Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030554_DMR_20200831
Stormwater Discharge Moni for North Carolina Division of Energy, Mineral and Land Resources Date submitted 8/13/2020 CERTIFICATE OF COVERAGE No. NCG03 0 5 5 4 RECEIVED FACILITY NAME Thermcraft INC. COUNTY Forsyth p 17 NZQ PERSON COLLECTING SAMPLES John Widener RSA Labs --' ° ' `'}�`_ FILES LABORATORY Lab Cert. # 34 GWp SECTION Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results L•1 neral Permit No. NCG030000 SAMPLE COLLECTION YEAR 2020 SAMPLE PERI ODE) Jan -June July -Dec or © Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow []Water Supply ❑SA ❑Other P EASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -� nAln rliri-hnrnn thir n r 4W Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, . Inches3.. = Total Suspended Solids PH, W :4 >' Standard units ,E Total Coppe LJ 4 -Total Lead , .yc �ingNcwv: Total Zinc' Non Polar 0&G/ Total Petroleum " Hydrocarbons` Total Toxic - Organics5 Benchmarks _ - 100 mg/L or 50 mg/O 6.0 - 9.0 ' 0.010 mg/L 0,075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400, 01119 01051 01094 00552 78141 1 6/19/20 4/10 7.8 6.94 0.014 <0.005 0.017 <5 2 6/19/20 4/10 <5 6.91 0.009 <0.005 0.024 <5 3 6/19/20 4/10 11.6 6.95 0.011 <0.005 0.023 <5 '. w11L11,Y a011[F 111% 11113LCCIU VI JClfll-d(lilUdl) must begin with the second consecutive benchmark excel Z For sampling periods with no discharge at any single outfall, you must still submit this discharge moni 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites ma ° See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classificatiol 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing opei electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Tot Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the del manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the d tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 dance for the same parameter at the same outfall. oring report with a checkmark here. be eligible for a waiver of the rain gauge requirement. s where the more protective benchmark applies. �dons, manufacture semiconductors, manufacture I Toxic Organics is that definition contained in the EPA �nition as found in 40 CFR 433.11; for semiconductor �finition as found in 40 CFR 469,22; and for cathode ray SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan ay so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the 0Ilowing certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics i stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that th solvent management plan included in the Stormwater Pollution Prevention Plan." John Widener Name (Print name) Safety Manager Titl P 'nt i ture Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, < format. When results are below the applicable limits, they must be reported in the format. "<XX i limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal ermit monitoring requirement for total toxic organics o the stormwater or areas which are exposed to rainfall or facility is implementing the all the provisions of the ljp ear? Dale Non -detect, ND, or other similar non -numerical ' where XX is the numerical value of the detection 3 responses. See General Permit text. new oil per month. n Nn &crhnrno this norinri?2 Outfall No. Date Sample Collected) (mo%dd/yr) 24 hour rainfall amount, Inchess ` t New Motor;Qi1 olt ry Hdr I it Us y au Ic 0 : j .:.'�•.F. <^e.-. N9n, molar di Total �etroleN Hydrocarbons Total Suspended Solids x Benchmarks �;,� ua<� E" n,.� •,.,.,�.�, rn&/L,,, <:�:. `100 mg/L.pr 50.rrig/L4. Parameter Code '46529 -: NCOIL =` ,`00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or rier 3 responses. Permit Date: 11/1/2018-05/31/2021 See General Permit text. SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUI • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO Q REGIONAL OFFICE CONTACT NAME: case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or sup assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of those persons directly responsible for gathering the information, the information submitted is, to the best of my I am aware It there are significant penalties for submitting false information, including the possibility of fines an re of Permit Date: 11/1/2018-05/31/2021 MENTS. SEE PERMIT PART II SECTION B. "ANY ONE OUTFALL? YES ❑ NO Q !rvision in accordance with a system designed to :he person or persons who manage the system, or :nowledge and belief, true, accurate, and complete. i imprisonment for knowing violations." 2z SWU-245, last revised 11/1/2018 Page 3 of 3