Loading...
HomeMy WebLinkAboutSW6200701_Form (Supp.EZ)_20210119SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name WH Place 2 Project Area (ac) 2.13 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? no COMPLIANCE WITH 02H.1603(4) 7 Width of ve etated setbacks provided feet N/A 8 WIII the vegetated setback remain vegetated? NIA 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF $CMS: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Slonnwaler Wetland 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvesting RWH 18 Green Roof 19 Level S reader -Filler Std LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 SlormFilter 24 Silva Cell 25 Bayfilter 26 Filterm FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: George M. Rose 28 Organization: _ George M. Rose, P.E. 29 Street address: 1206 Longleaf Drive 30 City, State, Zip: _ _ Fayetteville, NC 28305 31 Phone numbers : 910-977-5822 32 Email: grose9295@gmail.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided In the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. CA •0j°°r O,QPo Rq(, 7"? SEAL t 11315 `,.� G1� . `ANC I N ��e' •'��,�,•a °0A0ea°��' � � • ev°�'s��` "area±»needs A /h. Signature of D igne I1z-24- DRAINAGE AREAS 1 Is this a high density project? Yas 2 If so, number of drainage areas/SCMs 1 3 Does this pro ect have low density areas? No 4 If so, number of low tlensit draina a areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION: Entire Site 1 4 Type of SCM Sand Filter 5 Total drainage area (sq ft 92,625 65,556 6 Onsite drainage area (sq ft 92,625 65,556 7 Offsfle drainage area (sq ft 0 0 8. Total BUA In project (sq ft 31912 sf 31912 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 10permitting) New BUA not on subdivided lots (subject to s 31912 sf 31912 sf 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parkin s ft 22364 sf 22364 sf - Sidewalk (sq ft 3215 sf 3215 sf - Roof (sq ft 5860 sf 5860 at - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft) 473 sf 473 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on isubdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft at sf 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 35% 49% 19 Design storm inches 1.0 In 20 Design volume of SCM (cu ft) 4097 cf 21 Calculation method for design volume Simple ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Other BUA is concrete dumpster pad. SAND FILTER 23 Volume that can be retained in the sediment chamber (cubic feet) 2326 cf 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber (fmsl) 167.80 26 Area of the sediment chamber (square feet) 720 sf 27 Physical depth of the sediment chamber (inches) 26 in 28 Ponding depth in the sediment chamber, above any permanent pool (inches) 26 in 291 Elevation of top of weir between chambers (fmsl) 170 Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 5368 cf 31 Bottom of the sand chamber (fmsl) 166.30 32 Area of the sand chamber (square feet) 1063 sf 33 Physical depth of the sand chamber (inches) 24 in 34 Ponding depth in the sand chamber, above the sand surface (inches) 32 in 351 Elevation of the bypass device (fmsl) 170.5 36 Type of bypass device Weir 37 Mechanism for distributing flow over the sand surface Weir 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe (inches) 12 in 40 Will the media be maintained to drain at least two inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe provided at the low point of each underdrain line? Yes 42 1 Will clean -out pipes be capped? Yes ONAL INFORMATION Please use this space to provide any additional information about the sand filter(s): Sand Filter 1 10:55 AM 1/19/2021