Loading...
HomeMy WebLinkAbout20110879 Ver 1_More Info Letter_20111020AA wrr? NCDEE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 20, 2011 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Cert # 70110110 0000 9947 7593 Invenergy, LLC Jack Godshall 51 Monroe Street, Suite 1604 Rockville, MD 20850 DWQ Project # 11-0879 Beaufort County Subject Property: Pantego, Beaufort County, Invenergy Wind Energy Project Tar-Pamlico River Basin (TAR 07), Pungo River (29-34-(5), Pungo Creek (29-34-35), Broad Creek (29-10-(1) REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Godshall: On September 27, 2011, the Division of Water Quality (DWQ) received your application for to conduct stream determinations for construction of the Invenergy Wind Energy Project. After review of your application the DWQ has determined that your application is incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application and conduct stream determinations. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application. This project will be placed "on hold" as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project, Additional Information Requested: 1. Property Access It is necessary to provide this Office with verification for access to properties within the project area. DWQ staff cannot enter upon properties for stream determinations without first securing permission from property owners. North Carolina Division of Water Quality Internet: www.ncwaerquality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarohna An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Naturally Page 2 of 2 2. Map, Figure I, Sheet 3 Sheet 3 of Topo maps provided for stream determinations does not show roadways to turbine locations. It is necessary to show roadway used for turbine access. Temporary construction roadways should also be shown. Please respond within 30 days of the date of this letter by sending this information to me in writing at the DWQ Washington Regional Office. If we do not hear from you within 30 days, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Roberto Scheller of the Washington Regional Office at 252948-3917 if you have any questions regarding this matter. Sincerely, For Al Hodge Division of Water Quality Surface Water Protection Washington Regional Office cc: Zaneta Hough/Bob Kerr, Kerr Environmental Services 401 WBSCP Unit File Copy Filename: 11-0874