HomeMy WebLinkAbout20171295 Ver 1_As-Built MY0 Credit Release (SAW-2017-01469)_20201130Strickland, Bev
From:
Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>
Sent:
Monday, November 30, 2020 5:41 PM
To:
Bradley Breslow; Matt Butler
Cc:
Davis, Erin B; Hamstead, Byron A; Bowers, Todd; Munzer, Olivia; Wilson, Travis W.;
Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haywood, Casey M CIV
(USA); Jones, M Scott (Scott) CIV USARMY CESAW (USA)
Subject:
[External] RES Yadkin 01 Umbrella Mitigation Bank As-Built/MYO Credit Release for the
Scout Mitigation Site (SAW-2017-01469)
Attachments:
SAW-2017-01469_RESYadkin01 UMB-Scout_MYO-AsBuiltCred itRelease_30Nov202O.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as
an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Brad/Matt,
Please find attached the As-Built/MYO Credit Release letter for the RES Yadkin 01 Umbrella Mitigation Bank:
Scout Mitigation Site (SAW-2017-01469). As requested, 15% credit is being released for satisfying the second
release requirement (completion of all initial physical and biological improvements) pursuant to the Mitigation
Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank,
signed by USACE on November 25, 2019, and the Scout Final Mitigation Plan, dated August 2019. In
accordance with the plan, 437.7 stream mitigation units (SMU's) are now available for the Scout Mitigation
Site. Feel free to contact me with any questions.
This electronic copy is your official Department of the Army Notification.
Regards,
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 4234
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure
we continue to do so, please complete the Customer Satisfaction Survey located at our website at
https:Hurldefense.com/v3/_http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0_;! !HYmSToo!IkJ07tQ
OdEelehf6Nk4T6AN1nUknh9aZpa5eLzts8Xg75M6Xaal9Rca6eCFFgUYDdvA$ to complete the survey online.
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
151 PATTON AVENUE
ROOM 208
ASHEVILLE, NORTH CAROLINA 28801-5006
November 30, 2020
Regulatory Division
Re: As-Built/MYO Credit Release of the RES Yadkin 01 Umbrella Mitigation Banking
Instrument and Scout Mitigation Site; SAW-2017-01469
Mr. Brad Breslow
Resource Environmental Solutions
3600 Glenwood Avenue, Suite 100
Raleigh, North Carolina 27612
Dear Mr. Breslow:
This correspondence is in reference to the As -Built Baseline Monitoring Report dated
September 2020, submitted in support of your request for the second credit release for the Scout
Mitigation Site. Also please reference the NC Interagency Review Team (NCIRT) virtual as -
built site review held on October 8, 2020. The Scout Mitigation Site is part of the RES Yadkin
01 Umbrella Mitigation Bank, located approximately eight miles west of Clemmons and five
miles northwest of Bermuda Run, in Davie County, North Carolina. The 13.22-acre project
presents stream restoration and enhancement generating 2,918 warm Stream Mitigation Units
(SMU), after non-standard width buffer adjustments, along Hauser Creek and two unnamed
tributaries in the Upper Yadkin Watershed of the Upper Pee Dee River Basin (03040101). The
purpose of this letter is to confirm the second release of credits for this mitigation site.
Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish
the RES Yadkin 01 Umbrella Mitigation Bank, approved December 4, 2019; and the site -specific
Scout Final Mitigation Plan dated August 2019, fifteen percent (15%) of the mitigation site's
total restoration and enhancement credits shall be available for sale immediately upon
completion of all initial physical and biological improvements made pursuant to the Mitigation
Plan, dated August 2019 and approved December 4, 2019.
By copy of this correspondence, we confirm that you have satisfied the above
requirements for the second credit release for all parcels within the bank; and 437.7 SMU's
constituting 15% of the mitigation site's total restoration and enhancement credits are now
available for sale. Including this credit release, 875.4 SMU's have now been released for the
Scout Mitigation Site which totals, 30% of the approved credit, as detailed in the approved final
mitigation plan and As -Built Report.
During the NCIRT virtual site meeting of October 8, 2020, several comments were made
by agency representatives regarding concerns noted with the as -built conditions. These
comments were noted in the October 16, 2020 meeting minutes, distributed by RES via email.
These include:
1. In order to address concerns regarding changes made to the planting plan (including
species planted), RES staff will begin removing all black walnut stems throughout the site,
including within vegetation plots.
2. After comments regarding the location of stream gauges being placed mid -way down
Reach CH3, RES will locate future gauges closer to the top of reaches for future projects.
Thank you for your time and cooperation. If you have any questions, please contact
Steve Kichefski at (828) 271-7980 extension 4234.
Sincerely,
KICHEFSKI.STEVE Digitally signed by
KI CH EFS KI.STEV EN.L.1386908539
for N.L.1386908539 Date: 2020.11.30 17:26:48 -05'00'
Scott Jones, Chief
Asheville and Charlotte Regulatory Field Offices
Electronic Copies Furnished:
Todd Bowers — USEPA
Erin Davis — NCDWR
Byron Hamstead — USFWS
Olivia Munzer — NCWRC
Travis Wilson - NCWRC
Todd Tugwell — USACE
Kim Browning — USACE
Casey Haywood - USACE
Scott Jones - USACE