Loading...
HomeMy WebLinkAbout20010088 Ver 1_Other Agency Comments_20111024Permit Class Permit Number TRANSFER 44-01 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission D ~~ ~, ~~'~' ~ __. .. ~~~~L Via, f. I, for ~-ref vw,~~,~,, ,~~:i X Major Development in an Area of Environmental C~Slte~rxmr~ r~r,~y,,,~~ ~ , pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to GSM Properties, LLC., 8930 Hwy 39 South Zebulon, NC 27597 Authorizing development in Chowan County at Albemarle Sound, south side of SR 1119, Town of Edenton , as requested in the permittee's application dated 11/14/00, including attached workplan drawings (8), dated Sheets 1-7 of 7 all dated 10/30/00 and 1 dated 12/22/00. This permit, issued on flctnher 2~, 2(111 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Easement 1) Prior to construction of any new boat slips or other docking facilities outside of the high ground basin authorized under this permit, the permittee must apply for and receive an Easement from the Department of Administration's State Property Office as required under N.C.G.S. 146-12(e). Breakwater 2) The breakwater shall be aligned as shown on the attached workplan drawings. 3) The permitted breakwater must be constructed of treated wood plastic lumber, metal sheet piles or other suitable materials approved by the Department personnel. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case maybe. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. (.l ~ ~"" 1 ~~ ~'-, M. Ted Tyndall, Asti tant Director ~,.'-~ Division of Coastal Management This permit and its conditions are hereby accepted. December 31, 2014 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee GS1vI Properties, LLC. ADDITIONAL CONDITIONS Permit # 4-1-01 Page 2 of 6 4) The breakwater shall be constructed with an equal gap between each sheathing board totaling at least one inch of open area for every linear foot of breakwater. The breakwater shall have at least one, five foot opening at every 100 feet. 5) This permit authorizes no backfilling of the breakwater, estuarine waters or public trust areas. 6) The permittee shall maintain the breakwater in good condition and in conformance with the terms and conditions of this permit or the remaining breakwater structure shall be removed within 90 days of notification from the Division of Coastal Management. Excavation 7) No excavation will take place until the construction of the permitted breakwater is complete. 8) A silt screen shall be left between the area to be excavated and Albemarle Sound and a 24 hour period after completion of excavation will elapse prior to removal of the silt screen to prevent unnecessary siltation into the adjacent water body. 9) Excavation will not exceed -8 feet below the normal water level. 10) In no case shall excavation exceed the depth of connecting waters. 11) No vegetated wetlands will be excavated or filled. 12) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. Soil Disposal 13) The spoil disposal area must be inspected and approved by a representative of the Division of Coastal Management prior to the commencement of any dredging activities. 14) All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 15) No spoil material is to be placed within 30 feet of the normal water level contour, except that which may be used to backfill the area behind the permitted bulkhead. 16) The disposal area will be constructed a sufficient distance from the mean high water level or any marsh to eliminate the possibility of dike erosion into surrounding wetlands or waters. 17) The disposal area and all disturbed areas will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. r GSM Properties, LLC.. ADDITIONAL CONDITIONS Permit # 44-01 Page 3 of 6 18) The permitted bulkhead within the basin area shall be aligned and constructed as shown on the attached workplan drawings. 19) The bulkhead must be constructed prior to any backfilling activities. 20) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 21) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. 22) The backfill material will be clean and free of any pollutants except in trace quantities, and will be confined behind the permitted bulkhead. Docking Facility 23) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 24) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 25) Except where a written waiver of the 15 foot riparian corridor setback has been received, the piers, platforms and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 26) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. 27) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 28) The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 29) This permit authorizes a maximum often boat slips. GSM Properties, LLC. ADDITIONAL CONDITIONS Permit # 44-01 Page 4 of 6 NOTE: Anv proposal to add one or more additional boat slips to the authorized 10 slip facility will require that the docking facility be classified as a marina, and will therefore require a review under the N.C. Environmental Policy Act (NCEPA). Travel Lift 30) The permitted travel lift shall be constructed in strict accordance with the attached workplan drawings. Boat Ramp 31) The pernitted boat ramp shall be constructed in strict accordance with the attached workplan drawings. 32) The concrete boat ramp must be poured on high ground and pushed or placed into the water. No live concrete may come into contact with the water. 33) The ramp shall not exceed a width of 18 feet and shall not extend further than 56 feet waterward of the normal high water contour. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan may be required for this project. If required, this plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. The permitee is urged to contact the Department of Environment and Natural Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889 to determine the need for submittal of the plan. 34) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. 35) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). Stormwater Management 36) The Division of Water Quality approved this project under stormwater management rules of the Environmental Management Commission under Stormwater Permit No. SW7010108 on 3/30/01. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. J. Scott Harrell, Jr. ADDITIONAL CONDITIONS General Permit # 4-1-01 Page 5 of 6 37) All material resulting from the removal of the 40 foot long section of the existing breakwater shall be placed on an approved upland site. 38) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 39) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage or injury to the authorized structure or work which may be caused from existing or future operations undertaken by the United States in the public interest. 40) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 41) The permitted activity will be conducted in such a manner as to prevent a significant increase in turbidity outside of the area of construction or construction-related discharge. Increases such that the turbidity in the waterbody is 25 NTU's or less in all saltwater classes are not considered significant. NOTE: Any development or land disturbing activity that is considered non-water dependent is not authorized within 30 feet of the normal high water level unless specifically exempted by Coastal Resource Commission (CRC) regulations in place at the time of such development. NOTE: Should either adjacent property be sold prior to the initiation of construction, the permittee shall be required to obtain a signed riparian corridor waiver from the new property owner prior to the placement of any structures within the 15 foot riparian corridor. NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. J. Scott Harrell, Jr. ADDITIONAL CONDITIOI'S Permit # 44-01 Page 6 of 6 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (2~2) 264-3901 prior to the commencement of any such activity for this determination. NOTE: The permittee is advised that this is a mosquito breeding area. Construction plans and operations should include an awareness of this. The permittee is urged to contact the Public Health Pest Management at (252) 726-8970 to arrange for a site visit or to obtain information to help prevent the creation of more mosquito habitat. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3274 (DWQ Project No. 010088), which was issued on 3/12/01. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. 200110366.