Loading...
HomeMy WebLinkAbout20111083 Ver 1_Triage Check List_20111213 (2) Triage Check List Date 12/13/11 Pro�ect Name CSXT Hope Malls Bridge Repairs & Energy Bank Stabilization � � ���� DWQ# 11-1081 � � County Cumberland To Fayetteville Regeonal Office 60-day Processing Time 12/12/2011 — 2/10/2012 From Ian McMillan Telephone (919) 807-6364 ❑ Stormwater has been given to Annette for review ❑ Restoration Pro�ect NOT for mitigation issued by RO (copy to Eric/Tammy for comments) ❑ NON EEP mitigation pro�ect Issued by RO (copy to Eric/Tammy for comments) ❑ EEP full Delivery pro�ect issued by RO (copy to Eric/Tammy for comments) ❑ EEP design Bid Build issued by CO (copy to RO for comments) ❑ This is an IP and will be issued out of the Central Office Com[taetlts As per our discussion regarding revision of the triage and delegation processes, please review the attached file Note that you are the first reviewer so this file will need to be reviewed for admimstrative as well as techmcal details If you elect to place this pro�ect on hold please ask the applicant to provide your requested information to both the Central Office in Raleigh as well as the Asheville Regional Office As we discussed this is an experimental interim procedure as we slowly transrtion to electromc applications Please appnse me of any complications you encounter whether related to workload processmg times, or lack of a second reviewer as the tnage process m Central had previously provided Also if you thmk of ways to improve this process especially so that we can plan for the electromc applications let me know Thanks� ,