Loading...
HomeMy WebLinkAboutNCG030227_DMR_20200710 Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 07/10/2020 CERTIFICATE OF COVERAGE NO. NCGO3 0 2 2 7 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Coming Optical Communications,LLC SAMPLE PERIOD ❑Jan-June ❑July-Dec COUNTY Forsyth RECEIVE orlvjthly' une (month) PERSON COLLECTING SAMPLES HARGING TO CLASS ORW ❑HQW OTrout ❑PNA TestAmerica Laboratories,Inc. 434 JUL 13 2020 ❑Zero-flow ['Water Supply USA LABORATORY Lab Cert.# ❑Other Comments on sample collection or analysis: CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A:Stormwater Benchmarks and Monitoring Results ]No discharge this period?2 Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic Outfall No. Collected' amount, Total Suspended Solids Standard units Total Copper Total Lead Total Zinc Total Petroleum Organics (mo/dd/yr) Inches3 Hydrocarbons Benchmarks - - 100 mg/l or 50 mg/L' 6.0—9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code . - 46529 C0530 00400 01119 01051 01094 00552 78141 'Monthly sampling(instead of semi-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Section B,Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22;and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 1 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES❑NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DMR,including all"No Discharge"reports,within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware at there are significant p nalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." Ya4-- 6 ?- /C) Z Z0 Signature of Permittee Date Permit Date: 11/1/2018-05/31/2021 SWU-245,last revised 11/1/2018 Page 3 of 3