *$." Ft•SS/p••.•9 North Carolina Professional Engineer's Seal, Signature, and Date: Applicant's Certification: Delane Jackson '= 023004 s '%,<<fN iWPO?`` 6 -16 attest that this application for Sanitary Sewer Extension For the Town of Bladenboro - Industrial Drive has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required pare of this application arc not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Upon approval and completed construction. I will operate this system in accordance with the North Carolina wastewater cone,: 'on gcrmit requirements. )LJahtQd Signature Date 6-(7-q,( THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORM1AT7ON AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION PERMITS AND ENGINEERING UNIT POST OFFICE BOX 29535 RALEIGH, NORTH CAROLINA 27626-0535 TELEPHONE NUMBER: (919) 733-5083 FORM: GSPA 02/96 Page 4 of 4 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Wayne McDevitt, Secretary A. Preston Howard, Jr., P.E., Director R. Allen Waddell Universal Engineering & Design, L.L.P. 1622 South Madison Street Whiteville, NC 28472 Dear Mr. Waddell: DENR RECEIVED December 1, 1998 DEC 0 2 199E FAYETTEV LLE REG. OFFICE Subject: Permit No. WQ0015532 Industrial Drive Sewer- Public Bladen County The division's Regional/Program Management Coordination Branch has received your signed and sealed certification with as builts. This will be forwarded on to the Fayetteville Regional Office for approval. If it would be helpful to discuss this matter further, I would suggest that you contact the. Water Quality Regional Supervisor at the Fayetteville Regional Office at (910) 486-1541. n Palumbo, E.I.T. nvironmental Engineer cc: Fayetteville Regional Office, Water Quality Section Central Files Delane Jackson, Town Manager, Town of Bladenboro P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper