HomeMy WebLinkAbout20110892 Ver 1_Application_20111004 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR September 27, 2011 ST EUGENE A. CONTI, At' SECRETARY Mr. Rob Ridings 1 ® 8 9 n DWQ-Transportation Permitting Unit G 1650 Mail Service Center Raleigh, NC 27609 Subject: Nationwide 14 Notification for the paving of SR 1443 (Roy Court) over a UT to Town Creek, Wilson County, NC. WBS # 4x096029 Dear Sirs: Please find enclosed the Pre-Construction Notification for the above referenced project. There are impacts to one regulated stream associated with this project due lengthening one pipe by 5'. This UT to Spring branch is located in the Tar River Basin and is classified by the Division of Water Quality at this crossing as C, NSW. Best Management Practices for the Protection of Surface Waters will be strictly adhered to during construction. Regulatory Approval: USACE Section 404 Permit: The project qualifies for Nationwide Permit 14 (Nonreporting). All permit conditions will be followed. NCDWQ Section 401 Certification: The project qualifies for 401 General Certification No. 3820. For our files, please provide written authorization that the activity is authorized. NCDWQ Buffer Rules: Buffer rules apply as feature shows up on soils map. For our files, please provide written authorization that the activity is authorized. Please contact Chad Coggins (252) 296-3532 or Byron Bateman at (252) 296-3530 if you have any questions or need additional information. Your time and effort are appreciated. Res ectfully Yours, J ?nW. Rouse, PE E Acting Division Engineer - Division 4 (252) 237-6164 x 3532 ccoggins@ncdot.gov Post Office Box 3165, Wilson, North Carolina 27895-3165 AA-r?9 . o P ~ Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ®Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification. ? Yes ® No For the record only for Corps Permit: ® Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: SR 1443 paving project 2b. County: Wilson 2c. Nearest municipality 1 town: Town Creek 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ® Other, specify: NCDOT Division of Highways 4b. Name: Jown W. Rouse, Acting Division 4 Engineer 4c. Business name (if applicable): NCDOT, Division of Highways 4d. Street address: P.O. Box 3165 4e. City, state, zip: Wilson, NC 27895-3165 4f. Telephone no.: (252)237-6164 49. Fax no.: (252)234-6164 4h. Email address: bobbylewis@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Chad Coggins 5b. Business name (if applicable): NCDOT Division 4 Environmental Officer 5c. Street address: P.O. Box 3165 5d. City, state, zip: Wilson, NC 27895-3165 5e. Telephone no.: (252)296-3532 5f. Fax no.: (252)234-6174 5g. Email address: ccoggins@ncdot.gov Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 35.8123 Longitude: - 77.8072 (OD.DDDDDD) (-DD.DDDDDD) 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Town Creek 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Tar River 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The land use in this area is predominantly silvicultural and agricultural. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 61' 3d. Explain the purpose of the proposed project: The purpose of this project is to grade and pave an existing unpaved secondary road as part of an ongoing effort to update the state road system and improve the transportation infrastructure in rural areas. 3e. Describe the overall project in detail, including the type of equipment to be used: Standard earth moving, road building and paving equipment will be used to widen the road surface, achieve a finished grade and pave the finished road. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: on soils map ? Yes ? No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Byron Bateman and Chad Coggins Agency/Consultant Company: Other: NCDOT/ Division 4 Environmental Staff 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes ® No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that ap ply): ? Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. Wetland impact 2d. 2e. 2f. number - Type of impact Type of wetland Permanent (P) or i k Forested Type of jurisdiction (Corps - 404, 10 Area of impact ( f nown) Temporary T DWQ - non-404, other) (acres) W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T El Yes El Corps ? No ? DWO W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ -non-404 stream width length (linear Temporary (T) (INT)? , other) (feet) feet) S1 ®P ? T Pipe Placement UT of Town Creek ? PER ® INT ® Corps ? DWQ 3 5 S2 ? P ? T ? PER ® Corps ® INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 5 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuallv list all onPn water imnnrtc k-1- 4 a. Open water 4b. Name of waterbody 4c. r -- - - 4d. 4e. impact number - Permanent (P) or (if applicable) Type of impact Waterbody type Area of impact (acres) Tem ora T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f Total open water impacts A, r.. ..a.,. 0 5. Pond or Lake Construction If and or lake construction proposed, then corn fete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Wetland Impacts (acres) Stream Impacts (feet) Upland Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ® Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Permanent (P) or Reason for Stream name Buffer mitigation Zone 1 impact (square feet) Zone 2 impact (square feet) Temporary T impact required? EC B1 ®P ? T devices and 5 ft UT of Town Creek ? Yes ® No 1310 874 longer pipe B2 ?P?T ?Yes ? No B3 ?P ?T ?Yes [] No 6h. Total buffer impacts 1310 874 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Impacts associated with this project are directly related to upsizing the existing crossline to accommodate the widened road surface as well as stablizing stream banks within roadway facility . Increases in road width and crossline length will conform to current engineering and safety standards. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. This project will operate under an approved Sediment and Erosion Control Plan and will also adhere to all permit conditions set forth by USACE and NC Division of Water Quality 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this ? Payment to in-lieu fee program project? ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to in-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ? No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ®Yes ? No 1b . If yes, then is a diffuse flow plan included? If no, explain why . Comments: See attached erosion control plan. ®Yes ? No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? % 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: All of the stormwater associated with this project will be directed through grassed ditches for treatment. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ® Other: NPDES 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8of10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? ®Yes ? No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater will be generated by the construction of this project. Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version .a r a N I co m MATCH LINE 16+50 O O + co z ? N ra?Mrn W wU< C3 L : Z( m z wD ?a < O 0 wavtOc1%j L o Yo066 U / K U W O a 1 Z O e O n w w N P I`' 0 ?n <o w 0 N D wmo WWNN D W- za a O n O W J <?+W 00 U Z'nzm 7 wo 0 0 9+ O O 0 0 a H O O 0 U O K ? MI a ?? V) ?n U ? Z o I W 0 O U Q H I U jOI ¢¢ z o 'mm, u z ZF= W U O n< zUmKo zoo z c~i?aa7 Lnww- wsx 9oa x<z avr c_^w< W I w a F Z F U 4 ?U U O O O I ' O? OI 0 Oa a N O W N M fan _a 0.. > wa ? <_Zd F a<?o u ZUZM? < O m c 6c6 W- oa0on?n 0 ~WWa? 0 F NCO W co O 0' zhN yO? WiN Q Omoa J (O V)dw U < W m Z'nZm J W cs w j 6 n, F 4? Q 4.? F ) ? < a?\ U c?+? mCwwC I NQ a° or v) m 0 \ Q x z N Q F Z Z) F 3 cz OMOU cz a ar-z a o w O N {J ciw w x <3WOO a Z L Z m D - W O V n d Ln 00 N N Z Q Y Z Z J O LO C'i 00 (-)0 O HU ?? Z K N r5= OI m W :;: z _O O Of N J W V J Q N Z = J a N Y m KQN?O a J O wW O {WL O O M z 2 0 Lr) a U N O ? Q O -j J F Q QW o? 00 U N Q W W Z X U ?Ca J W LLJ ti F- > aZO U N N N M M ? N .- NoZa ?p U Y ?0F-p N a oi w m U N N j O J m d v)aWOa MATCH LINE 22+50 U N a co vi N Z Q Y Z Z J w O uN.? ?CO 0 Q O p U 1 0 Z W N r5:: 01 m? ??Z0 II+p Z) J Orn Q N Z = J W Z Y m 01- LO Z 0 0_J.N-0_:2 .o O a x 09+91 3NI-I HOiVA O LO P/L SUZI E LE`MS SMITH P.0. 80X 606 27822 NC O f ELM CITY, 2418, PG. 640 D.B. P L - U a N O V I V) V a r M N U{qq OO K a ? Of 0 J z mUZa a F w uzZ ZpZ W J ?O = N 1 ?cr32Q ) Xom ci U Wa Ow d' UWOIL LL ~ W z z U i1 -H Z Z Wx NN V) U, m^ n v3 M f5 * ?W ¢ ? OW za No PINC:17+75.04 FmO mn N ,n m ? M UJO S? N ZN it NE M? NN tz . - S?V EN?\? J. S KN Wm 0 MN m j C pS ?L 1I CO m O N N QF'? N N h n m L: * ? n In UI ? AI a ? HaN w0 ( o M N N z L a M ,,i ( O N mah?N F m m w 0-U?N J U mU U X U W o d N N a c J Q N Up?U(7' F- 0) z CL d m (311) o wxrM a W m U '- N QO Jm6 xawda F J U P/L . x a M W N . I N w O N Z m Q ? Z Y OQ W) xx M W U F ¢ a Q Z U m W Z Z O 3^ a < = m U Q(n 0 N O CL; ,n17 <wr co J N U WlLUd U U aQOa F Z j Y U w M <ix U K O Q m m u- *daa. w O w N II x U 2 O -j Lo J Q N O Z w Q O Q J < N ? Q D ? 00 0' U V) Q 1.1 w Z U O Q J lL LLI LJ ?1 00 Z U N Q O Q -? F= 0 N ?. a. a' io O O U N Q W W h Z aU ? Q w J W H a_ ZO U a 0 ro ` VI N Z Q Y Z z -.11 w ON K I p V O 00 o ? ~ O F=- OOi Z of (N r5=,tOI M!ZO OOf NJ Zj7 W Z:) U J Q N Z = J W Z Lr) w<NZO aJ'- aM w U Q p Q 0 0 U Zst QUW Z 1n > 0 Z D < co M O Lr) O O + ZO C5 00 FNa O U W d r N a W J Ofz O~O Q as I 11?_ 13+00 EXISTING LANGLEY ROAD Ir , 30 EACH SIDE EAST _ -11+00 NCR 1003 ASPHALT ASPHALT o¢ n? 0 n _m 10 ..?c N FR 51G 0P" z N _ OPOSED 10 X 70' STING 60 R)W PRSIGHT DISTANCE +o E. 3 g I v EXI n Nn Wp O N ¢ O oFCL O Q n ? 1 o ot: ? Q N ¢ UOI U^ ZF y??U ?¢ Z M / U Z Ls K) o)z act W a z o - N + 04 CIJ N ry O W O F to d Z r K z z 7 ? w M a In mU?N W U a¢ I M N 0 K Z X ' C NU^ F OD i Wo QO wm ci xawoa In Wm 'H 59 ¢ 0 a V) z ci Z - m o w , 8 - > N WO 1 o 0 aI' 3iI_Lwzd F OOi w m U N N W a K W° b" 09+ ZZ 3N Il HD IVIN 0:Li 0 O LO I O i i W Li O u x U Z r?