Loading...
HomeMy WebLinkAbout20200035 Ver 1_IRT Comments technical memo_20210107Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, January 7, 2021 4:22 PM To: Munzer, Olivia; kathryn_matthews@fws.gov; Bowers, Todd; Angela Allen; Dow, Jeremiah J; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Haywood, Casey M CIV (USA); Wilson, Travis W.; Jones, Brena K.; Wells, Emily N Cc: Crocker, Lindsay; John Hutton Subject: [External] IRT Comments: Liberty Rock technical memo Attachments: Technical Memo Review -Liberty Rock_SAW-2020-00047.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> All, Please see the attached memo containing IRT comments on the revised technical proposal for the NCDMS Liberty Rock Mitigation Site SAW-2020-00047). You may proceed with developing the draft mitigation plar provided you address IRT concerns. Please reach out with any questions. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) Sent: Wednesday, December 16, 2020 10:24 AM To: Munzer, Olivia <olivia.munzer@ncwildlife.org>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Angela Allen <aaHen @wild landseng.com>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Jones, Brena K. <Brena.Jones@ncwildlife.org>; Wells, Emily N <Emily_Wells@fws.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; John Hutton <jhutton@wildlandseng.com> Subject: RE: Liberty Rock technical memo All, Attached is an updated technical memo for Liberty Rock. Some figures and tables were updated. Please use this for your review and let me know if you need additional review time beyond Dec 30 due to the holidays. Thanks Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers -Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) Sent: Tuesday, December 15, 2020 11:13 AM To: Munzer, Olivia <olivia.munzer@ncwildlife.org>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Angela Allen <aallen@wild landseng.com>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Jones, Brena K. <Brena.Jones@ncwildlife.org>; Wells, Emily N <Emily_Wells@fws.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; John Hutton <jhutton@wildlandseng.com>; Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> Subject: RE: Liberty Rock technical memo Hi all, I know several members of the IRT are in the field this week and may not have time to review the Liberty Rock revised technical approach. I think it's best to stick to the Folly Swamp discussion for Friday since it's a pending bank site, I'd rather not mix a DMS site discussion with one of our project manager's meetings. I think it would be beneficial if everyone could review the Liberty Rock information provided by Angela and provide written comments to me by December 30, 2020. That way it goes through the 15-day review period. I'll forward all comments received in a memo to Wildlands so they have a path to move forward. Please indicate whether you are comfortable with the revised approach. Given the holidays, please let me know if you need additional review time. Thanks, and I hope everyone is well, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers -Original Message ----- From: Munzer, Olivia <olivia.munzer@ncwildlife.org> Sent: Tuesday, December 15, 2020 11:01 AM To: kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Angela Allen <aallen@wild landseng.com>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Jones, Brena K. <Brena.Jones@ncwildlife.org>; Wells, Emily N <Emily_Wells@fws.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; John Hutton <jhutton@wildlandseng.com> Subject: [Non-DoD Source] RE: [EXTERNAL] RE: Liberty Rock technical memo I have field surveys planned on Friday morning, but I am available later in the afternoon. Olivia Munzer Western Piedmont Habitat Conservation Coordinator NC Wildlife Resources Commission From: Matthews, Kathryn H <kathryn_matthews@fws.gov> Sent: Tuesday, December 15, 2020 7:42 AM To: Bowers, Todd <bowers.todd@epa.gov>; Angela Allen <aallen@wildlandseng.com>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Jones, Brena K. <Brena.Jones@ncwildlife.org>; Wells, Emily N <Emily_Wells@fws.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; John Hutton <jhutton@wildlandseng.com> Subject: Re: [EXTERNAL] RE: Liberty Rock technical memo CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> That works for me. Please note that our Office Phone System is currently not working. Email is the best way to reach me. Thanks, Kathy Matthews Fish and Wildlife Biologist U.S. Fish and Wildlife Service 551-F Pylon Drive Raleigh, NC 27606 919-856-4520, x. 27 3 From: Bowers, Todd <bowers.todd@epa.gov <mailto:bowers.todd@epa.gov> > Sent: Monday, December 14, 2020 3:48 PM To: Angela Allen <aallen@wildlandseng.com<mailto:aallen@wildlandseng.com> >; Matthews, Kathryn H <kathryn_matthews@fws.gov <maiIto: kathryn_matthews@fws.gov> >; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil <mailto:Kimberly.D.Browning@usace.army.mil> >; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov <mailto:jeremiah.dow@ncdenr.gov> >; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil <mailto:Todd.J.Tugwell@usace.army.mil> >; Davis, Erin B <erin.davis@ncdenr.gov <mailto:erin.davis@ncdenr.gov> >; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil> >; 'Wilson, Travis W. (travis.wilson@ncwildlife.org <mailto:travis.wilson@ncwildlife.org> )'<travis.wilson@ncwildlife.org <mailto:travis.wilson@ncwildlife.org> >; Munzer, Olivia <olivia.munzer@ncwildlife.org <mailto:olivia.munzer@ncwildlife.org> >; Jones, Brena K. <Brena.Jones@ncwildlife.org <mailto:Brena.Jones@ncwildlife.org> >; Wells, Emily N <emily_wells@fws.gov <mailto:emily_wells@fws.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov <mailto:Lindsay.Crocker@ncdenr.gov> >; John Hutton <jhutton@wildlandseng.com <mailto:jhutton@wildlandseng.com> > Subject: [EXTERNAL] RE: Liberty Rock technical memo This email has been received from outside of DOI - Use caution before clicking on links, opening attachments, or responding. Since we are having a discussion with Wildlands on Friday (9am) for Folly Swamp would it be appropriate to add this site on for additional discussion with the IRT? Just wanted to minimize time before we consider and provide Wildlands with a response. J Todd Allen Bowers US EPA Region 4 Oceans, Wetlands and Streams Protection Branch 61 Forsyth St. SW Atlanta, GA 30303 404.562.9225 Bowers.todd@epa.gov <mailto:Bowers.todd@epa.gov> Note: I am currently teleworking and away from the office. Please contact me via email or at 919.523.2637. From: Angela Allen <aallen@wildlandseng.com<mailto:aallen@wildlandseng.com> > Sent: Monday, December 14, 2020 3:37 PM To: Matthews, Kathryn H <kathryn_matthews@fws.gov <maiIto: kathryn_matthews@fws.gov> >; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil <mailto:Kimberly.D.Browning@usace.army.mil> >; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov <mailto:jeremiah.dow@ncdenr.gov> >; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil <mailto:Todd.J.Tugwell@usace.army.mil> >; Davis, Erin B <erin.davis@ncdenr.gov <mailto:erin.davis@ncdenr.gov> >; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil> >; 'Wilson, Travis W. (travis.wilson@ncwildlife.org <mailto:travis.wilson@ncwildlife.org> )'<travis.wilson@ncwildlife.org <mailto:travis.wilson@ncwildlife.org> >; Munzer, Olivia <olivia.munzer@ncwildlife.org <mailto:olivia.munzer@ncwildlife.org> >; Jones, Brena K. <Brena.Jones@ncwildlife.org <mailto:Brena.Jones@ncwildlife.org> >; Bowers, Todd <bowers.todd@epa.gov <mailto:bowers.todd@epa.gov> >; Wells, Emily N <emily_wells@fws.gov <mailto:emily_wells@fws.gov> > Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov <mailto:Lindsay.Crocker@ncdenr.gov> >; John Hutton <jhutton@wildlandseng.com <mailto:jhutton@wildlandseng.com> > Subject: Liberty Rock technical memo MR Attached is a technical memorandum showing the change in restoration approach for Liberty Rock Mitigation Site based on our virtual meeting and subsequent design site visits. Please let me know If you have any further questions for us and if we are approved to move forward with this approach. Thank you, Angela Angela Allen, PE I Water Resources Engineer 0:919.851.9986 x106 M: 703-655-6110 Wildlands Engineering, Inc. <Blockedhttps://urldefense.com/v3/_https:/gcc02.safelinks.protection.outlook.com/?url=http*3A*2F*2Fww w.wildlandseng.com*2F&data=04*7C01*7Ckathryn_matthews*40fws.gov*7C333d3cb2c926446046ef08d8a0 71b9b3*7C0693b5ba4b184d7b9341f32f400a5494*7C0*7C0*7C637435757597225558*7CUnknown*7CTWFp bGZsb3d8eyJWljoiMC4wLjAwMDAiLCJQljoiV2luMzliLCJBTil6lklhaWwiLCJXVC16Mn0*3D*7C1000&sdata=XYQh ewD42sVnit71Wx*2BVyGxHXbSblHkauf*2BoVLGYapc*3D&reserved=0_;JSUIJSUIJSUIJSUIJSUIJSUIJQ!!HYmST oo!OzQ8nK1-mrgQ7FT8yoCPo6BQcMjfNFjhTeLVYRUsghowl-vV5Pb62xWmjxFHINyOEO9FmP4$> 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: CESAW-RG/Browning MEMORANDUM FOR RECORD January 5, 2021 SUBJECT: Liberty Rock Mitigation Project - NCIRT Comments during 15-Day Updated Technical Memo Review PURPOSE: The comments listed below were received during 15-day comment period in accordance with Section 332.8(o)(9) of the 2008 Mitigation Rule in response to the NCDMS Technical Proposal Update Review. NCDMS Project Name: Liberty Rock Mitigation Site, Randolph County, NC USACE AID#: SAW-2020-00047 15-Day Comment Deadline: January 4, 2021 USACE Comments, Kim Browning: We agree with the revised proposal. The IRT requests copies of the mussel survey memos each time they are conducted, and will need to be reviewed prior to construction. We also request that we are notified prior to construction so we can schedule an IRT site visit. WRC Comments, Travis Wilson: We have reviewed memo and had some internal discussion and are in agreement with the information outlined. Obviously moving forward there will need to be additional coordination associated with specific issues such as identifying the relocation reaches etc. But we are in agreement with the new approach and it accurately captures our IRT discussions and WRC comments. However what is still unclear is if Wildlands has the necessary mussel survey data to use during design. Wildlands needs a thorough survey of the reach that will be retained in place, plus some minimal additional upstream area in case adjustments are necessary for the tie in point. That survey information is important to identify sensitive areas that are currently providing habitat for mussels populations and can be accounted for during design and construction . We are not sure what level of mussel survey was conducted by their consultant, so it's possible they may have the necessary information we just aren't aware. Once that information is available WRC would like to see the results of the survey. Again, It's not necessary to have survey information for the reach that will be abandoned as those mussels, if present, will be relocated. If you have any additional questions please give me a call. EPA Comments, Todd Bowers: I have reviewed the technical memo concerning enhancement work, mussel habitat protection and the monitoring schedule for the mussels as well as revised credits for the work at Liberty Rock. I will defer to the wildlife agencies to provide critical input as far as the mussels are concerned with this site as it their purview and area of expertise. With that I have no further concerns or comments as it pertains to the Liberty Rock mitigation site technical Memo Option 3 dated 14 December 2020. Wildlands appears to have offered a reasonable and sound approach to providing functional uplift as well as gaining extra credit for wider riparian buffers and monitoring of important mussel species. Thank you for the opportunity to provide feedback on the aforementioned technical memo. DWR Comments, Erin Davis: DWR requests that the IRT get copies of the mussel survey memos (not just WRC), ideally as an appendix to the annual monitoring reports if the timing lines up. USFWS Comments, Kathy Matthews: Emily and are comfortable with the proposal also, as long as the surveys are completed as required, and survey data and reports are shared with the USFWS. If a federally -listed species is documented, we would like to know that ASAP. BROWNING.KIMB Digitally signed by BROWN ING.KIMBERLY.DANIEL ERLY.DANIELLE.1 LE.1527683510 Date: 2021.01.07 16:17:50 527683510-05'00' Kim Browning Mitigation Project Manager Regulatory Division