Loading...
HomeMy WebLinkAbout20201993 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210117Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, January 17, 2021 12:01 AM To: Sullivan, William Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Pelham Solar - 20201993 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Pelham Solar that you submitted on 12/17/2020. The ID number for that project is 20201993, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201993 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 12/17/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: William Sullivan; Kimley-Horn uvilliam.sullivan@kimley-horn.com Pelham Solar Pine Gate EPC, LLC Caswell Street Address 130 Roberts Street Address Line 2 aty Asheville Postal / Zip Code 28801 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below. Pine Gate EPC, LLC is proposing the construction of a Solar Photovoltaic (PV) Generation Facility on approArnately 1,180 acres in Caswell County, NC. The site occupies eight parcels and is located south of Old U.S. HWY 29, between Gwynns Chapel Road and Law Road near the unincorporated community of Pelham. The site is located within the Roanoke River Basin (03010104). The proposed project anticipates two stream crossings resulting from the construction of interior roads. It is assumed that these stream crossings would qualify for authorization under Nationwide Permit #14 for Linear Transportation Projects and the corresponding WQGC 4135. Please give a couple of dates you are available for a meeting. 1 /11 /2021 1 /13/2021 1 /15/2021 Please attach the documentation you would like to have the meeting about. Fig3_Aerial_Pelham Solar.pdf 2.83MB PelhamSolar_PreliminaryLayout_2020.9.8.pdf 2.13MB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 12/17/2020