HomeMy WebLinkAbout20070763 Ver 1_Application_20070503a.. Ri7j o~
y w~
M.n
.l~~.
STATE OF NORTH CAROLINA
0
~~~
' lq ~~r ,^~.'~'
~Ofi~~ ' ~ ~~ ~~
4'jri'
~y,,(
.v, ~:
DEPARTMENT OF TRANSPORTATION ~~`'''°'
MICHAEL F. EASLEY DMSION OF HIGHWAYS W. LYNDO TIPPETT
GOVERNOR SECRETARY
Apri127, 2007
North Carolina Division of Water Quality
401 Wetlands Certification Unit O ? ®~]
2321 Crabtree Boulevard e
Raleigh, NC 27604-2260
Subject: Secondary Road Improvements to SR 1157 (Fletcher Broome Road), Union
County. WBS Element Number 10.0090084 (DWQ Minor Permit Fee
$200.00).
Dear Sir or Madam:
The North Carolina Department of Transportation (NCDOT) proposes to upgrade SR 1701 (St.
Timothy Road) in Union County from an unpaved roadway to a paved roadway. The total
project length is 1.00 mile.
Transportation and highway laws of North Carolina (G.S. 136-44.6, 136-44.7, 136-44.7A, 136-
44.8 and 136-44.9) require the NCDOT to develop annual work programs for construction and
maintenance of secondary roads. These general statutes specifically set forth requirements for
annual construction and paving of existing unpaved roads. Paving of these roads is performed in
priority order as established by the NCDOT for each unpaved road within a given county. This
number is based on characteristics of each road, including number of homes, schools, churches,
businesses, industries, recreational facilities, traffic counts, presence of school bus routes, and
value as a thoroughfare. Fletcher Broome Road is scheduled for paving in the 2007-2008
Secondary Roads Construction Program.
Protected Species
The subject project has been reviewed for the presence of listed threatened and endangered
species. It has been determined that the construction of this project will have no effect on any
listed plant or animal species.
Impacts to Waters of the United States
This project cannot be completed without impacts to waters of the United States. This project is
located within the Yadkin River Basin (Hydrologic Unit # 03040105) and stream impacts to
Beaverdam Creek will be incurred as a result of this project being constructed.
716 West Main Street, Albemarle, NC 28001 • (704) 982-0101 • Fax (704) 982-3146
AvoidancelMinirnization
The proposed impacts to the jurisdictional areas on this project have been minimized as much as
practical. NCDOT's best management practices for the protection of wetlands and surface waters
will be applied during all phases of project construction in an effort to eliminate any further
impacts.
Summary
The purpose of this letter is to request authorization to construct the proposed project under
Section 404 Nationwide Permit (NWP) 14. Application is also made to the North Carolina
Division of Water Quality (NCDWQ) for Section 401 Water Quality Certificate (WQC) No.
GC3627 that is required for this project.
If you have any questions or need any additional information concerning this project, please fee
free to contact Mr. Larry Thompson, Division Environmental Supervisor, at (704) 982-0101.
Sincerely,'
~,s,~_
Barry S. Moose, P. E.
Division Engineer
BSM/LBT
CC: John Dorney, NCDWQ
Polly Lespinasse, NDWQ
Marella Buncick, USFWS
Marla Chambers, NCWRC
David Crillette, CME
Area Field Operations Unit
File
SR 1157 (Fletcher Broome Road)
Union County
Office Use Only' Form Version March OS
USACE Action ID No. DWQ No.
(If any particular item is not appucanie to uus pro~eci, please en[er ~~v~ r~ppu~avic u, i~,r-~ .~
I. Processing
I . Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
® 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ^
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: ^
II. Applicant Information
Owner/Applicant Information
Name: N C Department of Transportation
Mailing Address: 10~' Highway Division
716 West Main Street
Albemarle N.C. 28001
Telephone Number: (704) 982-0101
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Bam Moose
Company Affiliation: N C Department of Transportation
Mailing Address: l0a' Highway Division
716 West Main Street
Albemarle N.C. 28001
Telephone Number: (70~ 982-0101 Fax Number:~704) 982-3146
E-mail Address: bmoose.~a dot state nc us
Fax Number: (70~ 982-3146
Page 1 of 9
SR 1157 (Fletcher Broome Road)
Union County
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1.Name of project: SR 1157 (Fletcher Broom Road
2.T.I.P. Project Number or State Project Number (NCDOT Only):
3.Property Identification Number (Tax PIN):
4.Location
County: Union Counter Nearest Town: Monroe
Subdivision name (include phase/lot number):
Directions to site (include road numbers/names, landmarks, etc.): From the intersection of
Morrow Ave and Lancaster Ave (HWY 200) in the city of Monroe take Lancaster Ave. (NC
200) south 2 9 miles to SR 1149 ~Doster Road). Turn right onto Doster Road and travel
approx 4 miles to Fletcher Broome Road.
Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 34° 56' 42.18" °N 80° 35' 32.81" °W
S.Property size (acres):
6.Name of nearest receiving body of water: Beaverdam Creek
7.River Basin: Yadkin~Hydrologic Unit 03040105
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/mapsl.)
8.Describe the existing conditions on the site and general land use in the vicinity of the project at
the time of this application: Fletcher Broome is an unpaved secondary road in Union Countv
that has some agricultural uses and is developed with several single family residences.
Page 2 of 4
SR 1157 (Fletcher Broome Road)
Union County
9.Describe the overall project in detail, including the type of equipment to be used: The work
area will be cleared as needed to allow for the installation of appropriate erosion control
measures followed byrading improving roadway drainage building a new gavel base
and paving the roadway There will be~ipe replacements with extensions at Sta. 10+26, Sta.
28+35 and Sta 57+44 The~roposed work will be completed utilizing typical construction
eouipment~ track hoe dump_ truck., motor grader and paving equipment. Erosion and
sediment control devices will be installed accordingly
10. Explain the purpose of the proposed work: The purpose of the proposed work is to improve the
safety and service level of SR 1157 (Fletcher Broome Roadl
I~. Pr°ior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Pravide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.LP. project, along with
construction schedules N/A
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
There are no future permit requests anticipated for this project
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs may be included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
Page 3 of 9
SR 1157 (Fletcher Broome Road)
Union County
1. Provide a written description of the proposed impacts: There will be 56 feet of permanent
impacts associated with this project
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For
dams, separately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
( es/no) Distance to
Nearest
Stream
(linear feet) Area of
Impact
(acres)
Total Wetland Impact (acres)
List the total acreage (estimated) of all existing wetlands on the property: N/A
4. Individually list all intermittent and perennial stream impacts. Be sure to identify
temporary impacts. Stream impacts include, but are not limited to placement of fill or
culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement
walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream
relocation is proposed, plans and profiles showing the linear footprint for both the
original and relocated streams must be included. To calculate acreage, multiply length X
width, then divide by 43,560.
Stream Impact
perennial or Average Impact Area of
Number Stream Name Type of Impact
Intermittent? Stream Width Length Impact
(indicate on ma) Before Im ct (linear feet) (acres)
Replacing existing
10+26
Sta UT to Beaverdam 12" x 36' RCP
"
' Intermittent 2 8' .0004
. Creek x 44
with a 18
RCP
Replacing existing
28+35
Sta UT to Beaverdam 15" x 24' RCP Intermittent 2 26' .0012
. Creek with a
24" x 50' RCP
Replacing existing
57+44
Sta UT to Beaverdam 18" x 22' RCP
"
' perennial 2' 22' .0010
. Creek x 44
with a 30
RCP
Total Stream Impact (by length and acreage) .0026
Page 4 of 9
SR 1157 (Fletcher Broome Road)
Union County
Individually list all open water impacts (including lakes, ponds, estuaries, sounds,
Atlantic Ocean and any other water of the U. S.). Open water impacts include, but are not
limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc
Open Water Impact
Site Number
(indicate on ma) Name of Waterbody
(~ applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres)
N/A
Total Open Water Impact (acres)
6. List the cumulative impact to all Waters of the U. S. resulting from the project:
Stream Im act acres : .0026
Wetland Im act (acres): N/A
Open Water Impact (acres): N/A
Total Im act to Waters of the U. S. (acres) .0026
Total Stream Impact (linear feet): 56
7. Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
Page 5 of 9
SR 1157 (Fletcher Broome Road)
Union County
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. The construction limits for this
proiect have been evaluated and kept to as small of a footprint as practical. The sta~in~ of
construction equipment will not be allowed in or near the jurisdictional areas located on this
proiect Strict enforcement of the sedimentation and erosion control best management practices
for the protection of wetlands and surface waters will be enforced during all phases of proiect
construction.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
htt~ ~ //h2o. enr.state. nc. us!ncwetlandsi strm~i de. htm1.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Any requests received for mitigation will be routed through the NC Ecosystem Enhancement
Program
Page 6 of 9
SR 1157 (Fletcher Broome Road)
Union County
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
Zone* Impact
(s uare feet) Multiplier Required
Miti ation
1 3 (2 for Catawba)
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of chamrel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information
within 15A NCAC 2B .0242 or .0244, or .0260.
XI. St®r~nwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level.
The proiect length is 1 mile The existin~..g~ravel base is 18 feet wide and the t~romosed pavement
width is 20 feet There will be an increase in the impervious area of .24 acres as a result of this
nroiect bei~ constructed
XII. Sewage Dispasal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this an after-the-fact permit application? Yes ^ No
as identified
Page 8 of 9
SR 1157 (Fletcher Broome Road)
Union County
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
htt :/lh2o.enr.state.nc.usincwetlands. If no, please provide a short narrative description:
This project will have no direct affect on development
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. .However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
~ ~ L7 ~7
iT -
Applicant/Agent's Signature /date ~
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 9 of 9
~~R '4q~ ~
g's O~F1j, Y
~Z~~ , ~
.., r?~ ~
}tip .- _., ~
~ v ~
~ ~/
MIL
ST ~ ~ 5~.~
P~j\ O
~ i ~~~r -
pv~e / Q~ ti.._-
o 0 gWOpq
~ °p
\ IF~Uw'C L_.Y2Ef-uQ1Y~ ~ ~ ~~, ~r
R ~. q`SE
~y ~
~ __ ~ ~ ~
~ ~
~T- ~ VQIT
~~ ti~
DR ~ ~ (SR 7162)
~ ~
'"h ~
EM .piJ
c~~~~
i Rp ~~~'
S,qH' ~~
C F
OH
gy /~q
O
n ~~
~
//
~r Mqp
.
~ ^-~\~ ~ /
l~~
~
,
~
o
~'
~
I~ ~ o c°
p //-~~
y
p°~~N ~
~ p~~,e 31i
~;
~HOLLYTRE .,^°~
(SR 7 R = ~~
-~
~
I ~
I;
~
~ ~~
~~ 1 ~"
~ ~ ~ ~~
~
~ . J
~~ ~ ~
' ~ti
~gONf °~ a
r
~~
\~ ~ C e m i
i ;
OAD I°~ oim ~-~ -
8Q
~ u
gG~gqT~N
N
N ~
s E? 5 ~
b~ p r~J
~ ° ~MFA~W~~
~~~ ~
~
i
~N/EDDING7
'~ ~
I
D
° S FORES
~
~'
~
~~ ..
o'
NEP
~~
~ llsryWO
~_
oq 7
~~ l BgUO~S~gP oT
°~%
N _
~ ~~~`
a ~ ~`
g ~ 02~ ~~
o °°
_
9~~ i
~
~ 0N
!
~ (~
~ ~
~~ ~ ~
~
c~ ~ ROAD o°w om S ~ o Fr
m~ ~Pl
FRANV LI
_ ~
PO PO o
~
~s
a Kit m CIS%~ACKSI
a a , I ~', -
`'
75 pi I 8[
N~ STREET
~ I
WINDSON jl m
SBWW' ST I
_ DEER _
~ CRESTHAVE
DR ..
TRACKP F s ~- ~
~ ~ ~'
~ ~
~
~~
r r ~~~
~°o
~
/
~
~ 5~
HpVJ
~ /
~
~
/ ~
~
<~~ ~ ~
~~~~' E
a~ PJ
~
°o
~~ ~°Q
~ ~ ~
-
~° r \ ~ ~3~51 ~
~5P ~
~ ~
~;
~ o~~ ~~~
~~ S~~
i
- i~~
I
~
~ P P
$ ~ `~-'-r~
~
\ ~ ~
J South Piedmont ~~ Ep ~P
~
Union Co
e~%s
~
j ~,~
s \
'~ ~-~
~~
Comm Coll
~_, Union Col
/ Cam us
p ~
~ ~ Career
~/
~~ Ctr m,, a ~~
m Fyq~
°
s
~
I
'
,~\__
~ ~ `
9i
ZO~N ~ WAY
o~
~ HA T ~ ~OP~~ °9oCpEEK ~
~ 9 ,f~C ,F
N~
~~~~3151 ~ ~ ~y
S~ OPO
c GR~ PDND s o° $l 3~ T Q y 99 x
0 0 5'
m ~ ry `ma`r ~ S mT ~ l.~~n~'12 nC ~
~~a
o ~ ~ .
.c \\\,
V
~ \
y Cem,, ~,~
y r
75 BECKY ~ o ~y
m ~~ o' o amc
\U/
iI y -
y~ Tf ¢ ~ G~~ ~! ~o°
~0° m GATf ~ pyv
i
0
,9
v
o
z
~
i°s
w
m I
~ ~
I
H
~/\/
CHUR /
CH ~ ^-~}.
AMP 90
CT Q °
k. J
~
P
~ -
~
FO HILLS
C~1 0
-~
-
I
~~cy,
~~
~
,r~
~~ ~~oP~N' ~~
~
~~. I
~ (SR 1158) ~ RD --
/I
~G~ KNQ~IBPSE~p AR~
1 A
S
~
~
~ RUC~~~
oy 3
4 ~_
\ _ ~ I' s s
~
~ ~ I ~3
9D / rn r v~'~
~
-1_
\ _ ~ 1~~F
\P I
~,O ~ V ~
~
-- ~`~
o
/S \
'
~ IT
z
~
m
i E9/~ D
N ~ F
~
9
9 ~
~ 'fi~y WAVER sl?~ WD Dl a~
~ 7„
° °J.,, ~ BARNLEV
~
~~-
\
Z
1 /
~ R
~ i Calvary
~~~~1 `t B a pt 'S- J
~
°~>„ ~
~
~
,~ ~// ~
~ ~ ~1 ~~~
~~~~ ~
I
I
~ ~ Mou t
1J~ "y Uni d M 1
el ~
et ~Bei~~~crr'itn '~ ~
' / ,
~ ~
~-\
~ ROAD ~ I
~_
.
~ ~ --
C'
i
~ ~ I
i-
~
/~~ ~
~
~
I
~~ae~ I Maunt ~~
Q. Carmel R`
~ Qp~ 9
~
~
,
~
~. _
~~
~ `l
~ ~%'~ ~
~ ~ ~ ~ i
o°"~ 1
~ I ~
--
I
c~°ra ~ ~
~ ~II ~
i ~ 'v c ~~~?ii ~
~
`J
( S~DRr
SR 2r %
7rinth ~
Bapt ~Cem i
~i~ ~
~'
'~
~ {{°
o9r°
~ u
I
°o ~
a ~ ~
z I
200 ~
~ ~
N ~ 4q
~ OAT
~ A
ROAD!~~._
~
S~y POp,O ~l L.~ ~~ ~ ~ an ~il
o
_
(SR 7149) ~~
''~~A~~
~~ ~R IN _ /ISy
BROOK~~t~~gE~ 4/
OQ
~ I I ~'
n zj
~~~ FDLGEP
- ~ - ~ ~ [ L i
.. i I .1 i ~ i ~ s _ _
~ DPo
l~ ~ ~~ oo,~ ~ I P
,i o
/~ _ Ob 3
- Od. o~ lSR 256)
\~~ v
/ ~~ P~
~c
Qo,q
y~ L~ -- -_. .-_, __-_. - __
___.___
-- ---. ~ . - - - (BS! ~
as z asl _
' NOSOti4H01B
S M
N
_ LL R
2 i
t~ --. _- _. _-_ .. _._. - - -
~ aG~¢ MILL ROAD `$
o
V - _
o PLYLER `SP2~461 °s\~ -
Obpy (9bl2HS)
~,
\ ¢° °c
I ' ___._-__ -___- .-_. _. -__
__
.-.____
-. -.____-. x
- c
-__ .-_. -. _. N ---.- p
---. _-_.._-__.._--- U
-. _..-- -..-.-_-- - 7 -
-.. N '_ .-.-._
c>'JI
Q ~
j ~~
~V
P
'~ ~OOAV
~y
~~`[2
~ ~SbMHp1H -- POPO g~Nb`YW
~ GN - --"' -- -- - ----- -- - -
O. FLT PEE ES -- ----.. _.--- _... M,cM
-_-_
OPOOM~ ---GP~~~o?-- a31Sbply~ - - -- - ------ - ~ 15P2.
O
y N
C
7 e~ o
`~ - - --
z _
z __ -_.. -.--.___.__- -- ____-._ ._~______ - -
`c -___-___..__. __- --._ ___--. _.. ._.___-.__._ _.
~~ - - --
°on __.._ - _. ~ s
°. °m spy `°i M
~ N ~~__
W Z ~A
u~
6 V
RO ~ _ __ __ ____. ___-____.
HINSON
___
____.~ _ __~ -_--._.. -_-.._ N - _
_.. ___.._._ _.__._.. 4y o. H~C10 ,
'hy,y QPP~oc\P
oy
_ ~i ;/~ OQ
.++ -__-_--__--___-.__c_. i _. __ -___-. -__- __ --_-___ _--_.--____..
e -._
- __- - -
~\ -
O~
y
S ~
III Qo 6~1
s bJ tip
~~
~~bsr ~~ 6o C7
----- ~ -. Q -.
~ ----
----
o - -__ -
-'
E
_._-.
v o pW
p o LL O I ~p O
o _ O NN~
ObOa ~ ~yO so N
~ H3Nk! ono r~, ~
(LOOT tlS) 3 ,UIDOk!
a (LOOIIiS)
o ~ { f~, E.~.>..
M o
+~, E,.~.: 54.4504£ Lm. t ~f°'~: 00.45e4£ ~
(L ~SL9S,4E ~.-;:~:. 4'~' .0£.S5,4E ~ t 1.1000'0£4 £sti deW suio~
~~
Name: MONROE
Date: 4/24/2007
Scale: 1 inch equals 1333 feet
Location: 034° 56' 31.16" N 080° 35' 28.59" W
Caption: SR 1157 (Fletcher Broome Rd.)
Union County
Maptech, Inc.
v ; ~~
""
w _ .
~ ~
"~
s ` l
~
., ~'y,, !.'
.. `-
f`R' g .
1
s
~
~' S, • r'S ~' ?
~ ~ -
,.
~
.~ ...;,ti-.,
;~ ~ N' /..
Fy
~ ~ ;.,,
d
•~~ f
^ i .
M
~ i
.,~ 7+~N~ a ~. t
r ~ ~ `. ~~ > ~ ~yp~~ ~ - r q.Y ~e
9
~` 'T
;~~E
~~ ti , -~
7.
v ~~t- .
"4~ a
+ "-
.~ n
~, p
`~.
r
~d
Y
kF.e. ~..'. ~ ~~
t
.. "A
..~'
~~ H
.. a%
r
~`~ ~ x
., ii °« r
~y~y~x, ~ ,* f;.
.~
w~ ".
~~~
1
I
~~
- ~~ ~~~a m~
~~
~ t ;Q; ABA®o 0 0
a ~ ~ ~'d <ai ~ ~~
Z Q
^F m U
p
O .3 t ~E
k=H
C.~ ~o OFF t t ?
Q ;~ ~w '<m~H~R~Jf~ i
i
" ~
R .r .1 y .w - Y
:x
• 4w
~~
_
... t t ~ 1 1 ~ ~ .r .+I .q :a y
Z cLI- FFF+
mb~iF
FFFCarGsia
ggq
g
•~ ~~~'
~~
~~~~~
~ ~
~ ~J~y
M
"J~ '3~
6~
55
50
[Q®
1~
(r~\)
b
~ O
~ ~
9
Z
x o
A
~~
~ 4
Q
~~
~~
.,
~~ ~ O
'• ~
o ~ w
~ o
W
N
45
40
~s
30
25
0 ®
~ •
oe o» I ~
j ~ f
I I
~
~~
~
~ .~
~
~ ~
~
{g ~
20
-5
0
W
Qart~ISSb' ~~ O.L Ski ~.r.~afnN~
~~
~~ ~~
pp
~x ~e
~~
h
~ p Y S
`~~ ~ QQO~ a P8®O~~
b
~'® ~
~
'3,
? ~ ®
aa
~
~Lpg ~
R 0
O..
A ~
a
ti
N ~ At
~.~® a~
o
p ~ ~
. ~m ~~ e
~~
N
o ~~
' $
~
~ ~~~
s
~~
~a
W
~
W
p
O
O
h
Q ~ o
u
~ ~
~.
~~~~
Q
u u u u u n
~~o~~'
n
b
Q
W
zo
o~
H r"`/"1
U ~
W W
Cn =
U
___1 I-
Q W
U W
H
~ ~
f ~
r--{
(1~
c~-
'--~
.-,
N ~~
N .--,
W
W
O
J C~
(n J z ~
X WJJ
> J
~ Jam=
O
C~
W
f- >-- _
~~
>_
D3
1.1 Z \
LOS
~ >-- .
J W ~
nm~
0
w
T
TQ Q
1
t- O 3
w Z \
w W O ~
F- O >- .
O J W d
Z (.!) OD LCD
W
_1
0
W
U
C~
z
W
W
Q
W
0
U
W
Q
CLl
W
f-
Q
O
W
~-
Q
`. ~
Q
E--
z
w
~
O
f-
Q
w
~
F- z
o
~
~--~
Q
z
w
(__)
Q
W
~
~ ~
O
O
O o
F-
O
~
~
~
J
Q z
Q
~
z ~--
(1~
z
o
v
=
w
u~
W
O z
O
'~
H
ZO ~
w
0
-~
O
~
W O
(...) =
Cn
O ~ O
u6p•dfi1'Fpa-Lgq~ysd~awooaq aayo}aIl L51las"~spco7 j"Iip~uo~un
9060 9004
m
(~
Z
(J7 M
~ ~
O t
U "' ~-
W '~
~ ~
I-, ~
L
m~
nm
v ui
Q' P
u I
w~
ww
J
n• w
w
of
~a
w" ~
J~
W~
!n
d ~
O Z
~.-.
a r-
N
X
w
-~
'l
~~~~~~
oN~NN~
lry1 ~ ~ 1 ~
aQQ~hQ
_M
61111
~~
~ II
11 ~
w
w-1
n. w
d~
li 4
o~
r
>N
w~
J
W~
a~
o~
^- x
w
_b
'v
K~
w
~~
Z
O o.
u6p•naa~-~ycd-fipa-LS[f\ycd~swoo~q .IeyolaiJ
W
~NN
Q ~ ~~
m ~~
O
z ~
~~V JQ
at A
zo ~Y
o ~-
6
~~
i
~$
iY
a~
~'
bb/LI/8
~`
~~
~~
~ /
~Y /
1 /
u
., ~
~:
~'
/ tl
~5
Y
e
-.
.~..
~~
~~~~~~ ~
~~~~h~ /
ln1 ~ ~ ~ ~ /
0, QO..~h a
S/O \
>K \
~9
'v
X ~
w
Z
Q N
~ N
z
Z ZW
W
~ N
J_ X
N
J W
~3
(~
z
t~ ~
~ N
O +
Ch
U ~ ~
W ~
~ ~
~ ~
d
k/
Mq ~ ~ /~
SKI F
~6p•neat-gysd-Fpa-LS[[\ysd~ewooaq ae4~7aI1
cn
~~
~~
~,~
„>
WJ
d W
d~
~a
o~
r
a~
w~
J
W~
•r
~.
O.N.
~X
/I
~~
~I~~
m~
\~I
Ml0
uiui
lOlO
w~
~w
o_ w
w
O~
ya
w~`'
J~
W~
a~
0
~~
ar
w
91l(17.
00+6b -l-
3NIl HO1VW
Rio
ar
zQ
~F
~'
u
~~ y`°'e~ / X°
~O / lJJ N
~ / ? ~ n
/// >
o Oa ~
? ~ / ~ iu
co v~
v~v~ ~ / y J p
/ / c
s~
Z ? ~- w •'
~ ~ ~_/ IJ.1 I\
~ ~o W ,.
/ J
yo J N ti
/j/ ~o ~ :o~~~
.~ . ~ ~ m
/// b \ ~ \ p~;;~~.--F ~ m W
// m \ \ lV^ W m ~ O
\ \ ~ y1sY a eL u vi a
u a 2 w
>- is ~ ~ o 0 0
.~..
as \~ \~ Ue
3~ / ~
J \ ~~~` ~~
/ ~
`~ 0~~~~~
~ ~nuepnu
~ 0.QO~f-aC
i3
gY
a 1
a ~
1 ~
1
~- 7+ 4.
1
/~
\ A
1
1A
1
1
1
1
'1 1 ~ t g+l7
1
1 A
I
1
1
Z
a~
U~
2 -~ ~
~p g~~ ~ 55
1 v~uuuuu
1 YQO~ti~
I
I
I
1
1
I
I f
1
_ _~
'~~
~~ __
:I I ~
I ~~
. I I Y
~ ~ I 1
o~ ~g I I s
s° ~Y ' 1 I ~
o ~
I 1
I I
• I 1
I A
I
. I
•I ~
I
.I
:,
I
1 A
I
.I
•1
i
MATCH LINE
-L- 49+00
bb/Ll/8 u6p•n eai-gysd-fipa-LS11\ysd\ewooaq aayozelJ LSII-~s \spoo~ 7a~P \uo nin\fipa\:p
~c~~o ~ooz-env-oi
~i~
l~ Z
~~
~~~
m ~~
~o ~
66/LI/8
bl
~~~~
~~~~~~
1~a~~~~
Tiiuuyuu
~Q~~ti~
~m +
x
0
a
Z
u
a°
='~^i
c~
N
N7
E
s
,~~
:~
x~
W
Q d
J (/~
~~
~~z
o~
Z ZW
W
~ N
NX
J W
j
~ T
T
u6p•ne•~-pycd-fipa-LS~~~ysd~ewoowq aeyo?al}
9002