HomeMy WebLinkAbout20090838 Ver 1_Site Inspection_20111027 - e,�� �� ��
��� .
NCDENR � � � ('nr�
North Carolina Department of Environment and Natural Resources �Ci 3 f � ��;1�
Division of Water Quality D q�
Beverly Eaves Perdue Coleen H. Sullins ��DS�vsr�e��et ry
Governor Director
e�,y�y
October 27, 201 I
Mr. J. J. Swain,Jr., P.E.
Division 13 Engineer
N.C. Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Subject Inspection
DWQ Project 09-0838
TIP No. 4034
NC Highway 151
Buncombe County
Dear Mr. Swain:
On October 26, 2011, I inspected the construction work on TIP Project No. B-4034 on NC Highway 151 in
Buncombe Counry. ConsWction has been completed on the project and it appears to be in good shape.
Please ensure that all sediment and erosion control strucmres are maintained until grass is established on all
disturbed areas. Also, please refer to the attached inspection report for any specific items noted during the
inspection.
If you have questions,please call me at 828-296-4500. �
Sincerely,
��r e�ac�f� ��-�_
Michael R. Pazker
Environmental Senior Specialist
Attachment
ca Cole Hood, PE
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
CTransportation:P.ermitting Unit--S
Mike Parker, Asheville Regional Office
B-4034 NCSR Highway I51 October 20ll Inspection Letter
SURFACE WATER PROTECTION SECTION—Asheville Regional Offce
2090 U.S.70 Hghway,Swannanoa,NC 28778-8211
Phane:828�296-45001 FAX:828-299-7043 One
a5mme�seN��e:i-an.szs-s�aa NorthCarolina
Intemet www.nexatemualiN.om {� //� / /�
An EqualOpporlunirylAffrmativeAC(ion Employer ��" �" " �"�✓
. � .
DWO Site Visits for DOT Proiects
Field Sheet
DWQ representative: Michael R. Parker Date: October 26,201 I
County: Buncombe Region: Asheville
DOT Division: Division 13
Activity: X 401 Compliance Evaluation ❑ Complaint
❑DWQ Follow Up Evaluation ❑ Other
DWQ 401 #: 20090838 NW Permit#:� IP#: � .
Project Name: TIP No. B4034
Location of Project The projec[is located on NC Highway 15,approximately 1 mile past the Upper Hominy
Vol. Fire Departrnent.
Project Complete: ❑Yes X No If no, estimated date of completion: �
Activities(DOT): Water Oualitv Concerns (DWOI:
XD Bridge ❑ Steam Standards Violation
I XQ Culvert XQ Turbidity
� ❑ Bottomless Culvert ❑ Evidence of spills
❑ Bottomless Arch ❑ Oil/Petroleum
X� Riprap InledOutlet Stabilization ❑ Solid Waste
❑ Spoil Pile ❑ Failed E& S control measures�
❑ Borrow Pit X❑ Sedimentation Impacts
❑ Wetland Mitigation ❑ Stortnwater Permit Violation
❑ Stream Restoration ❑ Fitl
❑ On-site Stream Relocation ❑ Buffer Impacts (see below)
❑ Buffer Restoration ❑ Other
X❑ Bank Stabilization
X� Other Fill
Additional Wetiand lmpacts: ❑ yes ❑ no Estimated Acres �
❑Zone I Est Acres� ❑ Zone 2 Est Acres�
Additiona] Stream Impacts: ❑ yes X❑ no Est Linear feet�
Estimated linear feet of impact: � � �
Buffer Impacts: �Neuse QTar-Pam ❑Randleman ❑Catawba
Zone 1: ❑Yes ONo Est linear fr/acreage of buffer impact � ac
Zone 2: ❑Yes ❑No Est linear fr/acreage of buffer impact fU ac
Buffer Designation: ❑Exempt ❑Allowable ❑Allowable w/mitigation OProhibited
, . _
DWO Site,Visits for DOT Proiects
Bacicground Info
Name of Waterway(s): Stoney Fork Creek and an unnamed tributary to Stoney Fork Creek
Basin/Subbasin: FBR 040302
Wetland Type: ❑Isolated �Non-Isolated(Waters of US)
Stream Class: ❑Class B �303d Listed ❑WS-II ❑WS-V ❑SB
C❑ClassC ❑ORW X❑Trout ❑WS-III QNSW
❑HQW ❑WS-I ❑WS-N ❑SA QCA
Type of Authorized Impact X❑Cufvert ❑Bottomless Culvert
X❑Bridge ❑Bottomless Arch
X❑Riprap In1eU0utlet Stabilization ❑Fill
Authorized Wetland Impacts: ❑0— U10�'acre ❑Ul 1'"to 1/3`d acre
❑1/3`d to 1.0 acre ❑> 1.0 acre
Authorized Stream Impac[s: X❑< 150 linear feet X❑> 150 linear feet
Reviewed project on October 26,2011 and it appears to be complete.
Continue to maintain erosion control devices until grass is established on all disturbed areas.
B-4034 NC Highway I51 Inspection Report Ocrober 2011