Loading...
HomeMy WebLinkAbout20081615 Ver 3_Staff Comments_20111215Dennison, Laurie From Steenhuis Joanne Sent Thursday December 15 2011 10 33 AM To Dennison Laurie Sub�ect DWQ # 11 1067 Laurie The pro�ect you put in BIMS as 2011 1067 should be a V3 of 2008 1615 Dennison, Laurie From Steenhuis Joanne Sent Thursday December 15 2011 10 19 AM To Stnckland Bev Cc Dennison Laurie Sub�ect FW Topsail Inlet/ Topsail Beach Nounshment DWQ # 11 1067 Or�ginal Message From T�mpy, Dav�d L SAW [ma�lto David L Timpy@usace army m�l� Sent Thursday, December 15, 2011 9 27 AM To Steenhuis, Joanne, Baker, Jess� E, ron sechlerCa�noaa gov Sub�ect FW Topsail In/et/ Topsa�l Beach Nour�shment FYI The rev�sed proposal (8+2) w�ll be a GP291 and will be sent out after I receive it Da ve - Or�g�nal Message--- - From G�bson, Chr�s �ma�lto clg�bsonCu�gba-mc com,J Sent Thursday, December 15, 2011 8 43 AM To Timpy, Dav�d L SAW, Da�l, Jason Cc smtp Hollerman, Tim Su6ject Topsa�l Inlet/ Topsa�l Beach Nour�shment Gentlemen, G�ven the perm�tt�ng t�mel�nes and work by the regulatory agents necessary to obta�n a perm�t to dredge Topsarl Inlet to 16+2, we recogn�ze that �t w�ll not be possible to dredge th�s season �f we w�sh to dredge deeper than authorized depths The Town has deaded to mod�fy the perm�t request at th�s t�me to l�m�t excavation w�th�n the federal channel to the federally author�zed template of 8+2 as we did last year, util�zmg a non-ocean cert�fied dredge We also will be request�ng perm�ss�on to dredge the shoal which has formed �n the channel at the east end of Topsa�l Creek For work outs�de of Colregs Demarcat�on Lme (approx�mately Sta 10+00 on the perm�t drawmgs), we w�ll contmue w�th pursu�ng the MOA to use the Corps fleet for the 2012 season Revised drawmgs wrll be sent after our surveys of the channels are completed next week Current estimates are that the dredg�ng will mvo/ve approx�mately 150,000 cy We bel�eve this will expedite both the state and federal processes and have the best outcome for the future of Topsa�l In1et and the Topsa�l Beach The Town �ntends to cont�nue pursuing a perm�t to dredge to 16+2 as part of the 30 year plan, but real�ze that proper review requ�res more time rhan �s currently pract�cal If we want to protect port�ons of the beach h�t by Irene and have the �nler open when the 2012 summer season beg�ns, th�s �s our best course of act�on As always, thank you for your hard work and help on this pro�ect Please have a happy and safe Hol�day Season S�ncerely, Chris G�bson, PE Vice Pres�dent Gahagan & Bryant Assoaates of NC 295 A North Green Meadows Drive W�Im�ngton, NC 28405 Office 910-313-3338 Cell 910-279 4777 clg�bsonCc�gba-inc com <mailto clq�bsonCc�gba mc com> � z