HomeMy WebLinkAbout20210111 Ver 1_Meeting Request Review_20210119 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20210111 Version* 1
Regional Office* Winston-Salem Regional Office-(336)776-9800
Reviewer List* Dave Wanucha
Pre-Filing Meeting Request submitted 1/19/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Della Moore
Contact Email Address* drmoore2@ncdot.gov
Project Name* E. Steeple Chase Road Bridge Replacement
Project Owner* NCDOT
Project County* Guilford
Owner Address: Street Address
P.O. Box 14996
Address Line 2
City State/Rovince/Region
Greensboro NC
Fbstal/Zip Code Country
27415 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
17BP.7.R.128/B-4956/SF-400025
Do you know the name of the staff member you would like to request a meeting with?
Dave Wanucha
Please give a brief project description below.*
The North Carolina Department of Transportation (NCDOT) has
proposed to replace Guilford County Bridge No. 25 on East Steeple
Chase Road (SR 1105)over Polecat Creek.The existing structure has
undergone numerous repairs and inspections at which the final
recommendation is to replace the structure in its entirety due to critical
scouring.The existing structure consists of a 71'steel deck on I-Beams
with vertical timber abutments.There are two existing spans(1@35'5"
and 1@35'9")with timber caps and piles for interior bents/abutments.The
proposed structure shall consist of a 3-span structure(1@45', 1@50'and
1@45')cored slab with 4'caps.The proposed structure has been
designed to minimize as little environmental impacts to wetlands,surface
waters and existing habitat as possible with 2:1 roadway fill slopes.
Supporting documentation has been attached below.
Please give a couple of dates you are available for a meeting.
1/26/2021
1/28/2021
Please attach the documentation you would like to have the meeting about.
17BP.7.R.128_Guilford Bridge#25 Plans.pdf 1.44MB
Steeplechase Archeological No Survey.pdf 1016.11KB
Steeplechase Archictectural No Survey.pdf 3.59MB
40 0025 2019 SF-400025 POLECAT CREEK
15.12MB
SR 1105 Hydro Dwg.pdf
Vicinity and Location Maps-Guilford Bridge
1.13MB
#25.docx.pdf
pdf only
By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
Submittal Date 1/19/2021
Reviewer Meeting Request Decision
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Has a meeting been scheduled?* C Yes t: No