HomeMy WebLinkAbout20140189 Ver 1_Year 5 Monitoring Credit Release_20201218DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
December 18, 2020
Regulatory Division
Action ID No: SAW-2015-00360
Re: Year 5 Monitoring Credit Release associated with Neu -Con Umbrella Mitigation
Bank, Arrington Bridge III Wetland Mitigation Site
Mr. Brad Breslow
Resource Environmental Solutions, LLC
3600 Glenwood Avenue, Suite 100
Raleigh, North Carolina 27612
Dear Mr. Breslow:
This correspondence is in reference to the Neu -Con Umbrella Mitigation Bank,
Arrington Bridge III Wetland Mitigation Site, located in eastern North Carolina. The site is
adjacent to the Neuse River in the Upper Neuse Cataloging Unit (03020201) and located
southeast of the intersection of Arrington Bridge Road and U.S. Highway 117, in
Goldsboro, Wayne County, North Carolina. The purpose of this letter is to confirm the
release of wetland restoration and enhancement credits associated with the Year 5
monitoring activities for this project.
Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Neu -Con Umbrella
Wetland Mitigation and Stream Restoration Bank, approved April 2, 2001 and amended
April 10, 2009 and February 2, 2017; the site -specific Arrington Bridge III Final Mitigation
Plan dated November 30, 2015; the Arrington Bridge III Year 5 Monitoring Report dated
September 2020, 15 percent of the mitigation site's total restoration and enhancement
credits shall be available for sale provided the Year 5 monitoring report demonstrates
interim performance standards are being met.
By copy of this correspondence, we confirm that you have satisfied the above
requirements for the Year 5 monitoring credit release, and 4.88 wetland mitigation units
(WMUs) are now available for sale. To date, 27.64 WMUs (85 percent of the total
restoration and enhancement credits) have been released for sale.
Please be aware that the Long -Term Maintenance and Monitoring Performance Bond
will expire on January 26, 2021. Failure to submit financial assurance prior to the
expiration date may lead to a suspension in credit sales.
Please also note the open water area near VP 10 and VP 11 is not trending towards
the intended success criteria. If at Year 6 this area is not showing signs of improvement,
the IRT will likely withhold those (approximate 0.25) WMUs from the remaining credit
releases. Please also break out high -risk areas in the Year 6 monitoring report.
Thank you for your interest in restoring and protecting waters of the United States. If
you have questions regarding this letter, please contact Samantha Dailey, Raleigh
Regulatory Field Office at Samantha.J.DaileyCcDusace.army. miI or telephone (919) 554-
4884, Extension 22.
Sincerely,
Todd Tugwell
Mitigation Project Manager
Regulatory Division
Electronic Copies Furnished:
NCIRT Distribution List