HomeMy WebLinkAbout20111089 Ver 1_401 Application_20111211�� Pro ress Ener
t�� 9 9Y
December 7 2011
Ms Karen Higgins Supervisor
NC Division of Water Quality 401/Wetlands Unit
Department of Environmental & Natural Resources
1650 Mail Services Unit
Raleigh NC 27699 1650
20111089
� ���� a �e
� � � � 4� �
�
DEC 1 3 2011
DENR WATER GUAL►i1
yVETIANGa AND STOR�dWA7ER e���
Sub�ect Progress Energy Carolinas City of New Bern — Lewis Farm Road 115kV Tap Line
Rebuild
Pre Construction Notification (PCN) Form
Section 401 Water Quality Certification ��� � j-j�
L✓
�
Dear Ms Higgins �'"
Progress Energy Carolinas (PEC) proposes to rebuild approximately 3 0 miles of transmission lines
located entirely within an existing 70 right of way (ROW) off Catfish Lake Road near New Bern NC in
Craven County
The construction area will encompass approximately 32 acres However new land disturbing activities
within the construction area will be less than 0 2 acre for a permanent access road all other work will be
structure/line replacement within the existing cleared ROW The access road is needed to
accommodate annual maintenance on new line switches being installed
The access road is approximately 300 in total length 16 wide (ABC stone) with 2 shoulders totaling 20
in width The proposed access road will actually be an upgrade of an existing unimproved access road
NCDOT is requiring that the access road meet its specifications including a 30 by 20 asphalt apron The
road will then narrow to 16 in width A locked gate will be installed at the entrance Typical road
building equipment will be used for construction of the access road
Parts of the access road will be located in a wetland area totaling < 0 2 acres A Pre Construction
Notification (PCN) Form is enclosed and we are seeking approval for the pro�ect under CWA Sections
404 and 401 Impacts to wetlands have been minimized to the extent possible given the existing line
infrastructure
PEC is proposing to start this pro�ect in mid January 2012 and expects the line rebuild to be completed
in late May 2012 The access road will not be constructed until all approvals have been received
Progress Energy Carolmas Inc
P 0 Box1551
Raleigh NC D602
Overview
Construction of the line will involve replacing wood H frame pole structures without foundations and
stringing new conductors Since this is a rebuild pro�ect there will be no new clearing activity other
than the minimal amount (less than 10 acre) assoaated with the proposed access road
Structures will be direct buried i e set by auguring a hole setting the pole and replacing the native
material in and immediately around the structure No off site material (gravel concrete etc ) will be
used nor will any excess material be taken off the site New conductor will then be strung
Progress Energy has made every effort to minimize impacts of this line in construction methods used
For example the existing ROW does include considerable wetlands areas Those areas will be matted
to avoid equipment damage to the extent possible
Standard Right of Way Clearing Practices
The ma�ority of the proposed pro�ect (structure/conductor replacement) will be conducted within the
existing cleared ROW
Any areas of bare soil exposed during the work will be seeded and mulched according to the enclosed
specifications
No �urisdictional streams wetlands or Neuse River Buffer areas are located on the pro�ect site
The following construction sequence is planned
1 Old structures and conductor will be removed from the site and properly disposed of
and/or recycled Holes will be augered and new structures will be installed and holes
backfilled with the removed soil using direct bury method Any remaining soil will be
spread uniformly around the structures and the specified ground cover provided
(depending upon space and terrain this step may occur either before or after
conductors are installed) New Conductor will then be installed and the line energized
2 For consistency with the new NPDES stormwater permit for construction activities PEC
will commit to providing ground cover throughout the pro�ect within 7 days on
perimeter areas and slopes greater 3 1 and ground stabilization in 14 days on other
areas (although no grading is proposed for line construction minor surface touch up
will be done if any equipment inadvertently causes ruts)
3 Following completion of the pro�ect and installation of a ground cover the temporary
construction entrance and erosion control measures will be removed
Please note that we have also applied for authorization from the US Forest Service US Army Corps of
Engineers and NC DENR Land Quality Section (courtesy notification only since the land disturbance is
less than 1 acre)
Should you or others of the Division of Water Quality wish to visit this pro�ect please contact Mr Cliff
Sauls �n the Environmental Permitting and Compliance Unit at 919 546 5480 (office) 919 500 1680 (cell)
or cliff sauls@p�nmail com (e mail)
Thank you for your consideration
Sincerely
�
. 4� �
Caren 6 Anders
Vice President
Transmission Operations and Planning
CBA/cts
Enclosures
1 Pre Construction Notification (PCN) Form
2 Letter to US Army Corps of Engineers
3 Map/Plan
4 Fee check ($240)
cc Ms Julie Moore — US Forest Service
Mr David Lekson — US Army Corps of Engineers
\O��F W ATFRQG
� �
> .:�
O �C
2 0 1 1 1 0 8 9
Office Use Only
Corps action ID no
DWQ pro�ect no
Form Version 1 3 Dec 10 2008
Pre-Construction Notificatton PCN Form
A A licant Information
1 Processing
1 a Type(s) of approval sought from the
Corps � Section 404 Permit ❑ Section 10 Permit
1 b Specify Nationwide Permit (NWP) number 12 or General Permit (GP) number
1 c Has the NWP or GP number been verified by the Corps� ❑ Yes � No
1 d Type(s) of approval sought from the DWQ (check all that apply)
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Ripanan Buffer Authonzation
1 e Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit
because written approval is not required� Certification
❑ Yes � No ❑ Yes � No
1f Is payment mto a mitigation bank or in lieu fee program proposed for mitigation � Yes � No
of impacts� If so attach the acceptance letter from mitigation bank or m lieu
fee program
1 g Is the pro�ect located in any of NC s twenty coastal counties If yes answer 1 h � Yes ❑ No
below
1 h Is the pro�ect located withm a NC DCM Area of Environmental Concern (AEC)� ❑ Yes � No
2 Pro�ect Information
2a Name of pro�ect Progress Energy Carolmas City of New Bern Lewis Farm Road POD 115kV Tap Line
2b County Craven
2c Nearest murncipality / town New Bern
2d Subdivision name N/A
2e NCDOT only T I P or state
pro�ect no
3 Owner Information
3a Name(s) on Recorded Deed Carolina Power & Light Co d/b/a Progress Energy Carolinas
3b Deed Book and Page No Linear electnc utility with perpetual easements from underlymg property owners
3c Responsible Party (for LLC if Caren B Anders Vice President Transmission Operations and Planrnng
applicable)
3d Street address TPP 18 100 East Davie Street
3e City state zip Raleigh NC 27601
3f Telephone no 919 546 7497
3g Fax no 919 546 7175
3h Emad address caren anders@pgnmad com � 3
��'�� �ATER, BR,ANCk
Page 1 of 11
PCN Form — Version 1 3 December 10 2008 Version
4 Appl�cant Information (if different from owner)
4a Applicant is ❑ Agent ❑ Other specify
4b Name
4c Business name
(if applicable)
4d Street address
4e City state zip
4f Telephone no
4g Fax no
4h Emad address
5 Agent/Consultant Information (if applicable)
5a Name Cliff Sauls
5b Business name Progress Energy Carolmas Environmental Permitting and Compliance
(if apphcable)
5c Street address 100 East Davie Steet
5d City state zip Raleigh NC 27601
5e Telephone no 919 546 5480 (office) 919 500 1680 (cell)
5f Fax no 919 546 6386
5g Emad address cliff sauls@pgnmad com
Page 2 of 11
PCN Form — Version 1 3 December 10 2008 Version
B Pro�ect Information and Prior Pro�ect History
1 Property Identification
1a Property identification no (tax PIN or parcel ID) Perpetual easement over multiple tracts
1 b Site coordinates (in decimal degrees) Latitude 34 960425 Longitude 76 98173
(DD DDDDDD) ( DD DDDDDD)
1 c Property size 32 acres
2 SurFace Waters
2a Name of nearest body of water (stream nver etc ) to Great Branch
proposed pro�ect
2b Water Quality Classification of nearest receiving water C Sw NSW
2c River basin Neuse
3 Pro�ect Description
3a Describe the existing conditions on the site and the general land use in the vicirnty of the pro�ect at the time of this
application
Currently an electncal overhead transmission Ime occupies the Right of Way (ROW) The surrounding areas are pnmarily
forested with the exception of the existing already cleared ROW Pro�ect is to rebuUd existing transmission line replacmg
end of life structures and conductors
3b List the total estimated acreage of all existing wetlands on the property
6 62 acres
3c List the total estimated linear feet of all existmg streams (intermittent and perenrnal) on the property
1 mtermittent stream at 103 m length
3d Explain the purpose of the proposed pro�ect
Progress Energy Carolinas (PEC) proposes to rebudd approximately 3 0 miles of powerline located entirely with in
existmg ROW A new access road has been requested for construction to accommodate annual maintenance on a two
Ime switches It is PEC s determination the access road will have less impact in the future during annual maintenance
than not constructing an access road and instead of dnvmg overland
3e Descnbe the overall pro�ect in detail including the type of equipment to be used
Access road with is approximately 300 in total length 16 wide (ABC stone) with 2 shouiders totaling 20 in width Access
road will extend off of existing state maintained DOT road by a 30 by 20 asphalt apron then narrowing 16 m width Road
building equipment will be used for construction of the access road Parts of the access road will be located m W1
wetland area totaling < 0 2acre of fill
4 Jurisdictional Determinations
4a Have �unsdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
pro�ect (including all prior phases) in the past� ❑ Yes � No ❑ Unknown
Comments (Not until current pro�ect) Existing Transmission
Lme was built in 1942
4b If the Corps made the �urisdictional determmation what type � prelimmary � Final
of determmation was made�
4c If yes who delineated the �urisdictional areas� Agency/Consultant Company
Name (if known) ESI Robert Turnbull Other ESI
4d if yes list the dates of the Corps �urisdictional determinations or State determinations and attach documentation
10/27/2011 met with Wdliam Wescott Documentation m progress at Corps
5 Pro�ect H�story
5a Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this pro�ect (includmg all prior phases) m the past�
5b If yes explain m detad according to help file instructions
(Not untd current pro�ect) Existing Transmission Line was built in 1942
Page 3 of 11
PCN Form — Version 1 3 December 10 2008 Version
6 Future Pro�ect Plans
6a Is this a phased pro�ect� ❑ Yes � No
6b If yes explain
Page 4 of 11
PCN Form — Version 1 3 December 10 2008 Version
C Proposed Impacts Inventory
1 Impacts Summary
1 a Which sect�ons were completed below for your pro�ect (check ail that appiy)
� Wetlands ❑ Streams tnbutanes ❑ Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a 2b 2c 2d 2e 2f
Wet�and �mpact Type of �unsdiction
number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact
Permanent (P) or (if known) DWQ — non-404 other) (acres)
Tem ora
W1 � P❑ T Roadfdl Pine Flat ❑ Yes � Corps �� 2
� No ❑ DWQ
W2 � p� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g Total wetland �mpacts
2h Comments
3 Stream Impacts
If there are perennial or mtermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a 3b 3c 3d 3e 3f 3g
Stream impact Type of impact Stream name Perennial Type of �unsdiction Average Impact
number (PER) or (Corps 404 10 stream length
Permanent (P) or intermittent DWQ — non 404 width (linear
Temporary (T) (INT)� other) (feet) feet)
S1 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S2 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S3 ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S5 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h Total stream and tr�butary �mpacts
3i Comments
Page 5 of 11
PCN Form — Version 1 3 December 10 2008 Version
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuaries tnbutaries sounds the Atlantic Ocean or any other open water of
the U S then indwiduaily list ali open water impacts below
4a 4b 4c 4d 4e
Open water Name of waterbody
impact number — (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P�T
4f Total open water �mpacts
4g Comments Proposed line wdi not impact open water other than Section 10 crossmg
5 Pond or Lake Construction
If ond or lake const�uction ro osed then com lete the chart below
5a 5b 5c 5d 5e
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Fdled Excavated Flooded Fdled Excavated Flooded
P1
P2
Sf Total
5g Comments
5h Is a dam high hazard permit required�
❑ Yes � No If yes permit ID no
5i Expected pond surface area (acres)
5� Size of pond watershed (acres)
5k Method of construction
6 Buffer Impacts (for DWQ)
If pro�ect wdl impact a protected npanan buffer then complete the chart below If yes then mdividually list all buffer impacts
below If an im acts re uire miti ation then ou MUST fdl out Section D of this form
6a
❑ Neuse ❑ Tar Pamlico ❑ Other
Pro�ect is m which protected basin� ❑ Catawba ❑ Randleman
6b 6c 6d 6e 6f 6g
Buffer impact
number — Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora T im act re uired�
B1 ❑P�T ❑Yes
❑ No
62 ❑P❑T ❑Yes
❑ No
63 ❑P❑T ❑Yes
❑ No
6h Total buffer �mpacts
6i Comments
Page 6 of 11
PCN Form — Version 1 3 December 10 2008 Version
D Impact Justificat�on and Mitigation
1 Avoidance and Mimmization
1a Specifically descr�be measures taken to avoid or mmimize the proposed impacts m desigrnng pro�ect
The designed access road is to be as narrow as possible given DOT entry requirements and safety considerat�ons for
equipment
1 b Specifically descnbe measures taken to avoid or mmimize the proposed impacts through construction techrnques
Mirnmize placement of matenals in wetlands use stone only if possible (no fill dirt) limiting acces by gatmg road
2 Compensatory Mitigation for impacts to Waters of the U S or Waters of the State
2a Does the pro�ect require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U S or Waters of the State�
2b If yes mrt�gation �s requ�red by (check all that apply) ❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes which mitigation option will be used for this � payment to in lieu fee program
pro�ect�
❑ Permittee Responsible Mitigation
3 Complete if Usmg a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter) Type Quantity
3c Comments
4 Complete �f Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached ❑ Yes
4b Stream mitigation requested linear feet
4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only) square feet
4e Ripanan wetland mitigation requested acres
4f Non nparian wetland mitigation requested acres
4g Coastal (tidal) wetland mitigation requested acres
4h Comments
5 Complete if Using a Permittee Respons�ble M�t�gation Plan
5a If usmg a permittee responsibte mitigation plan provide a description of the proposed mitigation plan
Page 7 of 11
PCN Form — Version 1 3 December 10 2008 Version
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Wdl the pro�ect result m an impact within a protected npanan buffer that requires ❑ Yes � No
buffer mitigation�
6b If yes then identify the square feet of �mpact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c 6d 6e
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1 5
6f Total buffer mit�gation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsibie npanan buffer restorat�on payment into an approved in lieu fee fund)
6h Comments
Page 8 of 11
PCN Form — Version 1 3 December 10 2008 Version
E Stormwater Management and Diffuse Flow Plan (required by DWQ)
1 Diffuse Flow Plan
1 a Does the pro�ect mclude or is it ad�acent to protected riparian buffers identified � Yes ❑ No
within one of the NC Ripanan Buffer Protection Rules�
1 b If yes then is a diffuse flow plan included? If no explain why
Comments Pre existmg ❑ Yes � No
2 Stormwater Mana ement Plan
2a What is the overall percent imperviousness of this pro�ect? 0 34 %
2b Does this pro�ect require a Stormwater Management Plan� ❑ Yes � No
2c If this pro�ect DOES NOT require a Stormwater Management Plan explain why sheetflow
2d if this pro�ect DOES require a Stormwater Management Plan then provide a bnef narrative descnption of the plan
❑ Certified Local Government
2e Who will be responsible for the review of the Stormwater Management Plan� ❑ DWQ Stormwater Program
❑ DWQ 401 Urnt
3 Cert�fied Local Government Stormwater Review
3a In which local government s �unsdiction is this pro�ect� N/A
❑ Phase II
3b Which of the following locally implemented stormwater management programs ❑ NSW
apply (check all that apply) ❑ USMP
❑ Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached�
4 DWQ Stormwater Pro ram Rev�ew
� Coastal counties
❑ HQW
4a Which of the following state implemented stormwater management programs apply � ORW
(check all that apply) ❑ Session Law 2006 246
❑ Other
4b Has the approved Stormwater Management Plan with proof of approval been
attached� ❑ Yes ❑ No
5 DWQ 401 Umt Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements� ❑ Yes ❑ No
5b Have all of the 401 Urnt submittal requirements been met� ❑ Yes ❑ No
Page 9 of 11
PCN Form — Version 1 3 December 10 2008 Version
F Supplementary Information
1 Environmental Documentation (DWQ Requirement)
1a Does the pro�ect involve an expenditure of public (federal/state/locai) funds or the � Yes ❑ No
use of pubiic (federai/state) land�
1 b If you answered yes to the above does the pro�ect reqwre preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolma) Environmental Policy Act (NEPA/SEPA)�
1c If you answered yes to the above has the document review been finalized by the
State Cleanng House� (If so attach a copy of the NEPA or SEPA final approval
letter ) ❑ Yes ❑ No
Comments
2 Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 26 0200)�
2b Is this an after the fact permit appiication� ❑ Yes � No
2c If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3 Cumulative Impacts (DWQ Requirement)
3a Wdl this pro�ect (based on past and reasonably anticipated future impacts) result m � Yes � No
additional development which could impact nearby downstream water quality�
3b If you answered yes to the above submit a qualitative or quantitative cumulatwe impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4 Sewage Disposal (DWQ Requirement)
4a Clearly detad the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed pro�ect or avadable capacity of the sub�ect facdity
No wastewater wdl be generated
Page 10 of 11
PCN Form — Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Crit�cal Habitat (Corps Requirement)
5a Wdl this pro�ect occur m or near an area with federally protected species or � Yes � No
habitat�
5b Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts�
� Rale�gh
5c If yes indicate the USFWS Field Office you have contacted
❑ Ashevdle
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Cntical
Habitat�
6 Essential Fish Habitat (Corps Requirement)
6a Wdl this pro�ect occur in or near an area designated as essential fish habitat� ❑ Yes �I No
6b What data sources did you use to determme whether your site would impact Essential Fish Habitat�
7 H�stor�c or Preh�storic Cultural Resources (Corps Requirement)
7a Will this pro�ect occur m or near an area that the state federal or tribal
governments have designated as havmg histonc or cultural preservation � Yes � No
status (e g National Historic Trust designation or properties significant in
North Carolma history and archaeology)�
7b What data sources did you use to determme whether your site would impact histonc or archeological resources�
8 Flood Zone Designation (Corps Requirement)
8a Wdl this proJect occur in a FEMA designated 100 year floodplain� ❑ Yes � No
8b If yes explain how pro�ect meets FEMA requirements
8c What source(s) did you use to make the floodplain determmation�
Caren B Anders �.�) Zr ((
ApplicanUAgents Pnnted Name ApplicanUAgents Signature Date
(Agent s signature is valid only if an authonzation letter from the applicant
is rovided
Page 11 of 11
PCN Form — Version 1 3 December 10 2008 Version
�
�
L
�
�
W
y
�
4�
�
�
�
�
U
z
�
. �'
a�
�
�
U
�
�
�
�
0
�
�
U
�
L
N
W
�
�
N
L
�
O
�
�
W
z
J
Q
�
>
�
�
�
oQ
oz
��
o°
a U
�
�_
��
��
Q
��
�
�z
-�
�o
W U
J z
, �
Z �
� U
W
m
�
W
Z
L�
O
�
�
U
O O O O O O O O O �
lL LL LL LL LL Ll lL LL LL �
� 0 � � 0 0 0 � � Q
� N M�� fO 1� a0 O)
H H H H F- F- H f- H H
S S 2 2 2 2 2= S 2
� � � � � � � � � �
� � � � � � � � � �
� � � � � � � � � �
� � � � � � � � � �
� � � � � � � � � �
r' � r r���� r r
U U U U U U U U U U
�
W
Q
Z Z Z Z Z
�J J J J J
a a a a
W J J J J
Z � � � Q
� � � � �
� � Q � �
� U U U U
oZZZZ
>0000
J � � � �
F O O O O
V � � � �
W W W W W
!q W � Z Z Z Z
�aaaa
a
Z� J W W W W J J J J
� W � � � � � Q Q Q ¢
d' O��W �W W�W W W W W
❑UOwrncnu�❑��o
�
�
Q
rs
r
��
...,�
��
`E
...�
,!
,. j�
J
0
N
�
T�
w
�
� zl
L
� -
_
W
N
�
i� -
�
O�
�
C� i
0
0
a
0
a
° -
f
� £ o
a
�w
z
�, w _
3
Jw -
wa N
J� _
�
w
Z Y �
� � �
W-' Z U 2 3
m ^ U 0
3
w
Z
� �
o "
r zo � LL ,.
U
���,�2�!P�����f ••��
:�°; �:
,, r �'lry M ��:
?.
�
C�c.
� �
��
� �d
� �
� .
� �
��
z
aQ
w u
0.�
�-
�u
�
� u
Z Z
E f
= ¢
��
�oQ
_ Z
cn '- o
z z � �
m-
3 3 N �
� � . -
0 o m M
z �
00
� �
� o
mmJ
���
�m
mm
��
� �8=���
� � ^v�°��
�;v
��
�
��
A3
O
t��'
W mrv
w
�i � ��d
~ r m O NJ
� O Z � j
N U O� O a�{�
O K Q a W = Z
� m a
m y a � �
� O u w a � �
w V W Z y O
O�� O w a O
U tt O = � �
�FdwF az
y a � w �
0 o a w
�� y z Q w z
���g�Q ��
`-' � m � � o �
rwFZa ai�
r � a�� O O
K
���+a� j6d
¢Zw°u�i s
¢ X � ? U � ?
N
� � W 2 � Z �
�J�"w a
�`__� ow
g��o� <a
Z rc � � � o °z
o�'w�Z ya
p � a w ¢ � o
J� v w w 3�
Z Q Z N � O O
3 r p m� w
m ti Z � d � � �
w � a
� = F a �w d w
mx��� �<
� w i z F w � �
C7 ��=0 V�0 °
?� tn m O = U m
Z
% � p F � p W a �
W F U U� U� �� `�
w N z �
r¢q �� o Z N O O F
Z¢ U S� V r Z O O
Q
J Jj
m Q
� W �
sg
�o�
�nw3
m m x
ui � a=
j f� N j
r
w Z � �
U � � r
U' � O N
O W V V
w �>Q
o i 4� o
Q tNil a U
w O E �
Z U F �
W )
Z � � Z O
� N 4 � W
�
Y
� Z ~ = O
a�
3 � ¢ o a
�
z o =�o
� < o�o
� V W
t/1 W m O �
O � � W �
o a Q
p N
z a o a r
� Q w w E
c� z � _
y N � u�i O
x C m ?
W �
K K Z m �
O O Q� � o
N a F
r �W r y U
N N � �
w w w C O
41 N N m U
N V
Z N N
1 N
K F=- Z
W
Z
W
� � rv
�
B
�
�
O
�
a
J
H
U
W
i
�
a
J
J
a
�
w`
/
O
�`
r
Z
o N
o w
�
� z o 0
�i - a Z
L � � -
A` C`
W F �
� _ � W m
Q Z £ O
W '� w `�
Z�
ti � � °� -
3 J
i/i - w a �
a� J � ° _ _
� _ >
a� ' `
z Y J
O J � lfl � z
W -� U t Q
L °� - w �
� s -'
w °
� Z �
� J
C� � � J � u _
1 � o �
>
U O -
� m m _
E E f
•°�P�,��i�'%� �n cn
,•'��,�r _•�'�, - � ¢ -
��: �-fy
Jg ��a - �: _ _
w �:
, I �lh �.. ...: e•''':
...�
, C�
Z Z
�f
��
��
0 o Q
z
��
:J U � �
Z Z m �
3 3 N �
2 � .
� O m �
z z �O
0 0
> >
_ �
� o
m �
9 m J
'9 N m J
9 � e
� m
g
Q �8
U
� LL
U �
� ? c
� o
Q � �
�
� �
�•1 3���m�
� �'N�°��
V�
m
��
A�
�
r;� ;;
�t�S�J►'
` /
l
lll
I
I
I
il
�.
I
�� :� _'
��� �I Y:.. '��..
�
�
x. a.� - r.. �]^�'��
i
r '"�„�" °
` ,f ..
�� t �� .�.�+I.! ��\
•.��.. 1 °`. � . . .iWI�S
r F r .., ` ��ys
������� � � � � �
t}
a� ,� �s'�e e .,�.�
�.e�..; � � � ` � .'' 'S�`'�".�
� c�,� j� �� � ,, r' 1.�
r, `a � ��; ;
�� _,�
_ ���
' { �' :-:,� ', ` • ,+
* . ,K �� �
�.� _�,
�
E,
� �..
�
a
p,.� ��1� �
J p \ !�
/ {/
ni ! (_.
��. � ���
� �
�.`.. .
.,.� s. ,
�
�
�
�� �
��
��,
��f' '�
� �� /�
��� �, �
o°
a
� ? a a
J
� o� ° a
�
� �° � � m
a ¢ F `°
W 4w Z a
Zo
V� `� `� " -
J
yw` - wa o -
W J a _ '
� N
L}� = � p
�// Z Y �
O . � lll w ? - u
w.. �
L m^ Z o tn u o
� 3 a
W
Z Z w
C/� � w
_-' c, O � u n LL'
J��°o_
N
U
�.� m m
f E f Q
��'�F,. � � u� �n �n
: ��\ , �•�: � � U
:2: y�^_ .
�: �C > a i
� - LL �
,, d�� . ,�� .���� \,' :
• •�
o u
z z
��
= �
� �w
I x i ,,.� ,y; o o I o o ¢�
� � � '�'�l, z � s -
� S y I � � I � 3 c��+ W
I w I �
I � �� �o�
I I�ti � oo�
� ;� ��. � �
' � �� j ��
Z � � I z z
�o
= w ��
WUZ �
w p w F w �
U U Z K
Q ¢ W ¢ vl O
Z
? ? J � � � O � y r O
0 Z O Z � K U � � S � U U U
_ O W tN/1 � O f � F W F Q � � w ¢ �._ .�
i 0 � i Q F j y Z 3 O Q ❑ i K 9 m C9
N Vi U Z O K > � F �� ~ -,
2 � W Z O p r O U Z Z U 0 � N N m N ��
� o p � W H a W � O O O � a � -p , m�
C7 C7 U' U' ? U' y � U U � � K � � m m�
1- H 1- F j F d d d N � 7 d � d N
W W W W V~i W h h W > ? Z W U F� � ^ Z
�
Q _.�
U w i°n
N W
U LL
� ? c
Q N �
('J
O
O
2
� U C]
� Z a
L O m
= Q £o
W � �„
Z
V� �' � N - m
N - wa � -a�
d J� Q =-
� _ �> w �r�
Z Y �
O Q lfl i_ z
w -• Z � i 3
� m^ � s u a
� W
Z
�
C��� � u�
y� } = a
� -_
- —m�mm_
�����
,•• ':>;�••. �, �, N
;�::• _ 'fs�; � �
.¢; �z;�. �>�
:y� �vQ�;
., ,oN,
•..,��,.��•''��
N
F
Z
U CJ CJ
Z Z Z
f f
� M �
� � �
O � O ¢
� _ � � Z
N ' N � �
U Z Z r u�
� � m
3 3 3 � �
� N � � _
O � O m �
z �
O � O
� � �
� � �
�7 N
Z Z Z
O � O
m 9I8 ml�
J
a �o
U
N LL Y
U
� ? c
a
¢ o �
¢ �
�
� �
� ����m�
� � �U�o��
3m
°
a� �
Q3
0
�:;
� �
: 1 '�
�
�
��
'`"'�__
�
y r
;'��; �� �
/�� �
* �. �'J!�*t
/� c
0
�
J
..��� �
� �
�
�
�
,
',
,.R �\
}
# +t ��' �"�I.
.h
�4 k_., f�`.
}ry
.`k• `
+ ,� .
�
�
�
r
Q�
�
. .--�
�
�
�
.ry
�
�
. �••I
r�
i�l
��.y
?--I
�
��
�.�I
.�
�
•ny
�
/�� �
T
0
�
�
�
�
�
�
�
�
�
�
�
i-r
�
�I--I
�
�
0
• ry
�
U
�
�
�
a�
�
�
an
.�
w
�
�
..--l�
F�i
�
L�
l�
�
�
�
e�
r�
I�
O^
F�
�
�
�
�
�
r�T �
F'�I
�
. �I
3
a�
�
I
�
F+�I
�
�
�I--I
0
�
. .--i
U
j���
W./
�1
�
W
�
�
a�
�
�
0
�
a