Loading...
HomeMy WebLinkAbout250042_Other_20200824FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Tract # Field Size (wetted acres) = (A) Owners Address Owner's Phone # Crop Type 183 I Field # 1.97 1 M & S Nursery 320 Avery Dr Dover, NC 28526 252-670-5952 Irrigation Operator Irrigation Operator's Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) _ (B) SG Facility Number 25 142 Matthew Davenport 2858 Wyse Fork Rd Dover, NC 28526 252-670-5952 100 10 11 Lagoon ID (1) Date (mm/ddlyr) tZ) l3) h/ w/ wi i' i ,-/ Irrigation ,-• Waste Analysis PAN* (lb/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance" (lb/acre) (B) - (10) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 B= 100 2 10/02/19 9:00 AM 12:00 PM 180 10 13.2 23,760 12,061 0.69 8.32 91.68 PC 1 11/04/19 10:00 AM 1:30 PM 210 10 13.2 27,720 14,071 0.76 10.69 80.98 pc 1 02/05/20 2:00 PM 5:30 PM 210 10 13.2 27,720 14,071 1.87 26.31 54.67 C 1 2/7/2020 10:30 12:30 120 10 13.2 15,840 8,041 1.87 15.04 39.64 pc 1 2/18/2020 10:00 13:00 180 10 13.2 23,760 12,061 1.87 22.55 17.08 pc 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 0 0.00 17.08 00 0 .. 0 n' 'MC T..1..1 [MU 0.00 R9 02 17.08 Crop Cycle Totals Operator's Name Number Operator Signature FORM IRR-2 Lagoon Liquid Irrigation Fields Record One Form for Each Field per Crop Cycle Tract # Field Size (wetted acres) = (A) Owners Address Owners Phone # Crop Type 183 1.45 Field # 1 7 M & S Nursery 320 Avery Dr Dover, NC 28526 252-670-5952 Irrigation Operator Irrigation Operators Address Operator's Phone # From Waste Utilization Plan Recommended PAN Loading (lb/acre) = (B) SG (8) Facility Number 251 142 Matthew Davenport 2858 Wyse Fork Rd Dover, NC 28526 252-670-5952 100 11 Lagoon ID (1) Date (mm/dd/yr) (2) (3) (4)h) tv) i,i Irrigation -• Waste Analysis PAN- (Ib/1000 gal) PAN Applied (lb/acre) (8) x (9) Nitrogen Balance" (lb/acre) (B) - (10) Weather Code Inspections (Initials) Start Time End Time Total Minutes (3) - (2) # of Sprinklers Operating Flow Rate (gal/min) Total Volume (gallons) (6) x (5) x (4) Volume per Acre (gal/acre) (7) / (A) 1000 B= 100 1 10/9/2019 18:00 21:00 180 7 14.2 17,892 12,339 0.76 9.38 90.62 pc 2 12/28/2019 13:00 16:00 180 7 14.2 17,892 12,339 2.27 28.01 62.61 pc 2 2/5/2020 13:30 16:00 150 7 14.2 14,910 10,283 2.27 23.34 39.27 cl 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 0.00 39.27 00 0 0 ♦ T.-A-A DAM 0.00 All 71 39.27 Operators Name rop Cycle Totals 50,694 34, Number Operator Signature