Loading...
HomeMy WebLinkAbout20081615 Ver 3_More Info Received_20111215Strickland, Bev From: Steenhuis, Joanne Sent: Thursday, December 15, 2011 10:19 AM To: Strickland, Bev Cc: Dennison, Laurie Subject: FW: Topsail Inlet/ Topsail Beach Nourishment DWQ # 11 1067 -----Original Message----- From: Timp��, Da�id L SAW fmailto:Daiid.L.Tim����ci��,usace.armv.mill Sent: Thursda��, December 15, 2011 9:27 AM To: Steenhuis, Joanne; Balcer, Jessi E; ron.sechler��i��,noaa.go� Subject: FW: Topsail Inlet/ Topsail Beach Nourishment FYI. The re� ised proposal (8+2) �vill be a GP291 and �vill be sent out after I recei� e it. Da� e -----Original Message----- From: Gibson, Chris �mailto:clQibsom�i:aba-inc.coml Sent: Thursda��, December 15, 2011 8:43 AM To: Timp��, Da� id L SAW; Dail, Jason Cc: smtp-Hollerman, Tim Subject: Topsail Inlet/ Topsail Beach Nourishment Gentlemen, Gi� en the permitting timelines and �vorlc b�� the regulaton� agents necessan� to obtain a permit to dredge Topsail Inlet to 16+2, �ve recognize that it �vill not be possible to dredge this season if �ve �vish to dredge deeper than authorized depths. The To�vn has decided to modifi� the permit request at this time to limit eica� ation �vithin the federal channel to the federall�� authorized template of 8+2 as �ve did last ��ear, utilizing a non-ocean certified dredge. We also �vill be requesting permission to dredge the shoal �vhich has formed in the channel at the east end of Topsail Creelc. For �vorlc outside of Colregs Demarcation Line (approiimatel�� Sta 10+00 on the permit dra�vings), �ve �vill continue �vith pursuing the MOA to use the Corps fleet for the 2012 season. Re� ised dra�vings �vill be sent after our sur� e��s of the channels are completed neit �veelc. Current estimates are that the dredging �vill in� oh e approiimatel�� 150,000 c��. We belie� e this �vill eipedite both the state and federal processes and ha� e the best outcome for the future of Topsail Inlet and the Topsail Beach. The To�vn intends to continue pursuing a permit to dredge to 16+2 as part of the 30 ��ear plan, but realize that proper re� ie�v requires more time than is currentl�� practicaL If �ve �vant to protect portions of the beach hit b�� Irene and ha� e the inlet open �vhen the 2012 summer season begins, this is our best course of action. As ah� a��s, thanlc ��ou for ��our hard �vorlc and help on this project. Please ha� e a happ�� and safe Holida�� Season. Sincerel� , Chris Gibson, PE Vice Fresident Gahagan & Bn�ant Associates of NC 295-A North Green Meado�vs Dri� e Wilmington, NC 28405 Office 910-313-3338 Cell 910-279-4777 cl�ibson��i;�ba-inc.com <mailto:clQibsoni�i;�ba-inc.com>