Loading...
HomeMy WebLinkAbout20072056 Ver 1_Certification of Completion_20111018\O?CF WAI'F9oG Michael F. Easley, Governor /1 r William G. Ross Jr., Secretary 0l North Carolina Department of Environment and Natural Resources r7 Coleen Sullins, Director j Division of Water Quality Q Y DWQ Project No.: Z0072o56 Applicant: iVC PoT f71 V . County: 6anvNe Project Name: SR l40 / ('Rook Brbo% reoae) Date of Issuance of 401 Water Quality Certification: 12- I cf'107 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, T- k/. L3Qw?-h I P. E. hereby state that, to the best of my.abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: J• Date: q?Z6f II Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final q as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Registration No. 144(0? 1'.., Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carofna 27604 Phone: 919-733-1786 / FAX 919-733-6893; Internet: htto7//h2o enr state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 506NRecycled110% Post Consumer Paper