Loading...
HomeMy WebLinkAbout20110102 Ver 1_Approval Letter_20111011~~~ N~DENR North Carolina department o` Environment and Uatural Resources Division of Wu:er Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 1 I , 2011 Mr. Graham and Kim Shirley 115 West Morgan Street Raleigh, NC 27601 Subject Property: Shirley Residence, Raleigh UT to Crabtree Creek [030402, 27-33-(10), C, NSW] I)WQ Project # 2011-0102 County: Wake AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B .0233) Authorization Certificate- Modification Dear Mr. and Mrs. Shirley: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to impact approximately 37 ftZ of Zone 1 and 217 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the proposed retaining wall, concrete driveway steps and walkway at the subject property as described within your undated application dated received by the Division of Water Quality (DWQ) on January 31, 2011, with additional information received by DWQ on March 31, 2011 and October 06, 2011. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization replaces the authorization issued to you on Apri15, 2011. This authorization certification is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved (Units Plan Location or Reference Zone 1 Buffers 37 (s uare ft.) Plan Sheet dated 10-4-11 Zone 2 Buffers 217 (s uare ft.) Plan Sheet dated 10-4-11 2. Erosion & Sediment Control Practices Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) One 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 NorthCarolina Phone. 919-807-63001 FAX: 919-807-6494 Internet httpalportal.ncdenr.org/weblwglws ~R't~rR~~~ An Equal Opportunity 1 Affirmative Action Employer Sh; 'ley _ Page 2 ~ f 4 October 11, ~~I l Erosion and sediment control practices must be in gull compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 1 SA NCAC 2B .0233. 6. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fenc or stmt ar tg vtst t tty material) for the areas that have been approved to intiā€¢inge within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 7. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the WeBSCaPe Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Shirlr ~~~ Page 3 of 1 October 11, 20? . li. Died Notificat~uns Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at: http://portal. ncdenr.org/web/wq/swp/ws/401 /certsandpermits/apply/forms. The text of the sample deed notification iiiay be modified as appropriate to suit to this project. Any disputes over determinations regarding this Authorization (associated with the approved buffer impacts) shall be referred in writing to the Director within thirty (30) days of receipt of this notice for a decision. You can contest the Director's decision as provided in Articles 3 and 4 of G.S. 150B. To contest the Director's decision you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Fax: (919) 431-3100 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman at - or an c i an a - Sh.~ley , Page 4 ~ f 4 nctober 11, 201 1 Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USAGE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. CHS/kah/asc Enclosures: Certificate of Completion Sincerely, ~~ oleen H. Sullins ,~ cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office Robin Walsh, Liggett Design Group, 725-A Pershing Rd, Raleigh, NC 27608 File Copy Filename: 110102ShirleyResidence(Wake)NBR Mod