HomeMy WebLinkAbout20091070_Meeting Minutes_20111109� `
BEVERLY EAVESPURDUE
GOVERNOR
Team Members
���,,�.
� �'
� �
���
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Draft Minutes of the Intera�ency Hydraulic Desi�n Review
4B Meeting November 9, 2011
R 2612B
State Pro�ect 34483 1 1
US 421 At SR 3418 (Neelley Rd ) South Of Greensboro
Guilford County
Andrew E Williams
Gary Jordan
Travis Wilson
David Wainwright
Amy Euliss
Chris Milrtscher
Felix Davila
Mark Staley
David Harris
Brenda Moore
Mack Bailey �
Karen Reynolds
Ted Walls
Rachelle L Beauregard
Patty Eason
Participants (See attached list)
Plan Sheet 4 No comments
Plan Sheet 5 No comments
EUGENE A CONTI JR.
SECRETARY
USACE (present)
USFWS (not present)
NCWRC (not present)
NCDWQ (present)
NCDWQ (not present)
EPA (not present)
FHWA (present)
Roadside Environmental Unit (present)
Roadside Environmental Umt (not present)
Roadway Design Unit (present)
Structures (present)
PDEA (present)
PDEA (not present)
NES (present)
Division 7 (not present)
Plan Sheet 6 DWQ stated depending on how much wetlands remains in Loop D that it could
be a total take USACE stated that the ratio of mrtigation for Loop D is 2 1 but mrtigahon ratio
could be reduced to 1 1 USACE stated that wetlands remnants in loops still function to some
extent but not as well as before DWQ requested quantities for wetlands impacted
MAILING ADDRESS
NC DEPARTMENT OF TRANSPORTATION
HYDRAULICS UNIT
'I SJO MAIL SERVICE CENTER
RALEIGH NC 27699 1590
TELEPHONE 919 707 6700
FAX 919 250 4108
WEBSITE WWW DOH DOT STATE NC US
LOCATION
CENTURY CENTER COMPLEX
BUILDING B
1020 BIRCH RIDGE DRIVE
RALEIGH NC
R 2612B 4B Meetmg
November 9 2011
Page 2 of 4
USACE asked whether 4 1 fill slopes on Loop D could be steepened to 2 1 Roadway requires
4 1 fill slopes for vehicular safety (vehicle can recover) PDEA asked about 2 1 side slopes with
guard rail but Roadway said 2 1 fill slopes with guard rail is not an option
Hydraulics Unit asked whether equalizer pipes would be warranted in Loop D but no request
was made NES stated that stream 9 will still feed the wetland in Loop D
Hydraulics Unit presented Culvert Survey Reports for the box culverts that will be in Quadrant
D Preliminary design for each is a single barrel buried 1 at approximately the same slope as
existing stream
Fill slopes were noted as being 3 1 and 4 1 on Loop A USACE requested the quantity of
wetlands being filled DWQ stated depending on how much wetlands remains m Loop A that rt
could be a total take USACE stated that the ratio of mitigation for Loop A is 2 1 but mrtigation
ratio could be reduced on what remains
Hydraulics Unit noted that the pond in Quadrant A YLPA Station 14+50 Rt will be drained
and will investigate utilizing the area as a potential detention basin
DWQ asked if the cross pipe in Quadrant A YRPA Station 25+58+/ was an equalizer pipe
Hydraulics Unit replied that it is not an equalizer pipe but a cross pipe to continue drainage from
the —Y line
Rip Rap Toe Protection is required through the wetlands at approximately —Y Station 34+00 Rt
and also approximately —Y Station 43+00 Rt
DWQ asked about pipe size for the cross pipe at —Y Station 34+�6+/ The cross pipe has not
been sized at this time but is expected to be less than 72
Rip Rap Toe Protection is required through the wetlands at approximately —L Station 65+20 Rt
and also approximately —L Station 66+40 Rt Hydraulics Umt asked whether this would result
in a total take at the wetland stations mentioned
There will be wetland impacts at —L Station 70+00+/ Rt with the extension of the 24 ' pipe
There was some discussion to reduce mitigation on stream 2E L1 Station 77+20+/ Rt from
2 1 to 1 1 due to the concrete ditch DWQ said that mitigation for this srte should have already
taken place (when onginally built) There will be some impacts to stream 2E L Station 78+20
+/ Rt at the outlet of the existmg cross pipe resulting from a degraded outlet channel
Plan Sheet 7 No comments
R 2612B 4B Meet�ng
November 9 2011
Page 3 of 4
Plan Sheet 8 DWQ asked if the stream at —Y1 Station 32+00 Lt and running past End of
Construction —Y1 Station 35+00 Lt is a JS stream NES replied that this is not a JS stream
Hydraulics Umt questioned whether wetlands at approximately —Y Station 31+60 Lt would be a
total take Hydraulics Unit s opinion is that it would not be due to the drainage area still feeding
the wetlands
Plan Sheet 9 No comments
Plan Sheet 10 No comments
Plan Sheet ll Hydraulics Unit noted that the driveway pipe at —Y1 Station 13+50 Lt will be
replaced and will have rip rap at the outlet This will have an impact to the JS stream that begins
at the pipe outlet
Plan Sheets 12 No comments
Note This pro�ect is in the Cape Fear/Jordan Lake Basin and due to the age of the planning
document is grandfathered in as far as buffers
No other comments were provided and the meeting was ad�ourned
ACTION ITEMS '
• USACE would like to review the pro�ect history of alternate selection and associated impacts
Roadway and NES will provide the requested documentation
• The latest a 4C meeting can be scheduled is April 2013
11
�
R 2612B 46 Meet�ng
November 9 2011
Page 4 of 4
R 2612B
US 421 AT SR 3418 (NEELEY ROAD}
GUILFORD COUNTY
MERGER PI20CESS 4B MEETING
WEDNESDAY NOVEMBER 9, 2011
S�gn m Sheet
NAME ORGANIZATEON PHONE NUMBER EMAIL ADDRESS
/�Nd,L/ � tl�l�% r.�iS�L� ��% S'�/ S�Lt� «�+drea! e G„ l/•�••�za usuc< r� y
/� � / R �+
�/lt �%�?! r c/,�'( F 1 y ��C�C.Jfi �/ l� � i�`f0� �,� �n � L-r'i'c� n �
h, �� a �- ��� 07- 0�8' re n a td �GV��ioJ o�
�° t" � �t - G � i 2 � Gr:�{-
�
r �✓ k �pa7'- NL-=S ��7��►33 e!lJSKC� d� �
a S' /I/cpa -� ?33 ��2� 9'�/ r�d , v
1� 1� Qc� '� c'+,C � "`,�G(� l—S't t,. i ark ._ t� `Sz 7G ��f�kfa 2 rti�.:. l&. i�.�J ^��.� a o�
� J�4 r�%�/�/'9 ��d �l.` / �C� / n /� h � sl�l i.� � F✓ ��� ,%^! l
I `� f
Ccf�i�Q �5� 1�E�.�i " "Fr�'r(n F%✓'1 i�ai "�,iJi ��f.�1r REt�-�` c�y�
�� � � "�l r.r+ !� , .�'""i�`" E-Fvt,:�` i'3�'`�7r� tc��? J� �r � �nc ">�-r
..rt> ,• ,f ns s,. � -�Ln ti
�' 1 ` f � ( � � 1
�l?ti/�l� /!./tc✓'�&+.Li �{ t�i'i1�1% [� lyr� t f"t„it/x�/z': � t'�csn� -s-�a!
C t,;-�C�f S ��L�s — DJF�` R! R?07 G( 2-3 � �w or � r�c�do� •- ��!
j"/(i f F/ 1 ��i i�.� � �%r:v �; � t + I t'f � � � !�� l � / � F.� f �r .i � i�U f r` •- ? ✓
.id.+.sl��d a s e 0.r� N�poT �,I� f1eS ?°7`698`a �ha�s e a,+,�n ` ov
! �, 7JC�� i-12� iJ. `1 ?c3�' 3� Z\ � {� Q n du
�"�i �- ,�,��- -��..;�- ��- � i i-7�z� t a.t ��. �� ��
,
D oT— �tG%Ja. 7b7-(� 8S dor
P9,GN�2y�� �2oLf ��.• d l7(/� /VGJ ♦a7 ��p �UV� rdeeui� 4��A vt evf- a�