October 17, 2011
Mr. J. B. Setzer, P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Subject: Inspection
NCSR 1783 Upward Road
DWQ Project 08-1327
TIP No. R-4430
Henderson County
Dear Mr. Setzer:
On October 6, 2011, 1 inspected the construction work on Upward Road between US Highway 176 and
Howard Gap Road in Henderson County. Construction work is continuing all along Upward Road between
Howard Gap Road and US Highway 176.
Please ensure that all sediment and erosion control structures are being maintained as required and that seeding
and mulching are being performed as needed, to protect State surface waters.
Please refer to the attached copy of the inspection report for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
Upward Road R-4430 Inspection Letter October 2011
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-45001 FAX: 828-299-7043
Customer Service: 1-877-623.6748
Internet: www.nmatemuartv.ora
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
-4,
DWO Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: October 6, 2011
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 08-1327 NW Permit #: 13, 12, 14 Ip #:
Project Name:
Location of Project:
Upward Road Widening Project R-4430
Upward Road (NCSR 1783) between US Highway 176 and Howard Gap Road
Project Complete: ?Yes X No
XU Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
If no, estimated date of completion: I I
Steam Standards Violation
] Turbidity
Evidence of spills
Oil/Petroleum
Solid Waste
Failed E & S control measures
] Sedimentation Impacts
Stormwater Permit Violation
] Fill
Buffer Impacts (see below)
Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited
I° . ?-
Name of Waterway(s):
DWO Site Visits for DOT Projects
Background Info
Bat Fork Creek and tributaries, tributary to Dunn Creek and tributaries
to King Creek
Basin/ Subbasin: French Broad 040302
Wetland Type: []Isolated x?Non-Isolated (Waters of US)
Stream Class: []Class B ?303d Listed ?WS-II ?WS-V ?SB
X?Class C ?ORW []Trout ?WS-III []NSW
?HQW ?WS-I [-1WS-N ?SA ?CA
Type of Authorized Impact: X?Culvert
[]Bridge
X?Riprap Inlet/Ol
Authorized Wetland Impacts: X?0 - 1/10'h acre
?1/3`d to 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet
Additional comments:
[]Bottomless Culvert
[]Bottomless Arch
ltlet Stabilization X?Fill
?1/I l b to 1/3`d acre 0.1 acre
?> 1.0 acre
X?> 150 linear feet 891 linear feet
1. Reviewed project with DOT staff and Blythe Development personnel. Construction is underway all along the
project. Temporary bridge has been installed across Interstate 26.
2. New 48° RCP pipe at Sta. 24+00 has been installed and stream diverted. Banks on both sides of the pipe need
to be seeded, mulched and matted.
3. Grade, seed and mulch area at Sta. 28+00.
4. Seed and mulch shoulders and slopes at Station 62+00 to 66+10.
5. Seed, mulch and mat inlet of 48 inch RCP at Sta. 80+00.
6. Continue to maintain all sediment and erosion control devices and seed, mulch and matt all disturbed areas
when needed to protect State surface waters. Remember that cold weather is fastly approaching and that
seeding and matting should be performed with that in mind.
Upward Road R-4430 Inspection October 2011