HomeMy WebLinkAbout20061810 Ver 1_401 Application_200611062006180
ARCADIS
Infrastructure, environment, facilities
Division of Water Quality
401 Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
c®u~,-ESA
CQp~
ARCADIS G&M of North Carolina, Inc.
801 Corporate Center Drive
Suite 300
Raleigh
North Carolina 27607
Tel 919.854.1282
Fax 919.854.5448
www.arcadis-us.com
~- f
Subject:
PCN Application for Notification -City of High Point Storm Water Capital
Improvement Project -Hurdover Street Site, High Point, Guilford County, North
Carolina
Dear Sir/Madam:
Please find attached two copies of the Pre-Construction Notification (PCN)
Application for the above referenced project. The PCN Application is being provided
to the Division of Water Quality for notification purposes. The City of High Point is
proposing to perform storm water maintenance activities at the Hurdover Street site
to improve drainage. Impacts associated with the proposed maintenance activities
total approximately 25 feet (0.005 acre) of permanent stream impacts. No wetland
impacts will occur from the proposed maintenance activities.
If you have any questions, please contact me at (919) 854-1282.
Sincerely,
ARCADIS G&M of North Carolina, Inc.
l Q~
Linda Die olt
Senior Scientist
Copies:
Chris Thompson -City of High Point
Linda Pass -ARCADIS
WATER RESOURCES
Date:
20 November 2006
Contact:
Linda Diebolt
Phone:
220
Email:
Idiebolt C~ arcadis-us.com
Our ref:
G RH PT006.0001
~~~a~~
N~~ ~ A xpQ~
ni~wtlR1 Ufa t~s~-~C;M
2oos~ ago
Office Use Only: Form Version March 05
USACE Action ID No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
I. Processing
1. Check all of the approval(s) requested for this project:
® Section 404 Permit ^ Riparian or Watershed Buffer Rules
^ Section 10 Permit ^ Isolated Wetland Permit from DWQ
^ 401 Water Quality Certification ^ Express 401 Water Quality Certification
2. Nationwide, Regional or General Permit Number(s) Requested: NWP-3
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed
for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII,
and check here: ^
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details ,check here:
II. Applicant Information ~w'~
1. Owner/Applicant Information
Name: City of High Point ~ ~ ~~i~
Mailing Address: Chris Thompson
P.O. Box 230
211 South Hamilton Street
High Point, NC 27261
Telephone Number: 336.883.3215 Fax Number: 336.833.1675
E-mail Address: Chris.thompson(a~highpointnc.gov
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name: Linda Diebolt
Company Affiliation: ARCADIS
Mailing Address: 801 Corporate Center Drive, Suite 300
Raleigh, NC 27607
Telephone Number: 919.854.1282 Fax Number: 919.854.5448
E-mail Address: ldiebolt(a~arcadis-us.com
Updated 11/1/2005
Page 5 of 14
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also, provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps maybe included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: City of High Point Storm Water Capital Improvement Project -Hurdover
Street Site
2. T.I.P. Project Number or State Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN):
4. Location
County: Guilford Nearest Town: High Point
Subdivision name (include phase/lot number): Rotary/Farriss
Directions to site (include road numbers/names, landmarks, etc.): Project Site: Hurdover
Street south of Ed~edale Drive -from I-85 go north on US-311/N. Main Street towards
Ashland Street. Continue to US-311/N. Main Street for 5.8 miles. Turn left onto W.
Parkwa~Avenue (<0.1 mile). Turn slightly to the right to stay on West Parkway Avenue.
Make a right onto Hurdover Street. Project site is located on Hurdover Street south of
Edgedale Drive.
5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that
separately lists the coordinates for each crossing of a distinct waterbody.)
Decimal Degrees (6 digits minimum): 35.97012500 °N 80.02205278 °W
6. Property size (acres): <0.25 acre
7. Name of nearest receiving body of water: Unnamed tributary to Payne Creek
8. River Basin: Yadkin-Pee Dee
(Note -this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
Updated 11/1/2005
Page 6 of 14
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Developed - urban/residential within the City of High Point
10. Describe the overall project in detail, including the type of equipment to be used:
The Hurdover Street Site project is a maintenance project that will improve drainage. A 90-
foot long 36-inch reinforced concrete pipe will be replaced with a 90-foot long 4-foot b}_6-
foot box culvert. The box culvert invert will be buried one L) foot below the streambed on
both ends. Rip rap aprons will be placed at the inlet and outlet of the culvert. Approximately
140 feet of the stream bank will be stabilized with turf reinforcement fabric. The equipment
that will be used to perform the construction will include an excavator, loader, and
compaction equipment.
11. Explain the purpose of the proposed work: The work is being performed to provide
maintenance on the City of High Point storm water infrastructure. The work will improve
the conveyance of storm water and control erosion in the project area.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USAGE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules. No permits or certifications have been applied for or issued for this
project at this time.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Future permit requests are not anticipated for the project described herein.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. Each impact must be
listed separately in the tables below (e.g., culvert installation should be listed separately from
riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts,
permanent and temporary, must be listed, and must be labeled and clearly identifiable on an
accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial)
should be shown on a delineation map, whether or not impacts are proposed to these systems.
Updated 11/1/2005
Page 7 of 14
Wetland and stream evaluation and delineation forms should be included as appropriate.
Photographs maybe included at the applicant's discretion. If this proposed impact is strictly for
wetland or stream mitigation, list and describe the impact in Section VIII below. If additional
space is needed for listing or description, please attach a separate sheet.
Provide a written description of the proposed impacts: No stream impacts will occur from
r_placement of the existing 90-foot long 36-inch reinforce concrete pipe with a 100-foot long
four-foot by six-foot box culvert. Approximately 25 feet of impacts to the unnamed tributary
to Payne Creek will occur from the installation of rip rap aprons in the stream channel at the
inlet and outlet of the box culvert. No stream impacts will occur from the placement of
proximately 140 feet of turf reinforcement fabric downstream of the culvert since the
fabric will be installed above the normal water level of the stream. Precautions will be taken
during construction activities to ensure that no construction material inadvertently impacts
the stream. No wetland impacts will occur from the proposed project.
2. Individually list wetland impacts. Types of impacts include, but are not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
separately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
(yes/no Distance to
Nearest
Stream
linear feet) Area of
Impact
(acres)
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property: 0 acre
4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact
Number
(indicate on ma)
Stream Name
Type of Impact
Perennial or
Intermittent? Average
Stream Width
Before Im act Impact
Length
(linear feet) Area of
Impact
(acres)
1 UT to Payne Creek Rip rap Intermittent 8 feet 25 0.005
Total Stream Impact (by length and acreage) 25 0.005
Updated 11/1/2005
Page 8 of 14
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dredging, flooding, drainage, bulkheads, etc.
Open Water Impact
Site Number
(indicate on ma)
Name of Waterbody
(if applicable)
Type of Impact Type of Waterbody
(lake, pond, estuary, sound, bay,
ocean, etc.) Area of
Impact
(acres
Total Open Water Impact (acres)
6. List the cumulative impact to all Waters of the U.S. resulting from the project:
Stream Impact (acres): 0.005
Wetland Impact (acres): 0
Open Water Impact (acres): 0
Total Impact to Waters of the U.S. (acres) 0.005
Total Stream Impact (linear feet): 25
Isolated Waters
Do any isolated waters exist on the property? ^ Yes ®No
Describe all impacts to isolated waters, and include the type of water (wetland or stream) and
the size of the proposed impact (acres or linear feet). Please note that this section only
applies to waters that have specifically been determined to be isolated by the USACE.
8. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands
Describe the method of construction (e.g., dam embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Current land use in the vicinity of the pond:
Size of watershed draining to pond: Expected pond surface area:
Updated 11/1/2005
Page 9 of 14
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It maybe useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also, discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts. Impacts to jurisdictional
streams cannot be avoided except by choosing a no-build alternative. Impacts to the unnamed
tributary to Payne Creek have been minimized to the extent feasible. The size of the rip rap
aprons at the inlet and outfall of the box culvert have been decreased to the minimum amount
required to prevent scouring. All excavated materials will be removed from the site: Stockpiled
materials will not be placed within jurisdictional wetlands, and sedimentation and erosion control
devices will be placed on the downgradient side of the stockpiled materials. No live concrete
will be placed within the stream channel.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on January 15, 2002, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USAGE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete.
An applicant may also choose to review the current guidelines for stream restoration in DWQ's
Draft Technical Guide for Stream Work in North Carolina, available at
http://1~2o.enr.state.nc.us/ncwetlands/stemgi de.html.
Updated 1 l /1 /2005
Page 10 of 14
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
Mitigation is not proposed in conjunction with this project.
2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement
Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at
(919) 715-0476 to determine availability, and written approval from the NCEEP indicating
that they are will to accept payment for the mitigation must be attached to this form. For
additional information regarding the application process for the NCEEP, check the NCEEP
website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please
check the appropriate box on page five and provide the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount ofNon-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (required by DWQ)
1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of
public (federaUstate) land? Yes ^ No
2. If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ^ No ^
3. If yes, has the document review been finalized by the State Clearinghouse? If so, please
attach a copy of the NEPA or SEPA final approval letter. Yes ^ No
Updated 11/1/2005
Page 11 of 14
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate, and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC
2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please
identify )? Yes ^ No
2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers.
If buffer mitigation is required calculate the required amount of mitigation by applying the
buffer multipliers.
* I Impact I Required
Zone , ~,_~_~ ~ ~~~ Multiplier r~;+;,,,*;,,,,
1 3 (2 for Catawba)
2 1.5
Total
* Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an
additiona120 feet from the edge of Zone 1.
3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e.,
Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the
Riparian Buffer Restoration Fund). Please attach all appropriate information as identified
within 15A NCAC 2B .0242 or .0244, or .0260.
XI. Stormwater (required by DWQ)
Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss
Stormwater controls proposed in order to protect surface waters and wetlands downstream from
the property. If percent impervious surface exceeds 20%, please provide calculations
demonstrating total proposed impervious level. Existing impervious surfaces at the Hurdover
Street Site consists of Hurdover Street. No changes to the impervious area associated with
Hurdover Street will occur from the project. Approximately 0.005 acre of rip rap will be placed
within the stream channel to prevent scouring at the inlet and outlet of the culvert. Erosion and
sediment control measures will be in place durins; construction as shown on the attached Erosion
and Sediment Control Plan drawing.
Updated 11/1/2005
Page 12 of 14
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
No wastewater will be generated from the implementation of the proposed project.
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ^ No
Is this anafter-the-fact permit application? Yes ^ No ^
XIV. Cumulative Impacts (required by DWQ)
Will this project (based on past and reasonably anticipated future impacts) result in additional
development, which could impact nearby downstream water quality? Yes ^ No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: The
proposed maintenance activities at the Hurdover Street Site will not increase development,
directly or indirectly. The proposed maintenance activities will improve the conveyance of
storm water and control erosion in the T,roiect area.
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Updated 11/1/2005
Page 13 of 14
Applicant/Agent's 8 gnature Date
(Agent's signature is valid only if an authorization Letter from the applicant is provided.)
~~r~~ i uvz~t~
Page ] 3 of f 3
0
0
0
0
J `~ Storm Water Capital Improvement Project
~ Stream 1
25 feet of stream impact
No wetland impacts
~~s-:
{, rr
~~
Site Location Map
Hurdover Street Site
City of High Point Storm Water Capital Improvement Project
Source: USGS Quadrangle Map -High Point West, North Carolina
1 inch equals 0.25 miles
_ ~.
Ch Wk6 -_ ~a5tcrast~~. ~,i
WkE Elrnhu~s~ Ave o~ ir;~y~,a-cod D; -
~Wk~ ~ ~" >V,
~: y-isti,-tai ,
..::: ~,- ~ 3 ~
r kC 7 ~~~ ^~ J ' U) , . ~~ ~ Day""1071 r>,Ve .il 1~ ~ ~.f
` ^
((,,{~ Gt -,~ ., ~~ r ~s Birch~~oLU Dr f~io r F vayto~i Svc
C0~?~a2Ad yt J _ ~'l,~ar(Jl~i ~ ,_ '_-
- _ ~ k .;
r>
2'
J ,
Wks- _ ~ - ~t 3y ~. Sfate Ave E
o, E'nB _ Laixai Ln _-- -
,,
a ~ ~ - ~ayr o~tn =~
,~ ,; ~ Parks r`
_._ _. -__.. __ _._._._.___ ~ ,n
- h ~ Storm Water Capital Improvement Project ;tz~,~,Pi N ~~
'"~ Stream 1 ~ ~" ~ toy;
~ ~~ 3 25 feet of stream impact ~ L ~~~,~ ' l ~
_n No wetland impacts ~ ~ ~ ` Pie
MhB2 ~ _ ~,,:: N '~euy Pfi l g~o~ ~
- - ,~ I
~~ ~ = ~ u-. ~ ~ Hillcrest Dr i ,~ ~ ~~ '~
_ -- -.
J
I - _
cr ,, ~`'t ~ T, ;~, , Edgedale Dr / i I<l=dgedale Dr ~ `.,% , o `FaCf~~'~ `~
=~ ~,~~~ ~Wj i - ___ ~ ~~ yam, ~e
.,? Ashtev Ave 5,~, ---_~ \ g\N \°~ ,e~t5e
O. G;ryi~nawoo-l Ave - ~ Fay«s ~ `~,~ ~
~ Dcwershire P1 - _~; ~ A~~-
` e`c
~;
P
O \Ncodbrnoh Dr Otteray Ave ~o Totera RI `r'' \ ~
WkEWkC ,
,, ,~ ~~~/ ~7r ktl~ay rave ~. ,~ E ..
~~~ ~ _ _ -
Eu6
-- _ D
~° O `_~ ~oior~~al - ,b ~ ~_
,~" _ ~ - - - ~ ~ ~- --i ! . 7
;~
_,
tr
~i ~ ~ _
^- a
`°' U !''J Ray Ave
- --
r~111 kE o __
~,~J~,t~7irsirDr a,.. r> _
~ ~; ~ ~
a. ~ , e
'`~ WkC ~I ~' ,_ ~'
I tr le~dr
_._ _ _Et1B ~~' ~ ! ~uaker Ln " ~ t e t
~ _~ ~~ _,
~. m ~ ; ~ Guak~r 1 ~
~ ~ eye
/ - ~, Fe1nw ,~ ~ ~ ~ ~>
s a ,_ _ _ -- = West~:vond Ave `~
~ - ~o J o 1 --> .- ,~, 1% s
m L i1r~i~r~rst D' .r .~ ~ - ~ .r ~ ~ ~ h~ ~?-
m ~ Gatewood Ave ~ =~
~- Ferndale Blvd u ,
~ ;
~ _ - ------~ - - ,r
i onrr _~ Uk ~ ~ L
_c,Y ~` hrr St~~~
1~ a
h _ °' ' - ,U
4'~~''
3 ~ u
-- ~ 1~h
- ~ ~ ~`~~,
~ ~ __-
. ~ Chap ~tller Ate ~ : -, i
\ ~~ ~
,.;. i
o l : -' ;n ~ He=lack Ave ^` .c'- ~
p r ~'
~,;
c
cn KA~)n£, Y
m
~ `>
~( ~
c ,,Chestnut - , , , ;~
~.
'. ~, Arber A ~ ~
~' _ i0
~ '~ ~ EnC-- ~h~l~D e,. ^-'.~ ~ r Ate oigti '; ,~~~ ,.,
I_ ~+ s. ~ d o` _
,. - Av r 13aIKx ~ ~
~:.~ EnB EnB `EnB EnB ?~~ Ott ~i `~ o
Soils Map
Hurdover Street Site
City of High Point Storm Water Capital Improvement Project
1 inch equals 0.25 miles
n~ c s i o i r- r n a n i s, t n ~ ~ r t ~
r ~
m
g x ~ w ~
~~~~ ~' H H t-- /- ~
~~
m
~
~
~/
~
K
i~~~~l g~ ~ 3°0
~c
~o ~~o
J . - W U7 o m 2 ,Z ~ W" Z w l A' J ~ ~
~O ~~ ~ W Oh 2 ~ (LZ ~ ~~.
¢ F
~
~
~~
~ ~
~ . ,
~ ~ ~ ~;
~
~ C~
N
i.i..
~ ~~
w
a~
w~S+~ c~~in~
(~~W~ ~z~ °~~ °uo ~~~.cn
r
J ~~p .~
~Z LLz
µ~
~
0 #
~~'
~ ~ ~. ~, ~ fn W ~Z{
LL' ~ W J
(,~' ~,,,, (~ O.
w oW
d
N
y
~
wa Z Ww~'v wU JV ~u.~7s
a _.~w ¢m ~ O ~o~ x3o~
0
O
~ Q.
~ ~
1 ~
c ww ~ (fj ~ ~
_ ~ Q.. O ~
a
O~
Z .
~ ~~
ww4 r~~~
¢z~¢ a~
~N"'N ~~~p ~~~; N~~ ~ `r~
~ t}{~
YC. ~ ~~~ ~ '~
.rte ` a ie uw~
~ ~ ~ fY
~ ~ ~- ~
¢
6
~
~o
~da Ezra Boa ~o~ ~
x°wo~ wN~s =~w sewz 1~m?
~gm
¢~
W
~ o ~
Y ~„ ~
# - ~ w ~
F
Q ~ .~ W
~ = j 4 ~ k
$ ~
iO ~
~~W~G¢
u
~~o ~zdw~
V Z pZ ~ W w r N Q ~
w }~
m 1 uxi ..~w da..,ed C..?
~
~
~ a ~
f-N Z~ V~~~ ¢U¢wW~~. R. p. F-
~mmw~ -'az0 ~~~w (xZ~iw ~4~~
w z
~~~ ~
T
~
~ w
,
t w$
UZg
w ~w
0
cZZa
ox~~C¢ ~Z
O y Q ~ O~ W a U. W e d U~ tlJ ~ q~, 6 4 0 0~.
~! -~a'~- ~
,-- N th O tri i3.
f'-~ -~`~\ 1 t
~
4
~
~
}
s
~~
~
~ ~
~
1
U
r a - ~ Z
a0~ = a
~
~ R ~
~ ~ ~'~ "' ~
w .,
1i
1
,
~ O a
~
~
:, ,
`
~ z
" mob: ~ ~
~ 1 \
`~~ ~
~1
.
~~
~ ~
'
~
~
~
fir
`
4
~
\
\
'
c,
1
.~~ ~ ~~~A ~~VA. `~ ti ~ '~
*~ '
,
~~
~ go~pk ~
i ins .~~ ~
~
~ ~ ~
~
~ t
i
1
~
~ --
~
!/
!
(
~,~, r ~~ i i~ 1 } ~
6 ,C t ~
a ~
1
~
1 C' ~ a ~~
~ 11~ ~ ~ ° t w i I 1
} 1 ~ ~
~ ~ ~~
~ ~ ~ 1 1
1
~ ~ ~,
I ~ z ~
~ '
,
}
~
1
~ r.
w
t ~ `~ i ~ ~ , ~ ~,~
0 ~ o ~,
`~
t '
~
~ i ~
~~
~
~ p
'z~ }~tT \ \ J~ C.
-..._~, ~ ~ ~ t ~l ~. M 7~V ~ AA
~
Nmo ~
7.
R
~^
''r
~N
.
i
.
o. z ~ .,~ ~. ° ~`
,~ ~ ~
~~ " n~% vend ~~" ~ ~ '~
r ~~~'f ~~ ~'
n ~~` ~ ~ ~a~ w
ae
~
~
~ /0 /~ /~ ,
~ UFE ~ N wo ~'~
W S /
~2 ~ /
aZ l
~
~~~. p~r~, 1 4
1
_
aw ~-- ~ x
n 3 J ~ _ "~: e _ ~~
~ ra,~ ~ ,_ ~ a ~ + ~
U ~ --~
l r
~ ~ ~
~
, _ ~~
~
~
~ ~
~ ~ ~ ~5~
~ ~
/ll~l~~ ! ~~
~~
, ~
f
~ ~ 1
ll~~
~ ~ ~
i
o ~~ ~ ~~ ~~
~~
z >
t
~ ~ o
r I '1 ! 1~
~1 ~ ~ <~
_
ol
}
i ~ / ~ ~ , ~
ti ~ l
~
! ~
i /~
~ ~
~ ~^ ---
'
~
`
f
' ! ` ' ~1 I ;f ~ '
~ ~
s
} 4s
~ ~
r
I ~ ~
_
• ~
nr a ..... ~. -.... ..
-. ~ ^' ~ u. ~. x ~ Y.. ~.... '~ N"~O4W f4ViIWf N4"Y"T'TY~Y
mx virx w ~ ~ ~ ~
o ~~w ~, } u
~o~ o ~~ ~ ~ w ~~a
iL ~-~ QmaVO~W ~ a zmq OV W O zwy a~W.
~w~~ ~~~~~~~~ ~~~'~ ~~} o yw ~~ ~ zv~ ao
°~a~ ~~~uuauul!yy~r=g~µmµ~~ ~~ ua~c`~.~ O~ ~~ a ~ rzU ~zx~
~~m~ ~.erZOaZmO F ¢¢'' t7~~ Og V ~ ~ut~ DgON
µq, ZZ ~ ~ q z~ 5~ (,~ .eZ[ cC~? y
~~2m ~~Q QUO ~yO ~ .lam Z"[~i.j '~.(~ ~.~, 4.N ~ ~.'t~1 .~. W.~~S
t~y0gq Q.~ a~ZU~nln ~ ~~ ~Orq V~JF tu¢ ~ ~ q ~pw~
cn aa~z ~~~'yDOWVJ m ~O Q~~ Z~ ~Q ~~$ ~ ~~' ~Zd2.
~' mQ.W~v'~wIL a oz oo ~~ ~ Up w o ~ xaao
O O ~z~~ zvi~x ~?z " ~a a~¢m =Z' Oc~ ~ma ~n ~~w o~ Qa
_ ~ - r; vj O w vi
w O y ~ma o.-~
}Wm~w aa~'j~a~~U U ~>N ~~u~~ ~o ~ z owco'' d 3<~~ z~Ym.
>aN~ W W ~Qy4"Q~Z~w}K Jxi z J~~<a~ J w JO~ W ~~ N ZO~~ W g~..
jgwp~ ~~4~1-S. aU ~.~ va s~O ~oTa cd ~< ~ap m~q o ~N uTia }~Q6m x
fJlOVZ1Oaq [A LLNQ LL N a F-px W aa~
~aw0d~ ~~N ~OZy O aq~ ~r U ~ ~x xzoLL az Z7zY x ~
u>-UUZ ra,-zdOr~~w ~u9 ~aiµ~ d~~¢ O~ O f' m sn 3w ¢~8U Ora.
~-~F-~ U ~rU ¢r 3z U a Q-+~U U~ UF-y r~w v~ ~ur~ a~~~
O¢cnv ~ U 2a ~z 4~3 S2d <x0 w ~m Oaf
0.xm~'W~ ~~xx'~~~zqz~'~~ _ r- ~ppUw ~~ LLg~~- ~¢qv ~~ ~=WeZ~Uj a~}~
Z I^Q~aO aU W pdU~~~ Q~ }C. r~i~jZO QQ pZ 00. ti~.. wm' ~O a~ ~~Oq..
.- c~i _. ~ v W "t~~~~ Qa ~ tttt^JYYY l9 ~ ;p~: d `.,
~~f ~' ~~ ~ ~ ` ~ ~ ~ ~ ~
~.
.,,_._
o ~ ~ ~ ~ 1
~~ I~}11~f ~ 1, --
~.
\~• ~ ~ ~ Z ro
\ ar ~ ..~ ~ \ z z o
1 ..' ~~~C ~~ ~~ ~ ~ ~ ~~~
V
..
G 4 ~
w w 1
~ ~ 5 .
~
i ~
1
~ '
zU~°,
G V q ~ ~
~z~`~ `ate,
~ / ~ N ~
y
\
~
1
i
t
r
_oer7w.w~vew
~~ ~ ~ ~~Il ~ ~kj1
~ 1 l!~ill) ~
~ ~ ~~ ~~~
~~ ~ j~ ~~`~ ` ~
I i 1t ,~
I
tl
' ~, ~~I , ~ ipl'
~/ ~ r ,~ ~ 1
i
~ \\~ ! I~`
~~
~.}
C.
1 ~ 9 C/a t1!
d ~wu
9 ~ O
~ c ate. ~ ~ ~ ~ ~
0. = J a ~ E
a`
~ ~~R3
~ z
rr'. ~n' oa us?
sq: r,.. n: m:
~; m: ~, ~.
. .... ....: ........... .,. ....i......... _,...... .........,. ........ ...:.. ...__.._ ......_.. . .:....::i
~~~~~
n
a~
o a
z ~
~
5
LL N ~
~ w0
~. n. . ......................
~ ~
Q
~ w
3 U
a
Q ~ Ci of
iO iv II.
~ m
a 7
~~
J ~ O
N
~6
~iOm
u
~~ o ~ ~~
~~~-
S rte-. F-
4
N
~~ a
k
g ~ a
~~ a
y O a-~w
~r~ a
~
i
~ ti
}
N. Q¢~Q
KU ~ ~ o.-z
Zqs ro~
~~m }/~5
^)
li.l~
Z.
~:
.. ....~~..l.~
o ~ ....
~W
~
...w .w
O„
W
..a
`~
R'
J
~ a~?z
W siw ~~ r ~
~
-~
%r
W'z 3za
UO~ Sow
Ua w
~ d
w:
1 ~U :w in~~ ~?a
F
~
~~
\ ~
U V
~ N
Z
w
`
~ N
U ~
V a `
~ O=
f i~ll~ ,I)S'~' ~ ~ "~ ~ ~ U ~ .
( ~
x x ZZ q^ ;
~ i,\ .wit. .+. t` ~ m Oul i
Vm;
--ter - -=_=,~"_ =' , W ~
_, W
~ ~"` LL
p ~ 1
t~~ ~
~ ~Z W
~1 }
/zw ~~ ~ .
~" ; ~
~~ ~~ ~~
~ ~ a z w '. _o Q_ .._..._.. .._..,_ ..
w ~ ...
~ ~~ 3~ ~
R S q 0. ~
/ 7// j ~ ~ ~ o ~ ~ U
I W m LL
f I ~ ~~
~~~ t
~~~ ~~
~ ~~6r ~ ~ IU ~
~*0
1
w J
.
~ ~
/~ ~
,~
env
- •~_____
6 s t 9 $ ti, ~ Eon:
~ Z
Q
= U
1='
Q
V
a
~~
,~~~~
~~~
~~
8WL'LL Aa9
C7
w~
}~i ~ w
o ~ ~~
~~r~ ~ a
` ~~~~ ~ o ~~~ a~~
o~~~ ~~ ~ '~a~ ~ ~~
U W pp Z
z
cn o ~ ~ f-
~~a~ ~Q a Zoo a~~~
~'~'
} ~ ~ ~ U' ~ ~ ~ Q YYQ ~K ~ L w°N
«0`a~Z q~ m LL~W Z~m~ y~ ~ ~
pp aQ N y
HZZ~> NW 2 ANN F.~gZ ~;
QWga a2q X ,, ~ '«w s
w~UV2 i~ w >°.U WUa ~
~a~~~ W w ~WO p~y¢ ~~
a~awg ~P ~ ~~° aa>:aW
~q~~o ~~ ¢ ~~~ ~~d00.
'- tai ri .y vi
1 t ~.
\~~~~~~~ ~1~ ~~ i~ ~~ ~~
t ~ ~ 1 ` s. -~c""""
~ o
~ ~ ~~
~~ ~,
1~~~ 1 1 ~. ~ ~~~~~~ ~ ` ~
_..~.' // 1 ~ ~ ~ ,
~ ~~~~
~ ~
R ~ ~ ~~ ~ ~ I~II~ ~ 11~~ ~ ~ ~ `~ ~.
III~f~il ~ ~. 1i
I ~~ ~ \111+ II ~t ~-- ~, ~ t ,
/ ~ 111 X111. o ~ l I
1~
~, t
v1
,,
1 4
~i ~ ~.
r~
~ ~1
~~~i
°I~
I~
4
1 ~ s
t ~ j/
l ~ ~~z
1 ~? ! ~
~ w
1
a~
~~
~ c,
w ~?
d
z
Q~
s_
w~arwe+wwd~Pw
1 ~V
~~
~ ~~
~. ~_--
r---
~~ Sri
~
-~ ` ;w~
~,
~
1'
'
~~
; '",
M _t.~
118(ld
1
~{ ~
--•
OH.
G
_ ~
V`
$ ~
f
f
1
1.
~~
1 I 9 I 5 I 4
~ F- ~ Z
~gz
p ~>
~ z = ~
U
0~._
~~Q~~
~~ ~
(!}-~
O
c
Z
z
C7 ~
a
U
Z.
~ ~
O Z
I~-
U
8
~ ~ ~
~~~~.
~~
~
w ~
~~
~~
L
0.
~ ~
~_ Q
~zz W
amp '^'~ °z : ~ V
~0 ~~ Z~ ~
Ca ~
~
G
H
~ ~
w -
z
~'
~i
~i. W ~ O
~ W
~
o~
v~~ n~
~z~'
~$~ ~"
~~~~
a~
a
a
~ ~~~ ~ Q U
Q ~ Q F--
#~'
: EL ~
°
OO z~z z
za
~ Y ~
u°n~°°' p:
EC O F- q
~~
w_w
w°W Y
z~gz
m_
~ ~
a ~ > o ~
~ a
~_
~p
U ~~~
ono
~ ~ ~ ~~Z
~Ra~,
w o ~~
"~ ~
~~ ~ z ~ a
LJ Z
~~ ~w~~ ~~~a `w' ~
Z wd
<nc>
~ 5 aoa2
a. wF-w~
cv J za
~~Oa
qi fOl'
~
F
~~ ~ .,
~'
~ ~
fi`
` ~ e `
y °>~``
~`
,
''
,~ t
~
~
` 1 `` ~
,~`
^'
` ''`
~~ J
~~, ~
3
O
°
1
\
~ ~
~~
\ ~
~ ~
~ o z
~
~~ ,~
__ ~
~
~
~ ~ ~ ~
~ ~`-~ ~
~ Z
~
\ ~ ~~A ~ m B~', t ~ z _
'
` ~ o s
m m ~1 '`' s ~ ~~ \~~\ ~ ~ ~ ~ ~
1 \ 1 ~
~~/
~,
~~ - ~
~ // I ~ ;
~ ~~f
,
~
~ ~t
l
~~, ~ ~
i
~ _
//
le
\ ! ~
~
+~ ~l / r ~~I~~l > ~ ~ dal a
i.
/ _
c ~z ~
~'~o ~~ ,~ .~ 1» ~ Ili ~ ~- o ~ ~ ~ 1`
it 1~ 1
~~ , If ~1 1, ~ 11~ ~ ~
~ \~ I,1
~
$my z
~--mot ~
m ~J ~ 111 ~, °- ~> 1~ a
w ~ ~ 1 ti~ j
~ t
~ l
~~ ~~ ~
\ ~~
~~~ ~ y w
~
Q
t
~ ^
`
\
i~~.
14
~ ~
4
1
~ ~ ~ ~~ ~
~ ,
_ o l' ~_ _ ~ _
~ ~ LL
0
N~lf~ m
AA
~1:1A
:.
'`, .,,, ~,> ~,~ ,,/ ,
,
~.: e gel.. ~ ~~~~'a'''~~F'''''' Y
f, ~~ _ ~-
/
\ i ~ ~
~
~(
-~( , ~
r
fi ~ ~j ,,,r ~. ~ ~'a''s l
f"~
' ~ ~ ~ i ~ ~ .- _._ `~ -~ ~ ~ t
~
i ( ~~ i A ~ ~ ~ ° e
~ ~ ~
I
~ - ~ / ~I ~ ~~ ~ z ~
!
~
~ ~y
~„
~ / ~ ~
~ ~~ ~~~~~ ~ ~ wci
l ~~~
4 .
~ ~
~
t w ~ /~ > _
~
~ ~ ,sg
~: ~ ~ ~ ~
~
~ ~~
~
~ ~
~ , ~
~
~---
°°
m _
~
_ .
- r ~ ~ A ~
~- ~ a
,..~ -
,. ~
f14 6 8 l 9 G fr Eos-~rsc-azivw~ ~~A Z+,aar ais[rea - i~!va :i.
• ~ ~ ~ _ ~ - LLKIDS~4~906L•tL WS
~;oarwo. wa"~w
OL B B L B. S ti S Z `
z o ~ r. ~
~ DD ~ pp Z r~
o ~o~ a~ K~ a~ wRi t("irv ~ k~ ~ U
~ ~~ ~ ~~ aW~ oa ~D w
w~ W~ ~ow pw° t,oz ~N~~ oz °~ o° ~~xd' ``¢.,~F o a a
g2 in j~ o ~z^ zw~ vizgv> D zd~ ~~ ~`n u'SZ o w
~.O G~ ~~ ~6 q~~yp{~ 270. 40 ~ ¢O ~N. ~>D Q n
O -~.p C9 i--(7. ;fY 2v°Zt-~°.d ~`~Z~O ~U S. ~u~ ¢ 1- ~ .
~ ~d~ p7d ~y oy ov;°C`~a~~ ~°ou° ~~`a~,Q~ ~Q~~ ~~ p,
vi Z U(7 ~U' g~ Z.~ ~Z~OZOZ.U' U` 2~D2 D~~.d0 C3~.aa Jam, ~. J..
w w SZ Z "- DgwOOF-Z. z IILLLLLLI~~~III 1""' 0. F- QCCCa33S 0.*t. ~ '~
d pI w ~z z ~a Od ~~~~~~d~g m~92~o "`Q"''~$ gZ~~ w~ ~ ~ ~ o~
Z w o ~z ~ wJ ~ o ~ ~m wmU~'_ u. ~- a
~ z~ ZaJ F-O SO Drn ~DZ3] OD wid200w~a+ F-r-~ a F- O ~
u. d. 4 ¢ K F- ~ ~. ~ y F- ~ ~ t1 LL 0 ui ~ ~ p ~ T¢,. `n Z_ O ~ ~ y N ~t
m wo o~ urirz vi~ u'a¢°za~,wo ~~zc°7z~a ~n.ad oi~o°z ~N ~:3
°w a~ ~1~- ~~ oou an3~Wra ~ ~ [Q~~ ~~ °~`-' SwNmllLLUu m~
~'`~m ~°c~rd ~~gWg~ ~o~s~~~ w~noun..$i~iz~°~ DcFj~ ~d
z w m ~ ~~m_o_~ ;r oa ~ Dui m~v'a ° z ~ zm wa
~ ~~o o~o ~~D,~~o~<~ o°aY~a ~~ $~oz~~~o`~vs~?~; biz ~
~ ~ wP'.' (X~~F(~ ~W~>t,`~~pp'~iw~~iw7~° ~t"gu~~- c~wjZ Z~gUO~~f-sy oY°_•MC~q. F ~~yF+ ~K+
J ~CjOw lll~W~ Z~ w°D Z~6<QtafY°.Q VaOZ 2 i Z
_wW w w w¢ooa u~Gwwo F-of•-LY4<~~J~iS ~a'~ °~
° v>~nvt ~a,v, w u>r ~a...~UN~ZUVicn U y_C7.v~°wu u. m yaU ~ ~
".
,.....
0
a F3 =
'Pa¢
Vm~
Wz~ x h
~ ~ §L ~~~ a
~~~ ~ ~,
~~_ ~ z
w
° n, ~ N r- C~I i ~ O Q
~~ V n.~
~z ~ o~
~~ ~m ~ ~ ~• ~ ~ o
.:. .
i3 .. , tai ,c~ ... ::. ' ,,~ 1_T_/
i
v, ~ 5 ~ ~ w ~
NI f z ~~ ~" ~ 5 k~ Q a ~ Q
tai ; O °" w Z
b ~ ~ ~ U ~ ~:
~ ~
4~ ., ~
i
~~v
~;~
~*
~. ~ ~ '~~
~.,
r% ~t~
z ~ ~
~~ ~
Z
,z ~ ~ ~m~;
.. ~N Q. Q
DD ~ ~ u~l.~v. i% .v o ~ij
r ~ 9 ~ ~~ ''~ ~ ~~
m
-~.Z W ~ ZD V' Tt] ip
ym .~N h~1 ~7~y a iD TD to
W
:~~.jS o
wW 2
W O
~ Vl
~~ ~ ~
~ ~ ~.
^~ ~~
~~ ~ ~
>~ ~ ~~
~~~~
a a
d .~ d, 6
~ .'
~~ ~
_ ,.
~~
~p ~..
_~
° ~ ~Q x W ~ w
°~ ~ Q o ' ' w Q ~ ~~
F ~jj ~ ~ . `
0. Q Q
W
Q~, a
N II
~1, Z' '0..
- ., MxY .;
in 1~ ~
~ ~ I ~ ,.
' ~ ~ N, i
0 0
Z I; :a
~=W U
~~~ _
W~
G ~~~ >
4?-
~~K >
~;
~
r
~
~
$
f~
$
~
~
$
3
~
R
ffi
k
g
d ~
4
a
$~
y ' h N 0 .~. N N ~ Y b 1
~ O ^
. ~ Y r
,
Y
T ~ ~+ ~ ~ ~ p
h p
!~ [
~
Y p
Y Y
N pp
O pp
(O 1~ ee
r ~ p
O pp
G
P
b~
~ ~a
-~ ,~
;,~ ,~
~~ ~ A
~.
•
M
.+ ,
OL 8 _ s ,....., C 8" S b _ a+a~o~sLYOxivwS alq..q@'hOC~etf4zt-wwav
~`i~;e-ycoy'~Ymr~,
~ ,~
~
~ s ~ U
~ ,'
l ~ v ~
> °z ~
~.;
... .. V
W:
z
;d"
~
.
90~
~~
~
~
`~~o O
F'
~ . i
.,.3 D
oo
~ ~ ~ w
~~
~ ac
~
~2 waio
~ zm~ ~ ~
~ ° y~ vt
~<
~ ° ~UO ao,
Z p N~
' ~~, ~~
O ~~~
m.OY 5qq5~~
rj pZ~
Q
C ~~
3 ~ ~
1u o~~
yr 1. ~~ Z
Itt~TAililAili ~
~_ w
~ N
d
~} Z
W
~
~
~~ z.~x~
~wo~5
jF=-l17g ~~
tuO1u~~
.~OQ ~
~m~
~ d'c
n
z
~~~
~-'w
~ ~~~
w,z~ ~
m..~" ~
a
0. =
pp~U
Z~ _~
~`~`
wN ~~p
~Wu1`~~
T ~w
n.3ut
Y~J O o
Z
V .
p
~ Y'.~ .~~
m
~w ~ ~ .7 ~
~
`~ C7 J`n ?
~~
xQ' ~z
:
,.
Z
,~ W
~
Z ~Z
~~
O z
~t1~.~
OpUary
C9Z w ~Oxw
p~h-
~ m v
Jwf-
~¢m
~oiY m
O.
~-J~
~Ou~
2
~~ O
k
~ v~W
z_
viv¢ X00
wWow ~~J
IKOfX LLa0 mr-
stn [~
~w~
u.U a ~~
~c7
Ou. .~~
w~0a
~~ ;~
S Ocn ~~
mrL
tea.
O U
Z
ff1~.
4i Q vF,~
Qp
x z~~~
~u, OW
Zvi ~cCa
'O~W
22T
~ Wu~l~
j~v+
Jp _
Q~
~ 2 `~
p
~ Q~QaW ~colcnW
W u-ON >W v
LLw~ p ~S
~
~ ~ouW~
~u.Q
Ow Qo
wZ
wa
~ v~~X~
dQw W
p > ~
~w
t.,.
O ~
U d
z
~~' ~~~w
'~
0 ~
~S~ ~OV
~~2 m~Q
~~3 zzv, w
~~}ZU~ {y~ o
~ww w`~~
W~¢rz ~
~~ m~~2
~a~
~ ~¢
w ~~/,
'~~n ~-.
~~
SW.
0
: o
QU h.:
tt~
~
CL~~~:
h.~p."'.
~
dk
z
Opw
J
~~~ ~~~
a~
~ r
Z~<~ m~~
O~ ~
~ y~.
~
~
Z mF~
~00 ~~
d
?~ 4~
Viz}
~
~ ~m
w
~ ~..
4°
~~
I+
(f, . ~
~ µ~:
X Z w:.
O
p Z
S2
0
~:2 ~.
ZZ -p- _ F...
Ou1K ~~..Z
Z ~j...p.
~ ~.~•
Cj. {fn. p
p
~ uhf o. z ~j. W
w v
~a yO}
~ x...
w
~ 4
~ ~-.
~ ~y~
t
~'r~ ai. ,
~ ~.
~
[o~
~
.. '~qr .
~ l ~ ;i
~j/'
Q. ~O.
Ana p
uU~1l~Sta
O
~ ,
oc~i~ V
o
ewY$'4 in-
ta
n~i
: _
° ~
-
~~c~~ ~~ o
~ ~..
~~wav ~~ w
~~.u
pS
t~
+
Z o
Wv
¢~ '
U, 4,
Za
a
K
who Z
w<OZ K
C7~Vi
~ u
1
~~0~ vwiaK
vwi<Z
Iw-w W
C
I
~
Sc~ 1~
u
ice,
g
N
OJ
V
.l•
KAi
10
-.'. m
Oi.
:~. w
fq'
m
N
a
~ ~
~ 4> ~ ~.,
m
Z
m , ~' ww
~:~ 7 vw,
~~
~
:
.~,
y r
,p"~'. ~r ~w Z p a
~R: Q Z , O
,
• u.
o F ~
S
~ ~~~
~~ ~ N ~.
~
p• ~z,
n WI
u
1 -~
a z
I-- p
~
LL .
-
4
i-- w
.. Op ~"
m
Off,
'
11
o'
O ~
~d
~
~ ~
V
m~
~,
z _
,,..w,
„ ~ a
~ ~~ d tqv~
~ 2 ~ p 0.
~
., Z a O.,
~7 .~.. N wa ~ K
~ w. ~.
..
m m h _ t
y
t
A - I
O O $
.: ~
l ~ Z.U Z N
~ ~~ F
~~ ~ ~~ ~ c
w mq
~ F ~
~
Y ~ ~
~ w ~ a°
w
~- c.~
w
'~
~-.
~,~;~
~
w.F w
g
a ~~
m
z 3
~ `~.
w o
y- ~
7d"
0
w ~'
~ ~
~
~ ~ ~ •`.~ ~ ,. JJ
(y
~ a ~ IQr ~p
(, F
a
~ ''~
Z.
w
0.,
Q
W
-
~ ~,~
.,.
+
-
,
- //~~
A
,.
.. ,.. ;
~ ~ ,~ Ff
w I yF ~iV 1~\ a,
d
F
YI
d#
~
~
~ NVHl SS31
A' f
,
. ~
~
•^
O - g= _ 9 _ L ;9 5 Y £; Z t
z ~ ~
Z 4a,
w ~ I
~
h'~
' ,^
V! O
Q g
3q
3 G . ~µ ,
7[5
W ~
(J) ~
~ ~
ut~
W I
~
ad t1. M
~
z ~ ~
Y ~ ~
~ ~ ~'
Q
,. V
. ~
. ~
V?
~
~
a
~
_. ~ ~
,~
il. z
O
_:,
= U
il"
O o
>- Z
f -'
Y I l ~K
~.,"_
"` ,,~,
~~
~~~ ,~
i~~
_ ~ -
~~
:z ~
A
~,~ti g
d~,',~?j ~ .~$'
t310N33SmH .Z~,t, ~ zd~,a7 ;
a wnw~xvw o ~ ~ -~ ~ ~vi~~~~~ ~uu~tt
,NtnW1NIW.9 _ ~ ~ ~ ~ ~ v ~ ~
v ~ \. L~L~~ 2 W W {y
~y~y ~ \\ i;VOVT ~S W W
its ~~ n" `~`
. o~.o °x o- z ;LLB L~ ~~ ~ _ ~~` o~~~ti ~Z
~~ ~~ 'O ~~ ~'' ~~~ ~` ~' ~I ~:~` o w ~~~` Wei "_ ~.. c
n ~ ~ T ~~z z ~ a o ~
~~ ~ ~I=1-~ _~j,~~ iii .!{1~ ~ -~ ~ 3 t=- ~a~wo~Z w~ti~ ¢ ~~§
U o~ ~ ~ LLWL'!~' ~ ~ U' ~~~~~rW--~ a~o~ h~, v,
w 4_ v \ ~ o zo~d~ °~~ ~ Q ~ ~`~
_ __-
U lV~ldJ.l ~ ~~ ;~ \ ~ ~m~~7~~ ~w~~ ~ Q LL
0
L fv ~z 2y dll.9 ~-NIkY ~~~ {f1 ~~~~'~~~~~u~~z~ ~ ~~' ~~w~'-
F-x~~,°~,~'SSt~tippZaQp
~~.~
_ "; ~.~d'
~' ~ ~
a ~ ~~ a
Ot B $ ~ 9, ~ 4: .n«~~io-rsvszxv~svsr,oov~~stwz~ i~pd iau~ai