Loading...
HomeMy WebLinkAboutNCC201319_Modification Review_20210119Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 1/19/2021 7:34:39 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 1/19/2021 8:01:08 AM (Construction COC ADD TO FILE Review- NCC201319) • The task was assigned to Georgoulias, Bethany. The due date is: January 22, 2021 5:00 PM 1/19/2021 7:34 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC201319 Coverage (COC) Enter the Certificate of Coverage N nber (use capital letters) No.* Information associated with this permit: Project Name Sutton Plant Castle Hayne 230kV Sub 115kV North and South - Reconductor Line Address 801 Sutton Steam Plant Road, Cape Fear Township, NC County New Hanover Latitude 34.2835 Longitude-77.9846 Permittee Listed Duke Energy Progress, LLC Legally Responsible Randy Veltri Individual NC Reference No. NCG01-2020-1319 E&SC Plan ID Original NOI Tracking No. NEWHA-2018-014 23842 Date COC Issued* 04/03/2020 Prior Rescission This field will populate only if CCChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual and/or Site Contact Has Changed r Multiple Reasons (List) Addional Nbre information if needed (e.g., new Site Contact details can be included here) Explanation Limits of disturbance were increase to accommodate a larger laydown area. The laydown area is used for materials and equipment. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form Supporting Upload Supporting Documentation (Revised E&SCApproval, nose -Out Doc, etc.) Documentation NEWHA-2018-014 Approval Revised 1-8-2021.pdf 294.21KB Mist be FDFfornat North Carolina General Statute 143-215.6113 (i) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). � I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Randy Veltri Title * Director of Transmission Permitting Organization* Duke Energy Progress, LLC Date * 01/19/2021 Email Address* Randy.Veltri@duke-energy.com En -ail for confirnation Telephone Number* 704-382-2741 Contact nunber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email esteffens@dewberry.com (Optional) Additional en -ail for confirnation Original Permittee randy.veltri@duke-energy.com Email Original Site Contact Nuwan.Wijesuriya@duke-energy.com Email Review Date 01/19/2021 Rescinded Since Submitted? Request Date 20210119 Formatted Review Date 20210119 Formatted