Loading...
HomeMy WebLinkAbout20191132 Ver 1_Initial Credit Release SAW-2019-01296_20201216Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Wednesday, December 16, 2020 4:37 PM To: Andrea Eckardt; Shawn Wilkerson Cc: Davis, Erin B; Hamstead, Byron A; Bowers, Todd; Leslie, Andrea J; Wilson, Travis W.; Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV (USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA); Smith, Ronnie D CIV USARMY CESAW (USA) Subject: [External] Wildlands Little Tennessee Umbrella Mitigation Bank Initial Credit Release for the East Buffalo Mitigation Site (SAW-2019-01296) Attachments: SAW-2019-01296_Wildla ndsLittleTen nesseeU M B-EastBuffalo_I nitialCreditRelease.pdf, RE: East Buffalo - Wildlands Little Tennessee - Endowment Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spa m.<mailto:report.spam@nc.gov> Andrea/Jake, Please find attached the Initial Credit Release letters for the Wildlands Little Tennessee Umbrella Mitigation Bank: East Buffalo Mitigation Site (SAW-2019-01296). As requested, 15% credit is being released for approved restoration and enhancement activities, as well as, approximately 89% of credit released for preservation activities that satisfy the initial release requirements pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the Wildlands Little Tennessee Umbrella Mitigation Bank, signed November 4, 2020 and the final site -specific mitigation plan dated October 5, 2020 and the December 16, 2020 email with minor plan revisions (see email attached). In accordance with the plan (as clarified by the attached email revisions), 1,653.3 cold stream mitigation units and 0.26 wetland mitigation units are now available for the East Buffalo Mitigation Site. Feel free to contact me with any questions. This electronic copy is an official Department of the Army Notification. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https:Hurldefense.com/v3/_http://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0_;! !HYmSToo!JtXEAdZ NXzOKT1LwWkmCV_LPoYrSO7W7SUjNmsdlpRyjfY9GbksBh05MPRRxKer-1as$ to complete the survey online. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 December 16, 2020 Regulatory Division Action ID No. SAW-2019-01296 Re: Initial Credit Release associated with the Wildlands Little Tennessee Umbrella Mitigation Bank — East Buffalo Mitigation Site Mr. Shawn Wilkerson Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, North Carolina 28203 Dear Mr. Wilkerson: This correspondence is in response to your November 24, 2020 request for the initial credit release and your December 16, 2020 email with credit clarification and approved plan revisions for the East Buffalo Mitigation Site, part of the Wildlands Little Tennessee Umbrella Mitigation Bank. The 259.84-acre site is located within the Little Tennessee River Basin Hydrologic Unit 06010204, at 1157 East Buffalo Road in Robbinsville, Graham County, North Carolina. The project was approved to generate 4,432 cold stream mitigation units (SMU's) through the restoration, enhancement, and preservation of 13,662 linear feet of stream on East Buffalo Creek and ten unnamed tributaries to East Buffalo Creek. It was also approved to generate 1.75 wetland mitigation units (WMU's) through the re-establishment, rehabilitation and enhancement of 2.46 acres of wetland. The purpose of this letter is to confirm the initial release of credits for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the Wildlands Little Tennessee Umbrella Mitigation Bank, signed November 4, 2020, the site - specific East Buffalo Final Mitigation Plan dated October 5, 2020 and the December 16, 2020 email with approved plan revisions, fifteen percent (15%) of the sites total restoration and enhancement credits, as well as, all but 150 SMU's (approximately 89%) of the sites total preservation credit shall be available for sale immediately upon completion of the following: a. Execution of the MBI by the Sponsor, the Corps, and other agencies eligible for membership in the IRT who chose to execute the agreement. b. Approval of the Final Mitigation Plan. c. The mitigation site must be secured. d. Delivery of the executed financial assurance documents as described in Section 15.0, page 59 and Appendix 8, of the East Buffalo Mitigation Plan dated October 5, 2020. e. Recordation of the Corps -approved site protection mechanism described in Section 8.0 page 43 and Appendix 1 of the East Buffalo Final Mitigation Plan dated October 5, 2020, including a title opinion covering the property. f. Issuance of the 404-permit authorization for site construction. By copy of this correspondence, we confirm that you have satisfied the above requirements for initial release for all parcels within the bank; and 1,653.3 stream mitigation units (SMU's) constituting 15% of the mitigation site's total restoration and enhancement credits, as well as, approximately 89% of the bank site's stream preservation credits (all preservation except for 150 SMU's) are now available for sale. Also, 0.26 WMU's are now available for sale. Thank you for your time and cooperation. If you have any questions, please contact Steve Kichefski at (828) 271-7980 extension 4234. Sincerely, KICHEFSKI.STEVEN.L.1386 Digitally signed by for KICHEFSKI.STEVEN.L.1386908539 908539 Date: 2020.12.1616:19:36-05'00' Scott Jones, Chief Asheville and Charlotte Regulatory Field Offices Electronic Copies Furnished: Erin Davis (NCDWR) Andrea Leslie (NCWRC) Travis Wilson (NCWRC) Byron Hamstead (USFWS) Todd Bowers (USEPA) Renee Gledhill -Earley (NCSHPO) Todd Tugwell (USACE) Kim Browning (USACE) Casey Haywood (USACE) Scott Jones (USACE)