Loading...
HomeMy WebLinkAboutNCG020183_Dormant Approval Signed_20212201ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Vulcan Construction Materials, LLC Attn: Tony Johnson 4401 N. Patterson Avenue Winston Salem, NC 27105 NORTH CAROLINA Environmental Quality January 22, 2021 Subject: Exemption from Monitoring During Shut -Down (Site Dormancy) Certificate of Coverage #NCG020183 Vulcan Construction Materials - Yadkin Quarry Yadkin County Dear Mr. Johnson: A Compliance Evaluation Inspection performed at the Yadkin Quarry in Yadkinville, NC on September 29, 2020 by Tim Latham of the Winston-Salem Regional Office verified that no industrial activity was taking place at the time of the inspection. Your recent request to keep the NCG02,0183 permit, but to discontinue stormwater and wastewater monitoring is hereby approved, based on the following conditions: • There shall be no industrial activities taking place, no stockpiles of raw materials (to include chemical additives) stored on the site, or wastewater or stormwater industrial discharges while the permittee is not monitoring. • No wastewater shall be generated, and all wastewater treatment units shall be cleaned, stabilized, and inactivated as to render them harmless to the environment while the site is dormant. • Qualitative and analytical monitoring actions as described'in Part IV, Sections A, B, C, and D do not have to be conducted - as long as the above conditions and all other permit conditions and limitations are met, including: o The annual permit fee must be paid. Failure to pay the annual permit fee will be considered a violation of the subiect nermit o The Stormwater Pollution Prevention Plan (SWPPP) shall be kept updated to reflect the status of the facility. Updates and conditions of the SWPPP of note are: The BMP Summary shall be reviewed and updated annually. Training programs shall be developed and training provided at least once a year for facility personnel with responsibilities for: spill response and cleanup, preventative maintenance activities, and for any of the facility's operations that have the potential to contaminate stormwater runoff. Ew1e, oava�eme� a Emkotmanhl agar_ V North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336.776.9800 ROY COOPER Governor MICHAEL S. REGAN secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality ■ All aspects of the Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include written recertification that the stormwater outfalls have been evaluated for the presence of nonstormwater discharges. (Should nonstormwater discharges be discovered, the permittee shall contact this office as soon as possible but in no case greater than 24 hours or the next business day). ■ Inspections of the facility and all stormwater systems shall occur as part of the Preventative Maintenance and Good Housekeeping Program at a minimum on a semi-annual schedule. • This office must be notified in writing at least 30 days prior to commencing any industrial activity on the site, even if updates or changes are temporary. • A copy of this letter must be maintained with the facility permit and associated plans and records for the life of the permit. Should you have any questions, please contact Levi Hiatt at (336) 776-9658. cc: Winston-Salem Regional Office Files Sincerely, Tamera Eplin,, E Regional En ineer Dr..E riOR raaot.ir w ftWt em of ew"n" ante) *a* North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 336.776.9800