Loading...
HomeMy WebLinkAbout20110596 Ver 1_Email_20111011F W: Pre-Construction Meeting Bridge 944, Hyde County Page 1 of 2 FW: Pre-Construction Meeting Bridge #44, Hyde County Ward, Garcy Sent: Tuesday, October 11, 20112:00 PM To: Carrillo, Sonia Attachments: Precon Lettencloc (109 KB) Sonia- pre-con letter for 11-0596. E-mail correspondence to and form this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Mebane, Charles S Sent: Monday, October 03, 2011 2:27 PM To: Mark Perkins Cc: Capehart, Bob; Baker, Sterling D; Lee, Darrick S; Abel, John S; Bracy, Anthony R; Brown, Tracey T; Willis, Thomas C; Blankenship, Andrew; Long, Maria M; Bunn, Eddie J; Whitley, Casey K; Biddlecome, William J SAW (William.J.Biddlecome@usace.army.mil); Ward, Garcy; Lane, Stephen; Lipscomb, Sharon M; Leggett, Brian E; Taylor, Rhonda D Subject: Pre-Construction Meeting Bridge #44, Hyde County Mark, Please see the attached letter. Thanks, Shawn -----Original Message----- From: Mark Perkins [mailto:mperkins@taloving.com] Sent: Friday, September 30, 2011 10:32 AM To: Mebane, Charles S Cc: Stephen Salter Subject: RE: Bridge #44, Hyde County Thanks Shawn for all your assistance. Hopefully we can have the meeting very soon and not delay the beginning of construction. Mark Perkins Project Manager/Estimator T A Loving Company Utility/Heavy Civil 919.580.8559 cell 919.734.8400 office mperkins@taloving.com -----Original Message----- From: Mebane, Charles S [mailto:cmebane@ncdot.gov] Sent: Friday, September 30, 2011 8:35 AM To: Mark Perkins Cc: Leggett, Brian E Subject: FW: Bridge #44, Hyde County Mark, I forwarded your request for the preconstruction meeting to all concerned yesterday. I will let you know early next week when the meeting will be held. We have to give the agency people at least two weeks to see if they can attend. You can go ahead and https://mail.nc.gov/owa/?ae=ltem&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJH14°/u2b... 10/12/2011 FW: Pre-Construction Meeting Bridge #44, Hyde County Page 2 of 2 plan to close the road/bridge on Monday October 10th and begin mobilizing equipment. There just cannot be any work done until the preconstruction meeting is held. Thanks, Shawn -----Original Message----- From: Mark Perkins [mailto:mperkins@taloving.comI Sent: Thursday, September 29, 2011 4:21 PM To: Mebane, Charles S Subject: Bridge #44, Hyde County Mr. Shawn, Please find attached "Road Closure Notice" and "Bridge Removal Letter" to be mailed tomorrow. Thanks Mark Perkins Project Manager/Estimator T A Loving Company Utility/Heavy Civil 919.580.8559 cell 919.734.8400 office mperkins@taloving.com -----Original Message----- From: Xerox_Utility@taloving.com [mailto:Xerox Utility@taloving.coml Sent: Thursday, September 29, 2011 3:45 PM To: Mark Perkins Subject: Scanned from a Xerox multifunction device Originals Please open the attached document. It was scanned and sent to you using a Xerox multifunction device. Attachment File Type: pdf multifunction device Location: machine location not set Device Name: XRXOOOOAAD39BO7 For more information on Xerox products and solutions, please visit http://www.xerox.com Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. https:Hmail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJHI4°/`2b... 10/12/2011 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR October 3, 2011 Contract ID: DA001 14 WBS No.: IC.048059 County: Hyde Location: Replacement of Bridge #44 over Allison Creek on SR 1 147 Mr. Mark Perkins T. A. Loving Company P. O. Drawer 919 Goldsboro, NC 27533 Dear Mr. Perkins: EUGENE A. CONTI, JR. SECRETARY This serves to confirm the Preconstruction Conference for the above referenced project scheduled for Thursday, October 13, 2011, at 9:00 A.M. in the Williamston Construction Office, located at 19210 US Highway 64E Williamston, NC. A proposed Progress Schedule shall be submitted to the Department no later than seven (7) days prior to the date of the project preconstruction conference (received) and shall be approved before any payments will be processed for the project. In addition, the following information should be submitted to the Department at the Preconstruction Conference: • Detailed Construction Schedule (Received) • List of Project Personnel (i.e. Project Manager, Project Superintendent, Traffic Control Coordinator, Erosion Control Coordinator, EEO Coordinator, etc.) (Received) • List of Material Suppliers (Received) • List of Subcontractors (Received) • List of Company Officials Authorized to Execute Supplemental Agreements (Received) It is requested that you invite any proposed subcontractors deemed necessary. By copy of this letter, I am inviting various Department representatives having involvement and/or interest in this project. Should you require additional information on this matter, please contact this office at (252) 792-0347. 19210 U.S. Hwy. 64 East, Williamston, NC 27892, Phone (252)792-0347; Fax (252)792-0539 T. A. Loving Company October 3, 2011 Page 2 Sincerely, Shawn Mebane, PE Resident Engineer cc: Mr. Ron Hancock, P.E. - State Construction Engineer Mr. Jerry Jennings, P.E. - Division Engineer Mr. Bob Capehart, P.E. - Division Construction Engineer Mr. Sterling Baker, P.E. - Division Maintenance Engineer Mr. Darrick Lee, P.E. - District Engineer Mr. John Abel - Division Bridge Project Manager Mr. Tony Bracy - Division QA Lab Supervisor Ms. Tracey Brown - Right of Way Agent Mr. Clay Willis - Division Environmental Officer Mr. Mr. Chad Edge, 111, PE Division Traffic Engineer Mr. Andy Blankenship,-PE - Roadside Environmental Field Operations Engineer Mr. Christopher Peoples, PE - State Materials Engineer Mr. Keith Brown - Section Materials Specialist Mr. Eddie Bunn, PE - Bridge Construction Engineer Mr. David A. Jackson - Pavement Construction Specialist Mr. Charles W. Brown, PE, PLS - State Location & Surveys Engineer Mr. Casey Whitley - Location & Surveys Locating Engineer Mr. Bill Biddlecome - US Army Corps of Engineers (Washington) Mr. Stephen Lane -NCDENR, CAMA (Washington) Mr. Garcy Ward -NCDENR, Water Quality Section (Washington) Ms. Sharon Lipscomb - VI/EO Contract Compliance Manager Ms. Mazie Smith - Hyde County Manager 19210 U. S. Hwy. 64 East, Williamston, NC 27892 Phone (252)792-0347 ; Fax (252)792-0539