Sub�ect Maintenance repair activity at a failed hydraulic pipe system and rip rap bed and
bank stabilization along Wade Avenue (west of Wade Avenue and I 440
interchange) in Wake County TIP No RSP 1 WBS Element No 42188
The NCDOT submitted a permrt application for maintenance repair activity at a failed hydraulic
pipe system along Wade Avenue on August 10 2009 (TIP No R 4436) The NCDENR DWQ
issued a 401 Water Quality Certification and Neuse Buffer Authorization for these impacts on
August 14 2009 (DWQ Pro�ect No 20090876) However the pro�ect has never been
constructed due to funding constraints The site continues to erode and remains very unstable
The Department now has determined to proceed with construction of this previously described
work (and additional work) at this time (now known as TIP No RSP-1)
The impacts previously permitted for the failed hydraulic pipe system (now listed as Site 1) have
changed due to a revised design and additional stream degradation The Department now
proposes to conduct additional streambank stabilization activities downstream of this failure in
an area now listed as Srte 2
A recent evaluation of this area and the ad�acent hydraulic system has identified failures at the
outlet of an existmg box culvert The Department proposes to stabilize the streambanks and
streambed at the outlet of a box culvert These impacts are noted as Site 3
Specific Construction Activity
Site 1 2 An 18 incr �oncr:�e pipe was installed under Wade Avenue and a 36 inch concrete ptpe
mstalled parallel to u�� along the fill slope of Wade Avenue in 1969 Some type of significant
failure has occurred at this site since the installation Many pipe segments have become detached
from the hydraulic system and the stream has now undercut approximately 20 feet below
ad�acent natural ground The NCDOT proposes to replace this failed hydraulic system and
stabilize the stream The repairs include installation of a stormwater dry detention basin riser
pipe structures and rip rap in the flow line and streambed
Division F�ve—2612 North Dul.e Street Durham North Carolma 27704
Telephone 919 220 4600 F1� 919 �60 3371
L 2
Site 3 The tail end of concrete rip rap lined flumes are failing along the streambank at the outlet
i ' of an existing box culvert at the toe of fill slope along Wade Avenue The Department proposes
� to remove the damaged concrete flumes and replace wrth iip rap lined drtches Addrtionally a
rip rap lmed plunge pool will be installed in the footprint of a large blow hole at the outlet of the
culvert
Impacts to Waters of the Un�ted States
The repairs at Sites 1 2 will result in impacts to an unnamed tributary to House Creek and the
repairs at Srte 3 will result in impacts to House Creek Information concernmg these impacts is
presented m Permrt Drawing Sheets 1 5 and on Page 5 of the attached pre construction
notification (PCN)
Impacts to Riparian Buffer
Construction at Site 1 2 and Site 3 involve streams that are sub�ect to the Neuse River Buffer
Rules Information concernmg these impacts is presented in Permit Drawing Sheets 6 9 and on
Page 7 of the attached PCN
Summary
Application is hereby made for a modification to the exishng NCDENR DWQ Section 401
Water Qualrty Certification (WQC) 3687 and Neuse River Buffer Authorization The NCDOT
proposes to use Department of the Army Section 404 Nationwide Permrt (NWP) 3 and 13
however this permrt does not require submittal of a PCN to the USACE An automated payment
procedure has been implemented between the NCDOT and NCDENR DWQ This procedure will
enable the Division to apply for the 401 WQC without submitting a check for this permit
application This procedure will provide payment to the NCDWQ by chargmg the permrt
application fee directly to the appropriate NCDOT WBS Element No 42188 A pre construction
notification and permit drawings are attached with this request If you have any questions or
need additional mformation please contact Mr Chris Murray at (919) 220-4633
Sincerely
G� �-�-�-���
J W Bowman P E
Division Engineer
c Division 5 file NCDOT
Brian Lipscomb NCDOT
ti ti
�
J i" \ { '^—' / .� \ 1 / ( f 1 4J / �
/� \- \ C� \ 4 ��' -^ti '� //
,,� �' Y � ,}F--=��,�- �z�, �\`� 4 �� " f � ) �)�4�l �;� � a�� ,,�� , � .�,��, �
!V �=� ,� � \ ��.� � � 1 ��--�� --'o � /%-- ."lY, � -� l � � �
�.�� � r�]�� �\ � � '�,�~.���/�11 1�,/ i 1 ��t'✓�- �%��.�,J ��tiT1� � �; ` i ��.`�
J�'*'-�.�. L� J` � rj/�r"'�4 J I /(�� � �/<71 lr/ � ��/l�r��//'� i r- e ��"�r /,� � i«-- f t V
�""�s_ � ��' �1/1� � �r �/. � � \1�f �s�� � / /_"_."'•--✓ / �"%'` ��^�'J /'�+
���+���--�� �F l �.( � ��� �� � � � 1�-'r G, �"S �ir�.,._--.� ,��� � �� .�'=���r� � a� ��
4 t � � ��� v �-r- � 1 r� � �---„ `�-_-
f�, � f-- � �� . ..� r �'
i �1 ��` ' \ ` ( ��� ' �i.,7 \ �� � j i � � ��� % .( -�'`. � `---' � ! '
� � � � �� ���� �Ce �
t � �.,
�� � ' 1 r'� -�- �►���' � � � � , �. � �� ��� �� ,
_j 1�� � � �����/�f'4\j� �V��� �/ /II��// �p 8U ���R `+ „� � ,��f � `�.1
-..7� w � �j t !?"�� �1 , f��-- % (� I\-�-' .. `�"")�`�7 � ��\ !1 � � jY-'
` �'C '\� � �, �//�` {� �`J\*.�\�� ������ ' ' � �` � Ri '� i l C� �^, �l� � �� "J �`�
� �`.� �' -� �y,� �
��� ����� ��. � /%�L/,,%��`--r } � - ���l i i���x'�� � d� l� � � µ � � .�
�` � \�� /i � \��i � � \\ �� �� � �' 5
1� � �� � � %/I� `C-`���.\,��• 1 � '�.��,) ��� ��.�� r\\� �, i � s��
�.� �� � \ � ��� � � � lS � � � � �� � � sr
�- � � L�\ �.`M�f�� ` ,�) ����e"��� 4�6 �� �'�,.�'1 � ����r � �( � t..� � � w
-,/ W�'i{+�� � "7 �--� ��`) 1C 5��`�����,� �'�'�U �- � � 1 � � t
�� ��I� � �� r' r ���`� -- �� � x � �-�.,.,,` � �`'�.)
� �,���/�\.� �-�.=..� . � / `�� ._=---'��� , �\ � ��-�� � �
,` ��� i � � � �5 �1 �� �/� r-- �,� � ^, r'y �J"` y �i�
t I�\` , j � f-- �,� a f � � r �� ' �," x
�
� �, `� "`\1� �i+�� �'�.. '' R��'���t4 � �' �� �� 1 �'� � � � i t..,�" o �G� �,�
� �
� .�� �f y
f'�/3 � � i�v�. S��}�� °7 f I �,�' 1 � i� �=-�'�} � � � � � � r �
Eb t % � � � �qt�Unlr ti� � ` � � ' .``��� ``b I,�J�(/t� �i�� ��� ({� ` � � � � l
�� � � o f � } i � � � .� ,�I (I f 1� z � � ' ' t �. �
— _ ". � i � �1 � _ ` , ._. � r r
/ %_-, �t OI rv ; �, 1\�t,�� r ,�� 3.=r.--L k y "S-....� RA y� � �. .�, o0
�
� � � erh � � o � �� f r � �'�° -'',/i � ~til ��� �� �I( � � 4 �.` ;'�,'� �
^� �1 ��4�� i �O ��Z� � � �i L- '`�r�'.�/ ��� • �i:.� �"I\� , � �SZ�i'� f �se sf. ��--��� �
� j �� / � t�,44 �� ��.7�� ��� � 0��� / �f � �\�1 � �f�� �� � � 3
� j
r'%fi� ' r/i�� c7 ����� . �( � '�.`'"°�� '' � � I��fa i � �l � E. �� � 1 'r
'�' �/ i t '` , + �� ,; � . � �-r�/,�����-�N - � j�✓ /� ! , � � ,�f�' �` � o �J �
/ "-/� ' � %/i 't� \1 � ' �`�^zi,\ o\oi �ri L/ G-- y� � 1 �C � �/� ` > > J```..�1�T �-�^�4f .t
/`\�� ` ��� J`/� �4�f.G�-- " � �� _ _i�� � � J ,�._, � ,� x ��� -
�\�-��,,�� ) i� f( � �ro . Site 3 i�r � / �1� .,��,��� a�., � �
�`"-'�-,-��_..� =V..,.,�- `� �s\ ��� f"` ;( -- i' ����f=�.r r �!^ t �f� 4 ���� � �y`" �-'/- `� � x-�.
/ � �
_'"� ..,�'"'-v' __<� \ ��\��-� � a � �� i t_`_� t .�-3. � �J � � � � �� `� �. �'� � 5
_���,.�(/`,��� ��5�� S ���� / kr � � )�~~-� /%� l� � �� I �..._ ..,.t C.� �(
� l � � i �jl� � ---� t tl � �� � l' �- �� s j � �
�.u���,�i;� �- - � � -��� ��� � f�-��� ,[�` � ��__�._ r � { �
`S � �--�-� --�(-1 �-�, ,� �...�- � i r�` � ' � � «�����.�� ,�� �'` i
�-,. � q\ _.r I �� /x �� .`C � � c "� ,
'' � ���� �.-~���'`"�� �' � _l w`'� ���w � r �1j �` `1 � � r r-�� � i� rr� ,�° s ti �
ea
-�l y,1i' \ / 11 7�� "` �'� � z �
t,�� ~ �i" -�! --���� r � f � � //'� a � •-�•�s,./ 1�M _ z
�R�(�i � S"'�--'� r �4-� p �~! I � l � (\ ;� � = ��'� ^.r B �„� �� �j S D
� �
t �� � C� Cem� � �_-�,�...,� �� ( �—� � -v �`��� � � � ,�� � ,, o
�� � 4 S t � y> %1 r^^., 7 3
/ � \ l_"` �1 � �.'"„�_/' — ..r 5 ( 7r 3 � �, � -�
� �i�Y--- +' �� \' - i /" \ � f J 1�°j �—_ �`' < w s �
� Car er~ ( � � J -, �''�"' ,�' i�.
f I 'Stad urr�4i �i�,` >��Ce ��� .l�J�') � Sdes 1 2 ?�i ���( •. t t ��'�� 1-..'^`,��`_'���.�. F�°�/ �j,�� �� � �,�,
'� � c � °� �� (��'�, 1 �-�' � A (� � ouK.. -� Jr"_'��I��� 1 El?' `� ���`� �a���
/ � .r� /"�� �J J..� � ��e a ! 1^'' �� ��" �� / �� pmt.� l��j �f�3' J �
I�/,p�ir ib9q,^��_ '��-- -r�+,_, �_ i � ��y�{ I � � � J f � ... � f�1 � �"�^� f
% r� "�--sn-.:.,, �, � -'- —'�--, \ ' ~9 �-��.4+(7�^y\�� �� � � /f � `�`y- —��� �� � ' ,«
��� /J��� � �-�'�-.�f t ; �� `�„Y� �1-�� �!f �� %" f I � T � f,���4 �r� j# �` �� � �
� ( � 9��_ \` n / h v � �r"'1} �� �
�--�-..��t 4 � �''Cti� � \}t�y-'-�r-.� ' -�• l ��_ i ( 1✓ i� � � vs � .- �
63/ KI "��. � � � �r�T'�v-��Y-� ._ , � �...J r� '� � t� � �� r
��� � � '1 _ t-C�,i F�4 = �r ���C�` -�-=�—�_'_- �'� -*a.i � `�t/� � ��� ` a i � r � �
� 1l•., Ir
!�'_ _`y'�.,�, ) F F t � \ �y��. \ 5p�i� �\T� � .. � 1� ) _ � � �f'"�f '" ",,,� '� �
} • �
2,� �' � /(� Site 1 2 and 3 � ��� r.4� � �'` e �z > ,,
� � r 4'6 � Wake County � � c � �,, �',� ` T �"1�y4�
�1� � t¢ter�.a TIPNo RSP1 '� ,�\� i� -`-'q:,�, � � o
�,,\'a � /-�e Raleigh West USGS Topo Map(1068 1988) - � M � '��� '� ~y„�ubs � '��� 4 Y '�
� •--�-�yX� n;o��" 1 24 000 �t�'-'� �� o� l� ��� �� i.1 Y s.'1' ''�ti2v � � �E �!� i
� ��/ y � 1� !( t � �� �� s �' " � Z ``�� ,��c �r � €'Y $ ���
� ,�- � �,� _ � --�- �_ �
�, �'/��- i ?'"=-,.', F �,�� `� �,�l/� � �' r �' C f
�� �" ....� i \'� ` _"' V� a5 ,� �r ��� � �� W� -� �- � t�� � N I
� tr-� �,._f/ . Y� I( ` ,.�- � i i ' Q- O � 1,.� � E �y-+_
��e?'��,.��'C��^/I� /�`'� � �'' �`1��� � "`� '�� ����� \\~ �=��_ _ '�- '� �_f�� `���� �h. v �� ,�'+'��+�►
/� 1----���_ �____� }~w �� , � , � � ,�---t-� ",��� � ��t _��\ ��' .�
! � � f� � � ``�'�(
Magnetic Deciination '�r f � !4�f��1 t2 `r� '\`��.-\ � � ���--.-�r ti� � � � � � ��j'�\���r .��:..
�f��,I, � J���� �. �� ' ��-� � � ��-, �,.�..,`��_��!
'* ' �`�-y`�-� �" -- .,-`_ .5 4� � r �:� ' `�`�� �.. ���,
'� r ���� �.���' � �„�+ x s�.. C �� '���' `J�
/��,�, �� � �� r
� --,_`�;,.,� --� ,�� , „ J � � ; �,���� ` ����'
�-,� 1,�-.���� � � � r � .�, ����i�
' , � � `�-� � ,^� �, r ' z � � `''` r ��-`--,`�,.
1 `f.. '.. ' ` � � �(��(� A � / ,+. �\^ah�W l '? .�,\
� `,�
F � �
� 50 I `T-= r��jr -� .a SCALE 1 24000
t
/�1 � {"�'. � f 0 1 MILES
r � f�\
�,; i�.�,Y-�.�_ � � \
r 0 1000 YARDS
p �'� '�I 1�,.,��'��. i�`��; t`�",
~�J5 �'`�� � �� ^ t •r�� ��� � k�p 0 1 KILOMETER
`•S..r�
s w � � �P�� i� ->> � i+ �
Copynght(C)1998 Maptech Inc
e
�
�
I �
I SITE 3
� �
�
�./ �
�, — — —��.� '"
,�'� .� �. ----- .-�'
,— i
------- c _ - — �
--------------- � ° i ,
%° = —� ' .�-- �� /
—————— ——————————_—�.� _._. ,�_..� _._.. _��_=N.= —''�� �—
- - _----- - _________- ---_- _ --- .�_---- ----------�----�--
------- _ - - �.,.---------- _
_ — _ _ — _ _ _ _ _ _ _ _ _ _ _ _ —J1—______��______________ _`_I__
_ __ __ _ ___ _ _ �_�___�__ _�__ �_�_ / C
/ \
// �
_ ___�______�_______�________��_______�_�__ _____�______�_____—_
�__ —__ __— __ _ _ ______�_� ________—_
_________ _ _ _ _
__ — _ _ _ �^ _ _ _ � —�_�_______________��___�______
�.�c_____�_�_�����_���
---- --------------------------- T/----------
/ ----� �_ ---� ` �'==�
� -.-�- �� �
_ _ _ _ � � �`��� � �
�m_ / �
�- � -------- -��//// �
.�/o�� /,/
� ��
5I'll'E 1
SI'�'� 2
������� ����
I�T C D��'g' �F 'I['�f�N���I�'I°A'I'I�N
h �I�I�I�N ��' �'[IGIE�h�51'S
zoo o zoo aoo ����� ��LJ�T,g,�,
scn�E i zoo 1l�I$�J�C�" �0�188 (1$�FD°1)
Vl'.�I)E AV�N�J� �Mi ID
WITHERS � RAVENEL �C��t'��N
ENGINEERS I PLANNERS I SURVEYORS �y�,ULS iOI��� lO�f�� AN� I �i40
D C ry C I 5
I 6 33 faz 9 6 6 �w 1 h I L N C 3
SH�E'g° fl �V' 9
I
��
� ❑
��
��
--------�------------------- —
� — — — — —
— — II WADE AVE
EASTBOUND LANES
II ————————————— —
�� _��.�_�_�II�_ T T l� _ T T T
5 �� BANK �ItIGII�IAL END OF FII�E
II STABILIZATION� ,�CC�RDING T� THE 1969
�L.�NS
ETF____—
---- ETF .(^' _gCF— ---- —E-- —__
— ------------- � r `'. =k,— fY ;\ —______ f+
^ � �Y
.— .—_ —t= ^ � ` i�? s''`J `�s "` �I
- i�"' -�e v r,r E 7 f
iK
-� ���,re
�� .. r� � x'" �
� .. r 7 �
{1 qi ,�,. -* � -t
C �
� e �C\
\l� 1 �_i
+\} I / �
\ � STREAM IMd�t�CT 30 fi,F \ ' / 0 SE CPEE \/ �
�i ���
#\\ / P� � \�
\
f B/✓y 2 0 I
N
�qB
7p�
fk
W
�RB
rh
f2
#\
#\
#\
�1��L111/1J DENOTES IMPACTS IN
SURFACE WATER
���� �
ST�REAM FEATURE WILL BE COVERED ������ �������
BY THE PROPOSED PIPE SYSTEM
AND OUTFALL N C DE�"d' O1F 'I°IaANS]��K'TA'Il'I�N
� ,
�DIVISI�N �F �IGff-IWA�S
so o so ioo � W,��� C�UN�°�'
SCALE I 50 ���JECT 42188 GI$5�-1)
4 {�J Wf��Hi �VIL:N'11i. ll➢1•Ar
WITHERS O� RAVENEL BETW]EEN
ENGINEER5 I PLANNERS I SLIRVEYORS 7�yg�UIli 1CILLYGLLi lO�tb� AN1U' I�4IqIO
M K D ( N h I 2 5
I 9 9 69 33 0 f 9 6 6 8 h I � C 3
SEIEET 2 �� 9
� — —
1 WADE AVE _FOGE OF TRAVEL WAY
EASTBOUND LANES —___
EDGE OF 7RAVEL WAY
______.------ --.—__._ EDGE OF 7'RAVELWAY _
EDGE OF PAVEAIENT
-� -T T T -T T r� �_ ._ �7�� �'� T T T T r-
---- — ETF-------------�
__.._—______— f,+ �`
M \��
�qB \\��
f I �
BANK B z '�e� \ ��'�TF
�STABILIZATION � _______
� � ,� —
�
o --c"t�*'"V-�° ��� `'-' "" � Q BANK
c � � '� _
�STABILIZATION
c
rr� r � r �_�. �
' F \ s -
�, x C=c t�,` ✓
dq,� C +�C ,,, r,r ,.
/ :, .rh� � ..�;��\ } /� ��rt R EO CE55 RO FFNGE Y r y, �'� f
/ ` r'� r � '' a .e.. r-�_ ��F-'� � �`�j`" �.
E EE S� J ���� � � ����
0 -_ ! Y � �. �j '� ''
����,� S�'
liTTONWSE�EE 3
�
}3 ' /1
��� � �
BN 2 ( 3 ,
S �
/ k\� ��
j �i
SITE 2.� \
STREr11►�g IMI�t1CT=231 LF
\ SITE 2B
STR�AM I1�I�ACT=102 L�
}�+
\
\�\_--------�
+�
+�+
���� �
������ �������
� DENOTES IMPACTS IN
SURFACE WATER N C DE�'d' �F '�'R.�NSd��IdTA'�"I�N
fl�IVISI�N �F 1FIIGH�WA�S
so E so ioo W,eb�� C�UN�'�
SCALE 1 so �IB�JEC'd' 42188 (R5F—ll
�J W.�Y�E AVIEN�JE 1�M�
WITHERS O� RAVENEL BETWIEEN
ENGINEERS I PLANNERS I SURVEYORS 1[➢LUlli 1�I�DG� 1���� AN�D I SI�O
M K D C N hC I 5
I 9 33 fzz h 3
SHIEET 3 �1F 9
,
� � �� A` � � � \ \ r'
� �r ,- --� �1
I , � l
� e r SEE NOTE 3 I I� �_
� '/ W
II r \
� - ��-"--,
N
���
�� ? '
{ b ,�
{ � — — —r— — �' "—»—EU�re.,._
/�\ � — — — _- ��`� ll
�'�+�'F/ ��j'y �-—� ` \ \�
� _�� � �
^�� �, % � � � � � �`:
�� ��� , __-- �\
���%
� � �� \
��%x`°� ,,��F"� ' �
%� ,_—` \
,,-'� STR�r�M � ' ��
-'� IM�ACT=51 Y,F � \
� \
\ � �
�J�
�
�
� . �� ����
y � ����
�// // ��� ��� �I'''/ ��\
ut __ �_ �� '� \
y y_==—=�"�J ---==—� I'_ ''�i
—_______��pGE"-b�'�� � WB ENrRANC���,= ''' o
_�
� ----EDGE OF TRAVEL WAY �
--r-- ------------------
_ ��E OF TRAVELWAY _----- ---------
i — —
— ' — — —�IADE AVE
_�EDTE� OF rRAVELWAY=====__ ______
—i—
� �
NOTES
1 IMPACTS INVOLVES INSTALLATION OF CLASS II RIPRAP
ON STREAM BANKS AND WITHIN FLOWLINE OF CHANNEL
2 RIPRAP PLACEMENT WITHIN THE FLOWLINE TO ARMOUR
EXISTING SCOUR HOLE
3 RIPRAP DOWNSTREAM FINISH ELEVATION WILL MATCH
EXISTING STREAM ELEVATION SEE DETAIL SHEET 2D
���I°l� �
�°I�IE�1��I�'II �1�III���C°��
�!��!�����!4 DENOTES PERMANENT IMPACTS
� IN SURFACE WATER N C I��1�'6' �� 'f'I�AN�fi��Id'd'A'd'I�N
�iVI�IG�N �b' �33[IG&-IWA�YS
so o so ioo �T�q,�� C�DUN�[°`ft'
�
��--��— I
4 SCALE I 50 — — - I���TEC'i° 4218� (i85� 1)
t W��E At��N�T� ff$1�'�$�
WITHERS �~ RAVENEL ���rw��N
� E N G I N C E R S i P L A N N E R S I S U R V C Y O R S �y�U� 14I LLY l tl.: 71`rl'f'il 1LY �N lU' d �I�O
M A D C�N C I 5
I f I I -0 g�7�{� 7� 1
{ �7l1LiL� � �tl' �7
1
I � � � C
� �^ Z �
� N fn w � O
Z � � V � �
F �
a cn p, �
c
m� u� a ¢ � �*
� c � � E .� zS m � a
H in c�o n � � �, W L
� �
Q w U � ~ �' � 2 p r. �
p� � [�. W U .-�
O J � �
� � C �"' Z Q .L � 4.
� � C U C N V [il � W `�` a' O
w .., c m m � o M o � � � q 3 m
f-- X t �- � `'' f`� N �f1 V f- � ¢
� WU � d a o � 3 �n
w �'
0
QN U
LL
0..' � � O_ @ � W
} � � � E " w
� � �
Q
� c N
� (0 � f0 U
� � � a f0
� � � v
U a
Q � N
G � � �
(0 @ _ � c0
F- � N �-'
� U �
�
W -a N
a � m�
N � C U
� C � U ?
Z � @ N f0
� � J
a �' � � � v W
~ v � � �
W Q C N
� a o -o as
� f° m � �
� (0 C n' � _
Z V �
g w � �
�
� "
�
�C C U
� — � � }
� '� � �- m
0
w
�
�
� " w
C C � � K
fp = (0 U d
_ �
� LL N
� � .�
a
a� n
� T
U �
7 �
� N
Cn
C p �
� ~ Q I
@ p Z
� LL
�
J
� O Q m �
� z N N � O
H �
i
{
�
i
I� E 0
❑ w 0 6
II
II
_--___--______ __
____---�_-____�__-__--_-_____-
� - -.
II w�E AVE
EAST80UND LANES
II ---------------
-- -----I� r-r- - -r r r
-�_ -��� �r T-�
SITE 1 Z�NE 1
5 �� INIFACTS=4142 SF
�� SITE 1 Z�NE 2
IMI�.�CTS=155 SF
---- ETF �_ ETF_----
---------------
-_�_--_ f+
-- a
- -- - - '�n
- ._ __ -. _ E Z f Z0.
SI'Y'E 1 Z�NE 2 �
IMF.�CTS=1341 SF
,��, 'C`
—���-" � �\ �_,
�,
\'F � WSE C EE � �
\ �V \`1
�\
#\ \
/ � �
� �
P
EX B Nr ? 0
HC Nh'6
7�
fy
w
�RB
�H
F
+\
+\
#\
�
�
�
�
�
���� �
ALLOWABLE BUFFER IMPACTS ZONE 1
������ �������
� ALLOWABLE BUFFER IMPACTS ZONE 2 N C DE�'�' �1F "I'RANS]��RTA'I'I�N
II�IVISI�N �F HIGIEIWA�S
so o so ioo W,��� ( ��jUN'1[°�Y
t SCALE � so 1�R�JEC P �d2188 (gBSI� 1)
I
+ W�DE AV]ENUE ]BNiF
WITHERS � RAVENEL BCTW�EN
ENGINEERS I PLANNERS I SLIRVEYORS uyy�Uui IBI�G� 11��� L�Nlll' I 91QO
M K D C N hC I 5
I 9 9 69 33 0 f 9 7 I L C 3
SH�E'1° � �� 9
r
�,
� ----- _
�f WADE AVE ---��DGE OF 7RAVEL WAY _.
f EA57'BOUND LANES
EDCE OF TRAVEL WAY
______------ ---_._,_ EDGE OF TRAVELWAY _
EDGE OF PAVEMEN7
—.—, —.- —r -,— �— •— — — —�� —r �- T- -,--- �— r—
SI'f'E 2 Z�NE 2
_eTF_____________ IMF.�CTS=1903 SF
_____ ___________ f,+y. \`��
a ��
Nq9 \`��
lN ��
f ,\'�?°F
�/ SE C EE
� \ / � � �p E� �\
\�� � � �
�, � — \�.—� ir'
B� / py `1 �% _� �� !�
( �� ��� i
� � �/ ✓
�
SITE 2 ZONE 1
\ IMPr�C'g'S=13 488 S
}�+
\
\�\--------�
+�
+�+
���� �
ALLOWABLE BUFFER IMPACTS ZONE 1
������ �������
� ALLOWABLE BUFFER IMPACTS ZONE 2 N C DE�'Il' O� 'TIdANS��i�'i'ATI�N
d�gVISI�N �� d�IGIHWA�S
so o so �� W��]E C�UN�'Y
�«_
i scn�E i so �IB�JEC�° 42188 (I85F—ll
F
� WAIDE AVIENiIE �N�1�
� WITHERS � RAVENEL ���°w��N
' ENGINEERS I PLANNERS I SURVEYORS �[yLUIL'. 14I�G1Li 1p�AYl' fLN� I SI�O
M K D CryN hC I 25
I f 9 C
S�I]EE'll° � �� 9
�
f � �
Z�DNE 1
� �P IMFAC'd'S=1994 SF
�
P /
��
� � �
� � �\
s� `'�'� \
2C 2c
Z'P� Z'S�� �"��
N
��� ��� � W
C�` � W Z
Z�NE 1 � � zo i
�M�r�CTS=1663 SI' 'v '
m i �
' � C
m m _ x x \� A
� CONC FLUM�
� X ��— —_ \
/ �� \
/X/� / -\\ \
X � \\\
�X/ ���� \ �T�'\:
��� \
�� �� � �
� �ME ,� . . � Z�NE 2
%��C�N� F�U,-'cTF � �\ IMd�ACTS='�26 SF
,-' / Z�N� 2 " �\
�� IM�,�CTS=932 SF � �\
> � � ��
\� Y
) � � y i
i
/ � � � � ����
i� � �
� / S� ��
� � �
� �
t_ � — s —�'�'� --'��
� 1- --T- - -I '_ \
.__ �_ T �_ ���� _��
L - - � ��
— /`--EDGE O��AVEL WAYWB ENTRANCE __,—
------ � � __--
-- , �pGE OF �AV�L�'�---- O
— ,
� -------------------
----
--`—�--- EDGE OF TRAVEL WTY
� � — —
� � — — — WADE � �
—_fD('zE.�.E.If36V�LYY�Y ------ ---------------
---�r-- --
�
���I°IE �
ALLOWABLE BUFFER IMPACTS ZONE 1 m
��ll' ��� �������
� ALLOWABLE BUFFER IMPACTS ZONE 2 N � �y��� �p- ���NS1��Ib"g°A'd'I�N
�I�I�I�N �� lE-�IGIHWAI�
so o � so ioo ����� ��UN"1��'
�
scn�e i so ���J�C�° 421R8 (FgS�-1)
�J W H��JE A�'V�NLT� &�M,I°
W ITH E RS 6� RAV E N E L �ETw��N
E G INEERS I PLANNERS I S ll R EYORS 7[pLUlli 1CI��LLi 1p�J11� f1lNLJ' I 440
I, D C 1 hC 1 175
j7 3
5�-I�E"g' 8 ��' 9
� i
I� o
N
Z O
� �
a} � q
m �
a= w � r
�n� � z
Q= zp �,
�LL 111 U �
�� Q y � rn
Z
�� W ¢ H
F-(n � � U
a� Q W t�
W > O �
�� �
U a rn
Z
H
W
W
2
�
Li.
Qc U
G ?
C J
G W
� Z
� W
Q
� �
� �
U �
d =
�
� �
�
N � o
LL �- N �n
� M
W � U "' ^ m o � N }
� z / O r V' m N � m
l
LL W d N �
= Q � � ¢
m � � o �
� W W ^ N � � t+, �
�,�f �.L z V I� cD N
� � � r � d
a � � � �
m
Z�
O� Q Q Q Q
Q p Z z Z z
��
��
O � ,x,� � J
W � N a� �+ �
� �
u� •=�•v O
M F-
�
E
(
!t
t
� J
� <E a� 41
� a�a Z
?�
� F ` W F
� �
m
a
� u��� Q �
G T.g Cg � �
- a
�
�
�
W
I
F-
� 3
Q
W� � � �
�� \ / �� � ��
W
� W
W
UW
0
� #
� � � W�S�
T �
///yyy''' �
/ 7 � ' � � �� � ~
1
� / /� '"_ � �
i � / ''C � �
� i i
��/ i 2 � �
�� � �� � �
� �� a
F�
/� � � 2 a
�� ��� � �' � a � a
� �--
� � I � II � ,
� I II � �
� I II
�� i i i
,
� �. .,. ...�. �.�
�
�F W A TF9
o�, pG Office Use Only
� �� Corps action ID no
i ,�, � o � DWQ pro�ect no
Form Version 1 3 Dec 10 2008
Pre-�onstruetaon 1�lotafieation PCl� �'orm
A A licant Information
1 Processing
1a Type(s) of approval sought from the
Corps � Section 404 Permit ❑ Section 10 Permit
1b Specify Nationwide Permit(NWP) number NWP 3 and 13 or General Permit(GP) number
�
1 c Has the NWP or GP number been verified by the Corps� � Yes ❑ No
1d Type(s) of approval sought from the DWQ (check all that apply)
�401 Water Quality Certification—Regular ❑ Non 404 Junsdictional General Permit
❑ 401 Water Quality Certification—Express � Riparian Buffer Authonzation
1 e Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit
because written approval is not required� Certification
❑Yes � No �Yes ❑ No
1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation � Yes � No
of impacts� If so attach the acceptance letter from mitigation bank or in lieu
fee program
1 g Is the pro�ect located in any of NC s twenty coastal counties If yes answer 1 h ❑ Yes � No
below
1h Is the pro�ect located within a NC DCM Area of Environmental Concern (AEC)� ❑Yes ❑ No
2 Pro�ect Information
Maintenance repair activity at a failed hydraulic pipe system (Site 1) and streambank
2a Name of pro�ect stabilization (Sites 2 and 3) on Wade Avenue in Wake County A stormwater Dry
Detention Basin wdl be installed at Site 1
2b County Wake
2c Nearest murncipality/town Raleigh
2d Subdivision name N/A
2e NCDOT only T 1 P or state RSP 1 (formerly known as R 4436) WBS Number 42188
pro�ect no
3 Owner Information
3a Name(s)on Recorded Deed NCDOT(J W Bowman P E )
3b Deed Book and Page No N/A
3c Responsible Party (for LLC if N/A
applicable)
3d Street address Division 5 Office 2612 N Duke Street
3e City state zip Durham NC 27704
� — —
3f Te� `�one ,� (919)220 4600
3g Fax �� (919) 560 3371
� 3h Email address wbowman@ncdot org
�
1
�
Page 1 of 11
� PCN Form —Version 1 3 December 10 2008 Version
t
!
4 Applicant Information (if different from owner)
4a Appiicant is ❑ Agent ❑ Other specify
4b Name
4c Business name
(if apphcable)
4d Street address
4e City state zip
4f Telephone no
4g Fax no
4h Email address
5 Agent/Consultant Information(if applicable)
5a Name
5b Busmess name
(if applicable)
5c Street address
5d City state zip
5e Telephone no
5f Fax no
5g Email address
I
1
r
� Page 2 of 11
' PCN Form —Version 1 3 December 10 2008 Version
�
t
c
�
B Pro�ect Information and Prior Pro�ect History
1 Property Identif�cation
1a Property identification no (tax PIN or parcel ID) N/A
Latitude Site 1 2 35 80317 Site 3 35 80417
1b Site coordinates (in decimal degrees) Longitude Site 1 2 78 70073 Site 3 78 69836
(DD DDDDDD) ( DD DDDDDD)
1 c Property size 0 3 ac acres
2 Surface Waters
2a Name of nearest body of water(stream river etc)to UT to House Creek (Site 1 2) and House Creek (Site 3)
proposed pro�ect
2b Water Quality Classification of nearest receiving water C NSW for UT to House Creek and House Creek
2c River basin Neuse River Basin
3 Pro�ect Description
3a Descnbe the existing conditions on the site and the general land use in the vicinity of the pro�ect at the time of this
application
Wooded land
3b List the total estimated acreage of all existing wetlands on the property
OOac
3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property
30 linear feet at Site 1 231 linear feet at Site 2A 102 linear feet at Site 2B and 51 linear feet at Site 3
3d Explain the purpose of the proposed pro�ect
Maintenance repair activities at a faded hydraulic pipe system and streambank stabilization on Wade Avenue in Wake
County
3e Describe the overall pro�ect in detail includmg the type of equipment to be used
Equipment will include backhoe crane excavator etc
4 Jurisdictional Determ�nations
4a Have�urisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property/
pro�ect(including all prior phases) in the past� ❑ Yes � No ❑ Unknown
Comments
4b If the Corps made the�urisdictional determination what type � Preliminary ❑ Final
of determination was made�
4c If yes who delineated the�unsdictional areas� AgencylConsultant Company
Name (if known) Other
4d if yes list the dates of the Corps�unsdictional determinations or State determinations and attach documentation
5 Pro�ect History
t 5a Have permits or certifications been requested or obtained for � Yes ❑ No ❑ Unknown
this pro�ect (includmg all prior phases) in the past�
5b If yes explain in defi3�l accoruing to help file instructions
Permit application for�his pro�ect(then known as R 4436) on 8/10/09 Impacts only for failed hydraulic pipa system (Site
, 1) on Wade Avenue m the permit application DWQ issued WQC and buffer authonzation on 8/14/09 (DW� Pro�ect No
4r
20090876)
{
�
Page 3 of 11
PCN Form—Version 1 3 December 10 2008 Version
6 Future Pro�ect Plans
6a Is this a phased pro�ect� ❑Yes � No
6b If yes explain
�
Page 4 of 11
PCN Form—Version 1 3 December 10 2008 Version
C Proposed Impacts Inventoy
1 Impacts Summary
1 a Which sections were completed below for your pro�ect(check all that apply)
❑Wetlands � Streams tributaries � Buffers
❑ Open Waters ❑ Pond Construction
2 Wetland Impacts
If there are wetland impacts proposed on the site then complete this question for each wetland area impacted
2a 2b 2c 2d 2e 2f
Wetland impact Type of�unsdiction
number— Type of impact Type of wetland Forested (Corps 404 10 Area of impact
Permanent(P) or (if known) DWQ—non 404 other) (acres)
Tem ora T
W1 ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W2 � P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P ❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P ❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P ❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g Total wetland �mpacts 0 0 acre
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this
question for all stream sites impacted
3a 3b 3c 3d 3e 3f 39
Stream impact Type of impact Stream name Perennial Type of�urisdiction Average impact
number (PER) or (Corps 404 10 stream length
Permanent(P) or intermittent DWQ—non 404 width (linear
Temporary(T) (INT)� other) (feet) feet)
S1 � P �T Fill and rip rap m fiow UT to House � PER � Corps 10 ft 30 ft
line/bank of stream Creek ❑ INT � DWQ
231 ft at
S2 � P ❑ T Rip rap on bank UT to House � PER � Corps 10 ft Site 1 B
Creek ❑ INT � DWQ 102 ft at
Site 2B
S3 � P 0 T Fill and rip rap in flow House Creek � PER � Corps 10 ft 51 ft
line/bank of stream ❑ INT � DWQ
S4 ❑ P ❑T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S5 ❑ P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S6 ❑ P � T ~ ❑ PER ❑ Corps
� ❑ INT ❑ DWQ
k 3h Total stream and tr�butary�mpacts 414 ft
!
f 3i Comments
�
I Page 5 of 11
� PCN Form —Version 1 3 December 10 2008 Version
�
4 Open Water Impacts
If there are proposed impacts to lakes ponds estuanes tr�butaries sounds tne Atlantic Ocean or any other open water or
the U S then individually list all open water impacts below
4a 4b 4c 4d 4e
Open water Name of waterbody
impact number (if applicable) Type of impact Waterbody type Area of impact(acres)
—Permanent
(P) or
Tem ora T
01 ❑ P ❑T
02 ❑ P ❑T
03 ❑ P ❑ T
04 ❑ P �T
4f Total open water impacts 0 0 ac
4g Comments
5 Pond or Lake Construction
If ond or lake construction ro osed then com lete the chart below
5a 5b 5c 5d 5e
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose of (acres)
number pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
Sf Total
5g Comments
5h Is a dam high hazard permit required�
❑ Yes ❑ No If yes permit ID no
5i Expected pond surface area (acres)
5� Size of pond watershed (acres)
5k Method of construction
i
ti
�
� Page 6 of 11
PCN Form —Version 1 3 December 10 2008 Version
�
�
f��
6 Buffer Impacts (for DWQ)
If pro�ect will impact a p otected riparian buffer then complete the chart below If yes then individually list all buffer impacts
below If an im acts re uire miti ation then ou MUST fdl out Section D of this form
6a
� Neuse ❑ Tar Pamlico ❑ Other
Pro�ect is m which protected basin� ❑ Catawba ❑ Randleman
6b 6c 6d 6e 6f 6g
Buffer impact
number— Reason for BufFer Zone 1 impact Zone 2 impact
Permanent(P) impact Stream name mitigation (square feet) (square feet)
or Temporary required�
T
B1 � P ❑T mai nenance UT to House Creek � NoS 4 142 sf 1 496 sf
62 � P ❑T Stab lization UT to House Creek � NoS 13 488 sf 1 903 sf
B3 � P�T Stab lization House Creek � NoS 3 437 sf 1 658 sf
6h Total buffer�mpacts 21 067 sf 5 057 sf
6i Comments
D Impact Justification and Mitigation
1 Avoidance and Minim�zation
1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing pro�ect
Rip rap has been reduced to minimum amount necessary to provide long term stability
1 b Specifically descnbe measures taken to avoid or minimize the proposed impacts through construction techrnques
Construction equipment will not be allowed outside of permitted stream and buffer impact Further minimization will occur
on site dunng construction
2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State
2a Does the pro�ect require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U S or Waters of the State�
2b If yes mrtigation is required by(check all that apply) ❑ DWQ ❑ Corps
❑ Mitigation bank
2c If yes which mitigation option wdl be used for this pro�ect� ❑ Payment to in lieu fee program
❑ Permittee Responsible Mitigation
3 Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter) Type Quantity
Page 7 of 11
PCN Form—Version 1 3 December 10 2008 Version
�
3c Comments
4 Complete if Making a Payment to In lieu Fee Program
4a Approval letter from in lieu fee program is attached ❑ Yes
4b Stream mitigation requested linear feet
4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold
4d Buffer mitigation requested (DWQ only) square feet
4e Riparian wetland mitigation requested acres
4f Non riparian wetland mitigation requested acres
4g Coastal (tidal)wetland mitigation requested acres
4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan
6 Buffer Mitigation (State Regulated Riparian Buffer Rules)—required by DWQ
6a Wi�l the pro�ect result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation�
6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c 6d 6e
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1 5
6f Total buffer mitigation required
6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank
permittee responsible npanan buffer restoration payment into an approved in lieu fee fund)
6h Comments Discussed stream and npanan buffer permitting with Rob Ridings on 9/19/2011
Page 8 of 11
PCN Form—Version 1 3 December 10 2008 Version
E Stormwater Management and Diffuse Flow Plan (required by DWQ)
1 Diffuse Flow Plan
1 a Does the pro�ect include or is it ad�acent to protected nparian buffers identified � Yes ❑ No
within one of the NC Riparian Buffer Protection Rules�
1 b If yes then is a diffuse flow plan included� If no explain why
Comments Permit application only involves maintenance repair at a failed site and
stabilization of streambanks No new impervious surface is being added to the ❑ Yes � No
pro�ect in con�uction with this activity Additionally a stormwater dry detention basin
is to be constructed at Site 1
2 Stormwater Mana ement Plan
2a What is the overall percent imperviousness of this pro�ect� N/A%
2b Does this pro�ect require a Stormwater Management Plan� ❑ Yes � No
2c If this pro�ect DOES NOT require a Stormwater Management Plan explain why Permit application only involves
maintenance repair at a failed site and stabilization of streambanks No new impervious surface is being added to the
pro�ect in con�uction with this activity Additionally a stormwater dry detention basin is to be constructed at Site 1
2d if this pro�ect DOES require a Stormwater Management Plan then provide a brief narrative description of the plan
❑ Certified Local Government
2e Who wdl be responsible for the review of the Stormwater Management Plan� ❑ DWQ Stormwater Program
❑ DWQ 401 Urnt
3 Certified Local Government Stormwater Review
3a In which local government s�urisdiction is this pro�ect�
❑ Phase il
3b Which of the following locally implemented stormwater management programs ❑ NSW
apply(check all that apply) ❑ USMP
❑Water Supply Watershed
❑ Other
3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached�
4 DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a Which of the following state implemented stormwater management programs apply � ORW
(check all that apply) ❑ Session Law 2006 246
❑ Other
ab Has the approved Stormwater Management Plan with proof of appraval beer�
attached� ❑ Yes � ❑ No
5 DWQ 401 Unit Stormwater Review
5a Does the Stormwater Management Plan meet the appropriate requirements� � Yes ❑ No
Page 9 of 11
PCN Form—Version 1 3 December 10 2008 Version
5b Have all of the 401 Unit submittal requirements been met� ❑ Yes ❑ No
F Supplementary Information
1 Environmental Documentation (DWQ Requirement)
1 a Does the pro�ect involve an expenditure of public (federal/state/local)funds or the � Yes ❑ No
use of public(federal/state) land�
1 b If you answered yes to the above does the pro�ect require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act(NEPA/SEPA)�
1c If you answered yes to the above has the document review been finalized by the
State Cleanng House� (If so attach a copy of the NEPA or SEPA final approval
letter) ❑ Yes � No
Comments
2 Violations (DWQ Requirement)
2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated
Wetland Rules(15A NCAC 2H 1300) DWQ Surface Water or Wetland Standards ❑ Yes � No
or Riparian Buffer Rules(15A NCAC 26 0200)�
2b Is this an after the fact permit application� ❑ Yes � No
2c If you answered yes to one or both of the above questions provide an explanation of the violation(s)
3 Cumulative Impacts(DWQ Requirement)
3a Will this pro�ect(based on past and reasonably anticipated future impacts) result m � Yes � No
additional development which could impact nearby downstream water quality�
3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered no provide a short narrative description
4 Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatrnent methods and disposition (non discharge or discharge) of wastewater generated from
the proposed pro�ect or available capacity of the sub�ect facility
N/A
Page 10 of 11
PCN Form—Version 1 3 December 10 2008 Version
5 Endangered Species and Designated Critical Habitat(Corps Requirement)
5a Will this pro�ect occur in or near an area with federally protected species or � Yes � No
habitat�
5b Have you checked with the USFWS concerning Endangered Species Act � Yes � No
impacts�
❑ Raleigh
5c If yes indicate the USFWS Field Office you have contacted
❑ Asheville
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Cntical
Habitat�
On site evaluation
6 Essential Fish Habitat(Corps Requirement)
6a Will this pro�ect occur in or near an area designated as essential fish habitat� ❑ Yes � No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat�
Available mapping
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Wdl this pro�ect occur in or near an area that the state federal or tnbal
governments have designated as having histonc or cultural preservation �Yes � No
status (e g National Historic Trust designation or properties significant m
North Carolina history and archaeology)�
7b What data sources did you use to determine whether your site would impact historic or archeological resources�
Consultation with the State Historic Preservation Office
8 Flood Zone Designat�on (Corps Requirement)
8a Will this pro�ect occur in a FEMA designated 100 year floodplain� ❑Yes � No
8b If yes explain how pro�ect meets FEMA requirements
8c What source(s) did you use to make the fioodplain determination� Consultation w/NCDOT hydraulics unit
C � c%�/�GL �� <<lZ�/��
�`�S � I I
ApplicanUAgents Printed Name Applicant/Agents Signature Date