GENERAL NOTES:
�
2.
3.
THIS SURVEY WAS PROVIDED TO DEWBERRY BY PROGRESS ENERGY CAROLINAS, INC. SURVEY BY STEWART ENGINEERING.
NEW STRUCTURE LOCATIONS AND PROFILES WERE PROVIDED TO DEWBERRY BY PROGRESS ENERGY CAROLINAS, INC. AND ARE
FOR REFERENCE ONLY. PROFILES AND NEW STRUCTURE �AYOUTS SHALL NOT BE USED FOR CONSTRUCTION.
WETLAND LOCATIONS AND OTHER JURISDICTIONAL FEATURES WERE DELWEATED BY ENVIRONMENTAL SERVICES, INC. WETLAND
FLAGS HAVE NOT BEEN SURVEYED AND WERE LOCATED BY GPS. LOCATIONS SHOWN ARE APPROXIMATE.
4.
ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT DISTURB UTILITY
POLES, GUY WIRES, OR ANCHORS VVITHOUT PERMISSION FROM PROGRESS ENERGY CAROL.INAS, INC.
5. SEE SHEET 3 FOR EXISTING CONDITIONS AND NEW WORK LEGEND.
6. SEE SHEET 7 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE.
7. SEE SHEETS 8 AND 9 FOR TEMPORARY BRIDGING AND TEMPORARY CROSSING REQUIREMENTS. AS BEST AS POSSIBLE, ALL
BRIDGES SHALL BE INSTALLED PERPENDICULAR TO THE CHANNEL. TEMPORARY CROSSIRIGS SHALL BE COMMERCIALLY
CONSTRUCTED COMPOSITE MATS AND USED FOR PROPOSED CONSTRUCTION ACCESS THROUGH THE WETLANDS.
8. PROPOSED CONSTRUCTION ACCESS PLAN SHALL BE APPROVED BY PROGRESS ENERGY CAROLINAS, INC. PERSONNEL PRIOR TO
BEGINNING CONSTRUCTION.
9. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ACCURATELY LOCATE BOTH HORIZONTALLY AND VERTICALLY ALL EXISTING UTILITIES PRIOR THE START OF CONSTRUCTION. THE
CONTRACTOR SHALL NOTIFY THE NC ONE CAL� CENTER OR THEIR SUCCESSOR AT 1-800-632-4949 PRIOR TO EXCAVATION.
CONTRACTOR SHALL NOTIFY PROGRESS ENERGY CAROLINAS, INC. IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY
UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE
CONTRACTOR.
10. THIS SURVEY HAS BEEN SUPPLEMENTED WITH GIS DATA OBTAINED FROM VARIOUS SOURCES. AERIAL PHOTOGRAPHY PROVIDED BY
NC ONE MAP. CONTOURS ARE FROM LIDAR DATA AND ARE SHOWN IN AN APPROXIMATE MANNER ONLY. CONTOUR INTERVALS ARE2
FOOT.
11. TOTAL DISTURBED AREA = 0.56 ACRES
�`� � � �` �, � � � t ;:.
ks
P`•00�
•:•�1
14050�1
e`•�•�e
�.�.�
Dewberry & Davis, Inc.
2301 REXW�OQS DRIVE
SUITE 20Q
RALEIGH, NC 27612
PHONE: 919.881.9939
F,4X: 919.88i.9923
NCBELS # F-0679
y11
GRAPHIC SCALE
0 250 500 1000
, I .-----
( IN FEET )
1 inch = 500 ft.
�/i