HomeMy WebLinkAboutNCG020183_Dormant Approval Signed_20212201ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
Vulcan Construction Materials, LLC
Attn: Tony Johnson
4401 N. Patterson Avenue
Winston Salem, NC 27105
NORTH CAROLINA
Environmental Quality
January 22, 2021
Subject: Exemption from Monitoring During Shut -Down (Site Dormancy)
Certificate of Coverage #NCG020183
Vulcan Construction Materials - Yadkin Quarry
Yadkin County
Dear Mr. Johnson:
A Compliance Evaluation Inspection performed at the Yadkin Quarry in Yadkinville, NC on
September 29, 2020 by Tim Latham of the Winston-Salem Regional Office verified that no
industrial activity was taking place at the time of the inspection. Your recent request to keep
the NCG02,0183 permit, but to discontinue stormwater and wastewater monitoring is hereby
approved, based on the following conditions:
• There shall be no industrial activities taking place, no stockpiles of raw materials
(to include chemical additives) stored on the site, or wastewater or stormwater
industrial discharges while the permittee is not monitoring.
• No wastewater shall be generated, and all wastewater treatment units shall be
cleaned, stabilized, and inactivated as to render them harmless to the
environment while the site is dormant.
• Qualitative and analytical monitoring actions as described'in Part IV, Sections A,
B, C, and D do not have to be conducted - as long as the above conditions and all
other permit conditions and limitations are met, including:
o The annual permit fee must be paid. Failure to pay the annual permit
fee will be considered a violation of the subiect nermit
o The Stormwater Pollution Prevention Plan (SWPPP) shall be kept
updated to reflect the status of the facility. Updates and conditions of
the SWPPP of note are:
The BMP Summary shall be reviewed and updated annually.
Training programs shall be developed and training provided at
least once a year for facility personnel with responsibilities for:
spill response and cleanup, preventative maintenance activities,
and for any of the facility's operations that have the potential to
contaminate stormwater runoff.
Ew1e,
oava�eme� a Emkotmanhl agar_ V
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105
336.776.9800
ROY COOPER
Governor
MICHAEL S. REGAN
secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
■ All aspects of the Stormwater Pollution Prevention Plan shall be
reviewed and updated on an annual basis. The annual update
shall include an updated list of significant spills or leaks of
pollutants for the previous three years, or the notation that no
spills have occurred. The annual update shall include written
recertification that the stormwater outfalls have been evaluated
for the presence of nonstormwater discharges. (Should
nonstormwater discharges be discovered, the permittee shall
contact this office as soon as possible but in no case greater than
24 hours or the next business day).
■ Inspections of the facility and all stormwater systems shall
occur as part of the Preventative Maintenance and Good
Housekeeping Program at a minimum on a semi-annual
schedule.
• This office must be notified in writing at least 30 days prior to commencing any
industrial activity on the site, even if updates or changes are temporary.
• A copy of this letter must be maintained with the facility permit and associated
plans and records for the life of the permit.
Should you have any questions, please contact Levi Hiatt at (336) 776-9658.
cc: Winston-Salem Regional Office Files
Sincerely,
Tamera Eplin,, E
Regional En ineer
Dr..E
riOR raaot.ir w
ftWt em of ew"n" ante) *a*
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105
336.776.9800