Loading...
HomeMy WebLinkAbout20110924 Ver 1_Application_2011101813 NO 3 I,u 4. F W A, o go oc y T1 '4 L°)1? l/, 10924 Office Use Only: Corps action ID no. DWQ project no. Farm Version 1.3 Dec 10 2008 Pr e-Construction Notification PC Form A. Applicant Information 1. Processing I a. Type(s) of approval sought fro Corps: non-reporting the I ®Saction 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NM ) number. NWP 3 and 13 or General Permit (GP) number: 1c. Has the NWP or GP number be en verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from ® 401 Water Quality Certificati ? 401 Water Quality Certificati the DWQ (check all that apply): on - Regular ? Non-404 Jurisdictional General Permit r on -Express ? Riparian Buffer Authorization le. Is this'not'fiication solely for the because written approval is not record required? For the record only for DWQ 401 Certifi Ye ? No For the record only for Corps Permit: I oyes ? No If. Is payment into a mitigation bar of impacts? If so, attach the ac fee program. k or in-lieu fee program proposed for mitigation ceptance letter from mitigation bank or in-lieu ? Yes ® No 1g. Is the project located in any of below. C's twenty coastal counties. If yes, answer lh ? Yes ® No 1 h. Is the project located within a N DCM Area of Environmental Concern (AEC)? ? Yes ®No 2. Project Information 2a. Name of project: Proposed repair of a cross line conveying Lynch Creek on SR 1548 (Peter Gill Road) 2b. County: Vance 2c. Nearest municipality / town: Henderson 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information or 71, 3a. Name(s) on Recorded Deed: NCDOT Division 5 8 3b. Deed Book and Page No. N/A S qt 8q Fq 3c. Responsible Party (for LLC if applicable): UWq iry N/A TEq 3d. Street address: 2612 N. Duke Street 3e. City, state, zip: Durham, NC 27704 3f. Telephone no.: (919)220-4600 3g. Fax no.: (919)560-3371 3h. Email address: wbowman(dincdot.aov 4. Applicant Information (if diffe ent from owner) N/A 5. Agent/Consultant Information (If applicable) N/A Page 1 of 8 , PCN Form -Version 1.3 December 10, 2008 Version i B. Project Information and Pri or Project History 1. Property Identification I a. Property identification no. (tax IN or parcel ID): N/A 1b. Coordinates (in decimal degref s): Site: Latitude:36.26538 I Longitude: -78.40269 (DD.DDODDD) (-DD. DDDDDD) 1c. Property size: < 0.01 acres i 2 Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Lynch Creek 2b. Water Quality Classification of nearest receiving water. C NSW 2c. River basin: Tar-Pamlico 3. Project Description 38. Describe the existing condition on the site and the general land use in the vicinity of the project at the time of this application: The existing structure has sepa rated end joints to the inlet and outlet ends. The associated shoulder and fill slopes have failed. Site is surrounded by wo oded and commercial lands. 3b. List the total estimated acreage of all existing wetlands on the property: NONE 3c. List the total estimated linear fee t of all existing streams (intermittent and perennial) on the property: 60 It 3d. Explain the purpose of the posed project: The pipe repair will allow for an adequate and more stable shoulder sections and fill slopes at this sling. 3e. Describe the overall project In tail, including the type of equipment to be used: Separated end joints will be re at both the inlet and outlet of this structure. The area will then be beck filled to provide an adequate slope section. Ri rap will be installed underlined with filter fabric for lorig tern stability surrounding the pipe ends. E ui ment may include backhoe an excavator, and grader. 4. Jurisdictional Determination 4a. Have jurisdictional wetland or ream determinations by the Corps or State been requested project (including all prior ph r obtained for this property / s) in the past? ? Yes ® No; ? Unknown Comments: N/A 4b. If the Corps made the jurisdicti net determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisd ctional areas? Agency/Consultant c?mpany: N/A Name (if known): WA Other: N/A 4d. If yes, list the dates of the Corp jurisdictional determinations or State determinations and attach documentation. WA 6. Project History 5a. Have permits or certifications be this project (including all prior an requested or obtained for ases) in the past? Yes ®No ? Unknown 5b. If yes, explain in detail acoordin to 'help file' instructions. WA I, Page 2 of 8 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. i N/A C. Proposed Impacts inventor 1. Impacts Summary Is. Which sections were completed below for your project (check all that apply): ? Wetlands ® Strea is - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts propo on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland Impact Type of jurisdiction number- Type of i act Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWO -;non-404, other) (acres) Temporary W1 ? P ? T WA N/A ? Yes ? No ? Corps, ? DWQ ' WA 2g. Total Wetland Impacts: NONE 2h. Comments: WA 3. Stream Impacts If there are perennial or Intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacte d. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of imp kct Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps! 404, 10 stream length Permanent (P) or intermittent DWO -non-404, width (linear Temporary M (INT)? other) (feet) feet) Site 1 ® P ? T Stream 1 rip rep UT Lynch Creek ® PER ? INT ® Corps: ® DWQ 2 10 Site 1 ? P ® T dewatedri UT Lynch Creek ® PER ® Corps' 2 35 Stream 1 ? INT ® DWQ i - L 3h. Total stream and tributary Impacts 35 3i. Comments: rip rap will be placed on banks (up to 5ft upstream and downstream), not within the flow line 4. Open Water Impacts If there are proposed impacts to lak is, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then Individual list all ope n water impacts below. 4s. 4b. 4c. 4d. 4e. Open water impact Name of wat body number - (if applica e) Type of impact Waterbgdy type Area of impact (acres) Permanent (P) or Temporary Ot ? P ? T WA N/A WA WA 4f. Total open water Impacts NONE 4g. Comments: WA Page 3 of 8 PCN Form -Version 1.3 December 10, 2008 Version j 5. Pond or lake Construction If and or lake construction ro d, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purp ose of Wetland Impacts (acres) Stream Impacts (feet) Upland number (acres) pond Flooded Filled Excavated Flooded : Filled Excavated Flooded P1 N/A WA WA WA WA i N/A WA WA P2 5f. otal NONE NONE NONE NONE NONE NONE NONE 5g. Comments: WA 5h. Is a dam high hazard permit rec uired? ? Yes ® No If yes, permit ID no: N/A Si. Expected pond surface area (a ): WA 5j. Size of pond watershed (acres N/A 5k. Method of construction: WA 6. Buffer Impacts (for DWG) If project will impact a protected ripa rian buffer, then complete the chart below. If yes, than individually list all buffer impacts below. If an impacts require iti 'on, then ou MUST fill out Section D of this form. 6a. ® Nauss ? Tar-Pamlico ? Other. Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 69. Buffer impact number - Reason for Buffer Zone l impact Zone 2 impact Permanent (P) or impact Stream name mitigation (square feet) (square feet) Temporary required? Site ? P ? T ? Yes Buffer Impact 1 WA WA ? No N(A WA i 6h. Total buffer Impacts WA WA 6i. Comments: project site is within ar-Pamlico, but work to be done within existing transportation facility. D. Impact Justification and MItIga tion 1. Avoidance and Minimization la. Specifically describe mess res taken to avoid or minimize the proposed impacts in designing project The impacts to the stream are mini . at and to maintain a dry work area if necessary and to armor the repaired pipe ends. This repair cannot be performed without tream impacts. 1b. Specifically describe mess res taken to avoid or minimize the proposed impacts through constriction techniques. Sediment and erosion control Best anagement Practices for protection of surface waters and riparian buffers will be enforced during project construction I Version 1.3 December 10, 2008 Version 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Cam impacts to Waters of the U.S. o nsatory Mitigation for r Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): i ? DWQ ? Corps, 2c. If yes, which mitigation option w ill be used for this project? ? Mitigation bank [I Payment to in-lieu fee program i ? Permittee Responsible Mitigation 3. Complete H Using a Mitigatio n Bank 3a. Name of Mitigation Bank: WA 3b. Credits Purchased (attach racer t and letter) Type WA Quantity WA 3c. Comments: N/A 4. Compote M Making a Paymen t to Inaleu Fee Program 4a. Approval letter from in4ieu fee p rogram is attached. ? Yes 4b. Stream mitigation requested: WA linear feet 4c. If using stream mitigation, strea temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (D Q only): WA square feet, 4e. Riparian wetland mitigation req ed: N/A acres 4f. Non-riparian wetland mitigation uealed: N/A acres 4g. Coastal (tidal) wetland mitigati requested: N/A acres 4h. Comments: WA 6. Complete If Using a Permttlee Responsible Mitigation Plan Sa. If using a permitiee responsible NIA mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regu ated Riparian Buffer Rules) -required by DWQ i 6a. Will the project result in an impa buffer mitigation? ct within a protected riparian buffer that requires ? Yes ® No 6b. If yes, then Identify the square f amount of mitigation required. eet of impact to each zone of the riparian buffer that requires mitigation. Calculate the Zone 6c. Reason for imps 6d. Total Impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 NIA N/A 3 (2 for Catawba) WA Zone 2 NIA N/A 1.5 NIA 6f. Total buffer mitigation required: NONE 6g. If buffer mitigation is required, permittee responsible riparian buffo iscuss what type of mitigation is proposed (e.g., payment to private mitigation bank, restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page 5 of 8 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is i i i adjacent to protected riparian buffers identified ® Yes ? No w th n one of the NC Riparian uffer Protection Rules? 1b. If yes, then is a diffuse flow pla n included? If no, explain why. Comments: this pipe extension will not alter storm water runoff at this site I ? Yes ® No 2. Storinwater Management Pla n 2a. What is the overall percent imp erviousness of this project? 20 % 2b. Does this project require a St water Management Plan? j ? Yes ED No 2c. If this project DOES NOT requi a Stormwater Management Plan, explain why: NCDOT state Permit No. NCS000250 2d. If this project DOES require a mrwater Management Plan, then provide a brief, narrative description of the plan: N/A ? Cerfified Local Govemment 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government S tormwater Review 3a. In which local government's juri iction is this project? Vance County ? Phase II 3b. Which of the following locally-i mplemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater M anagement Plan with proof of approval been ? Yes ? No attached? N/A 4. DWQ Stomrwater Program Rom riew ? Coastal counties 4a. Which of the following state-i lamented stormwater management programs apply ? HQW ? ORW (check all that apply): WA ? Session Law 2008-246 ? Other. 4b. Has the approved Stormwater nagement Plan with proof of approval been attached? N/A ? Yes ? No b. DWQ 401 Unit Stormwater Rev iew 5a. Does the Stormwater Managem ent Plan meet the appropriate requirements? N/A ? Yes ? No 5b. Have all of the 401 Unit submitt I requirements been met? N/A ? Yes ? No Page 6 of 8 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentati on (DWQ Requirement) 1a. Does the project involve an ex penditure of public (federaYstate/local) funds or the ®Yes ? No use of public (federaYstate) lar d? 1b. If you answered °yes'to the a ove, does the project require preparation of an environmental document purl ant to the requirements of the National or State ? Yes ® No (North Carolina) Environments Policy Act (NEPA/SEPA)? tc. If you answered 'yes" to the a ve, has the document review been finalized by the State Clearing House? (If so, ch a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: WA 2. Violations (DWQ Requireme t) 2a. Is the site in violation of DWQ % etland Rules (15A NCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A CAC 2B .0200)? 2b. Is this an after-the-fact permit plication? ? Yes ® No 2c. If you answered yes' to one o both of the above questions, provide an explanation o f the violation(s): WA 3. Cumulative Impacts (DWQ R ulrement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes No additional development, which Id impact nearby downstream water quality? 3b. If you answered "yes' to the a ve, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered 'no,' provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requ irement) 4a. Clearly detail the ultimate treatm ent methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or avail Is capacity of the subject facility. WA of 8 :N Form - Version 1.3 December 10, 2008 Version S. Endangered Species and De ;lgnated Critical Habitat (Corps Requirement) 5a. Will this project occur in or n an area with federally protected s peCies or habitat? E3 Yes ® No 5b. Have you checked with the US i S concerning Endangered Species Ad ? Y s mpacts? e ® No 5c. If yes, indicate the USFWS Fe d Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? htt:/ /nc-es/ s/co n r.html and NC Natural Heritage Program Database, Element Occurrences 8- Essential Fish Habitat (Corps Requirement) ea. Will this project occur in or near an area designated as essential fish habitat? ? Yes No Bb. What data sources did you use to determine whether your site would impact Essentiah Fish Habitat? h ://ocea .fl ri a a' .or / coraUms/viewer.htm 7. Historic or Prehistoric Cultu I Resources (Corps Requirement) 7s. Will this project occur in or naa an area that the state, federal or tribal governments have designated status (e.g., National Historic T s having historic or cultural preservation st designation or properties significant in ? Yes ® No North Carolina history and arch ieology)? 7b. What data sources did you use o determine whether your site would impact historic or archeological resources? HPO's historic layer using GIS rcView database and http:ltqis.ncder.gov/hi)oweb/ 8. Flood Zone Designation (Corps Requirement) I 8a. Will this project occur in a FE -designated 100-year floodpiain? ? Yes ® No i 8b. If yes, explain how project meets FEMA requirements: N/A i 8c. What source(s) did you use to m ke the floodplain determination? htto //www ncflood s cem/ J. W. Bowman, P.E. ?1/ 10/14111 ApplicantlAgenfs Printed Name Applicard/Agenirs Signatu + Date ftenrs s4uture Is vaad orgy It an aurwizason I born to aDDflnra ersion 1.3 December 10, 2008 Version rfP/R0,j - - EDP EDP 1 I SOP [? 0P ??'dCW4?n?(? B2? - QfA Zane Any Row i ETF CK s?? ?va?sp=v faci ?; N I: ID scaly, sr ISO Pel?{ G,ii ?d P tite 3 Du8 ' 13 Uoin:.n«f 11) N it t > }.: ?° v`? ?v "'f#S F ? p r 5R 548 PeJ? 6. u vayktR RwL 2