Loading...
HomeMy WebLinkAbout20201248 Ver 1_Neu-Con SOA - Arrington Bridge III_20210113fires EBX-Neuse I, LLC Stream and Wetland Banks Statement of Availability December 30, 2020 U.S. Army Corps of Engineers Samantha Dailey Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: The Glen/The Meadows at Hollybrook This document confirms that Fred Smith Jr. (Applicant) for the The Glen/The Meadows at Hollybrook (Project) has expressed an interest to utilize 0.58 Riparian Wetland Mitigation Credits from the EBX- Neuse sponsored Neu -Con Wetland & Stream Umbrella Mitigation Bank, specifically wetland credits from the Arrington Bridge III Site, in the Neuse HUC 03020201. As the official Bank Sponsor, EBX- Neuse I, LLC, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 919-209-1075. Best Regards, FTC Caitlan B. Parker Resource Environmental Solutions, LLC 701 E. Bay Street, Suite 306 Charleston, SC 29403