Loading...
HomeMy WebLinkAbout20110749 Ver 1_More Info Received_20111012 Oro cPC.) dfe c1 K'? 1?,?? ?eecl I4? ?c p(-6ase ( roCe5s lPZ?// (O Lt" c???s 3CO AWmA NCDENR Project name Contact name Phone number Date Drainage area number STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. IJ. DESIGN INFORMATION The purpose of the LS-VFS Stormwater enters LS-VFS from Type of VFS Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of hvel lip provided o?OF WATF9QG y r 8 Dogwood Kevin Varnell 252.459.8196 June 20, 2011 3 Buffer Rule: Diffuse Flow The drainage area Engineered filter strip (graded & sodded, slope < 8%) 70,132 ftz 41,818 ftz 59.63 % 0.68 1.09 cfs 5.00 min 7.38 in/hr 8.04 cfs 1 inch/hour storm 1.09 cfs Y (Y or Pick one: Do not complete this section of the form. cfs cfs Do not complete this section of the form. 10 cfs cfs Do not complete this section of the form. (Y or N) 0 sq ft 0 in 0 in 10 ft/cfs 11 ft 12 ft Porebay is undersized. Too shallow. Too shallow. Form SW401 !.S VF-1 29Nov2010 - R( .a page 1 of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 30 ft 278.50 fmsl 276.10 fmsl 8.00 % N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. ft ft ft ft ft fVsec Pick one: N (Y or N) Y (Y or N) A Piped Bypass will be utiltized with Outlet Protection prior to entering the stream. B 1 Jill. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site_drainaae (if aoolicable). Delineated drainage basins (include Rational C coefficient per basin), Foreba;, (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. Initials Page or plan sheet number and any notes: C-1,D-2 Fort SW401 - LS-VF : - 29Nc 1010 - Rev.8 pa-e 2 of 2. Plan details (1" = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. J D-2 _ C-4 D-2 D-1 Engineered is being used. See Calculations See 0 and M Agreement Form N401 - :-VFS - 29Nov2 10 Re 3 page 3 of 3 A ,,I A ?F W ATF9 r YS NCDENR ? y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION Project name Dogwood Contact name Kevin Varnell Phone number 252.459.8196 Date June 20, 2011 Drainage area number 4 Ill. DESIGN INFORMATION The purpose of the LS-VFS Buffer Rule: Diffuse Flow Stormwater enters LS-VFS from The drainage area Type of VFS Engineered filter strip (graded & sodded, slope < 8%) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area 192,535 ftz Impervious surface area 85,813 ft, Percent impervious 44.57 % Rational C coefficient 0.59 Peak flow from the 1 in/hr storm 2.59 cfs Time of concentration 5.00 min Rainfall intensity, 10-yr storm 7.38 in/hr Peak flow from the 10-yr storm 19.11 cfs Design storm 1 inch/hour storm Maximum amount of flow directed to the LS-VFS 2.59 cfs Is a flow bypass system going to be used? Y (Y or N) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Do not complete this section of the form. Type of BMP Pick one: Peak discharge from the BMP during the design storm cfs Peak discharge from the BMP during the 10-year storm cfs Do not complete this section of the form. Maximum capacity of a 100-foot long LS-VFS 10 cfs Peak flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Explanation of any "Other" responses above LS-VFS Design Forebay surface area 0 sq ft Fo ebay is undersized. Depth of forebay at stormwater entry point 0 in Teo shallow. Depth of forebay at stormwater exit point 0 in Too shallow. Feet of level lip needed per cfs 10 ft/cfs Computed minimum length of the level lip needed 26 ft Length of level lip provided 28 ft Form SW401 -1 S-VFS - .8Nov201o - Re,. 3 rage , of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 30 ft 283.70 fmsl 282.40 fmsl 4.33 % N (Y or N) N (Y or N) Y (Y or N) Y (Y or N) ft ft ft ft ft ft/sec MCK one: OK Please provide plan details of flow splitter & supporting calcs. N (Y or N) Y (Y or N) A Piped Bypass System will be Utiltized with Outlet Protection prior to Entering the Stream. W 1 B 1 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, Off-site drainage (if applicable) Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. Foi n S :401 - LS-VFS - ^gNovT '0 - Rev.8 page ^ of s 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. ©?'? D-2 21? D-2 D-2 lyj D-1 Q / Engineered is being used. S L See Calculations See 0 and M Agreement Form SV'40 ; - L.` ?FS - 29Nov2C' , - Rev page 3 of 3 o W ;.a Z J.B. #2 ~ ° P..~_ r-- , ~ ~....r~ \ \ ~ I TOP (272.52 ~ / INV. 1N 268.63. J w ~ \ r ~ \ ~ ~ ~ ~ ~ INV. OUT (15") 268.53 a U ~ - \ , ~ ~ , - , ~ / INV. OUT (30").269.82 z ~ ~ N /1 ~ O W _ _ .r \ / y' I ~ til 2 > ' A~ ~ //1// ~ / ~ r \ r \ _ a f A i ~ - ~ ~ / - - r ~ / ~ - . 4' DIA. CONC. MH / ~ ~ ~ ~ ZONE 1 MPACF~ 0 0 w ~ ~ ; : , ~ ~2 INV• FES ti,S' r--~'.~ , ' / , . ~ Q-- 789 SF ~ ~ \ ~ ~ \ T - ~ f272.5c N O ti ti H % /r i ~ / r--' 260.00 J N 15" RCP - ~ / / ~ IDS . ~l T 15 ~Fu.~~3 ~ \ . , ~ ~ / ~ ( ~ Nw OUT- 30 269,82-- - ~ i C~~ CR SPREADER) 30" RCP w z EEK (TO BYPASS CHANNEL) ~ a ~ ~ ~ ~ ~ ~ / r - ~ 1" WSE ,N ~ r 6x30 i _ 30 CP'~ ~ ~C r N; ~ r r ~ .9,31.,.\-_ i f ~ , ~ ~ I~ ~ F= ~"ES ZONE 2~IM, PA. , ~ ~ L ~hEL SP AD R 30" RCP 40 ~ ~ i ~ fir.- i, 49~~f / / ~ ~ ~ ~ A___- 1~ : ~ ~ i ~ / ,r ~ LEVEL .SPREADER 2 TURN. NUESE RIVE, ~ ~ ~ ' ;y / ? , ~ - ~R 2 FLOW SPLITTER STRUCTURE ~ ~ ! C~ ~ ~ ~ ~ 40x30 / I`~ ,d ~ , LEVEL SPREADS , SCALE: N.T.S: PKWY. DITCH INTO ~ i ~ _ LEVEL SPREADER 2 ~ ~ ~ !P ELEV. 268'5 PLUGDITCH TO AV010 ~ ~ r j~ ~ ~ ~ ' D _ 2 ~ ~d. l r ~ V ' r C ~ NV. FE~ 3 BYPASS ~ ~ ~ ~ ; / ,,r' r._ s ~ ~ \ / ~ 2 50 l ~ ~ _ y f ~ ~ i ~ r ~ CJ / f,, ~ ~ q r C~~ , V ~ ~ Q/ Ai ~ ~ ~ i i r ~ , ~ ~ l ~ C.B. #19 / ' ~ i ~ ' ~ ~1 ! ~ ~ ~ _ r 1 TOP.. (284.37 V \ / ~i ,i 1 / INV. IN 280.60 i INV. OUT (8") 279.27 F .l l 27 ~ i ~ j` INV. OUT (18") 280,52 ~ ~ i ~ ~ ~ r I ~ i / r ti,. ft ~ ~ ti I l ~ , A~ / 'fir , / ~ 1~7~~. l t ti \ 1 1 I ~ ~.e! ~ ~ , -=r~_~ - - 4' DIA. CONC. MH ER 2 VEL SPREADER 1 LEVEL SPREAD LE ' » 3 SCALE: 1 =30 SCALE: 1 =30 ~ ~ - 8.. PE (TO LEVEL 18" RCP ~ ~ SPREADER) W ~ 9 ~ ~ - ~ \ (TO BYPASS CHANNEL) _ i" WSE \ \ ~ 18" RCP / w \ ~ ~ . \ e \ ~ ~ - i . 1 v' ' ~ ~i Z~ NE 1 IMPACT . _ ~..n._.__ ~ I Qr ) . ~ µ_,_..______7r.___ . ~ 6 7 SF V ~R ~ ~ - ONE2 IMPACT E ~ _ K i I LEVEL SPREADER 3 1 ~ ~ ZONE 1 IMPACT - 770 SF 3 FLOW SPLITTER STRUCTURE ,i~ \ w~-~`' INV.-FES 18 /271.0 . - ~ D-2 SCALE: N.T.S. i~~ " ..rv---------- ~ ~ ~ _ w ~ \ . - \ ~ 28x30' ~.,r . / _ ` 7 _ ~ ~ ,,W ZONE 2 IMPACT LEVEL S"PREA E 290 _ . _ _ ~ QR RG1~ ~ 12.21.E ; 2 ~ 451 SF INV. FES 23 _ .11R ELEV. 283.70 ~ 2 ®292 W 6.~FES Q~ ti ~.u.- ;/2 279.00 / ~r caM / 68 LF 18 ` , ` r~... ~ 8 0 J.B. #24 ~ - ~ / a~ RCP- ° .65~ ~ ...z~ w 'h ~ _v N. ~ ~ r o 7 , TOP 1288.20 _ , ~ W 6' FES ' ; ~ _ , ~ INV. 1N 284, 05 ~ , 12x30 ~ `~I ~ 3P ~ ~ ~ S , INV. OfIT (12") 284.00 ` 9 ..---~'ZE~EI SPREADER o .,..277 _r ~ - - - - \ B• , F g7~ - ti INV. OUT (18") 285.40 ~ ~'N ° L-IP--ELf l~- ~78~ 50._ .r _a..._- ~ `~5c3_-_~°df~'ESE. RUFF€R--- - -,T~iP 1288.20 ~ _~8 v' v ~ _,5F-tr 8 ~1NV. IN 24.05--- 2~ f. PVC ®-_Z.~,~~r A9 ~11~~. OUT (12) 284.00 _ 1 . _ a n_ c...1 t, y ry , INV. 8" 18A - _._"'p ~ - ~..,/INV. DUT 285,.40 4' DIA. ~t / CONC. MH / ~ _ , 278 ~ !tad. ~ _ _ ~:r,,,,e - A - o' ~ -v i` C' 80 ~ -289 ' 6' ~ / , r-- 12" RCP ! ~ (TO LEVEL 18" RCP ' ------J . ~ ~ ®f SPREADER) (TO BYPASS CHANNEL) r A~ ~ _ , ; 1.. WSE. ' Y r 24" RCP _ ~ r I ~ - ~ ~ 1. J ~ ~ ~ , J ~ 6~~ 0 f ~ / m 1 ~ i i / ~ ~ LEVEL SPREADER 4 4 FLOW SPLITTER STRUCTURE ~~M DER 3 LEVEL. SPREA LEVEL SPREADER 4 m° , 2 SCALE: N.T.S. N ~ N ~n,.,~ SCALE: 1 =30 SCALE: 1 =30 ~N~ wyW VEGETATED FILTER S RIP NOTES T #57 STONE ON LEVEL SPREADER CONSTRUCTION SEQUENCE =do FILTER FABRIC P R THE SOILS PROPERLY AND. 1. FOR AN EFFECTIVE VFS, IT IS ESSENTIAL TO PRE A E AND. 1. IMMEDIATELY BEFORE, BEGINNING CONSTRUCTION. CONTACT ENGINEER TO VERIFY. ° ° . , . MAINTAIN A DENSE VIGOROUS STAND OF TURF. THAT THE PROPOSED GROUND CONTOURS ARE APPROX. PARALLEL TO THE LS CONCRETELEVEL : sPREaoERUP 2. THE SIDE SLOPES CREATED BY ANY GRADING SHOULD RECEIVE THE SAME. ATTENTION TTENTION LOCATION CALLED FOR ON THE PLANS. #57`STONE ON T F 6~ a FILTER FABRIC ° . , . ° , 0 SOILS AND VEGETATION AS THE V S REINFORCED FILTER STRIP PERFECTLY 2. USING A SMALL EXCAVATOR, CONSTRUCT THE BLIND SWALE. CHANNEL °d ~ LEVEL FROM ONE SIDE TO 3. AT A MINIMUM THE VFS AND ANY SIDE SLOPES SHOULD BE COVERED WITH SIX . THE OTHER a SIX 3. BEGIN CONSTRUCTION OF LEVEL SPREADER ON UNDISTURBED SOIL IF .POSSIBLE. ° , INCHES OF TOPSOIL. 16~~ 3 x ' 30' IF CONSTRUCTED ON FILL,. COMPACT. TO 95~ STANDARD PROCTOR. CONCRETE .°.°.•.°.FILTER+°.°.•.°.°. 4. A ONE-TIME FERTILIZER APPLICATION TO THE TOPSOIL SHOULD BE PLACED AT A RATE ! ~ N w ~ STRIP.. . AT A RATE FORMS SHALL BE APPROX. 3" HIGHER THAN THE' DOWNSLOPE GROUND TO ~,,~~`'"I~CARO~~''% OF 75 LBS 1000 SF AGRICULTURAL GRADE LIME AND 50 LBS/1000 SF OF 5/10/10. / ~/10/1Q ALLOW FOR DIFFUSE FLOW. POUR CONCRETE TO TOP OF FORMS. ENSURE LIP e~, r 5/ ' . CLASS.B (FESCUE SOD) 0 ~ESSIp' .f, wco IS PERFECTLY LEVEL. LET CONCRETE SET OVERNIGHT AND REMOVE FORMS, c~.;°Q~° N9f••y z~ REINFORCED ~ FERTILIZER. ~--z A . A . CHA"NEL 5. FESCUE SOD SHALL BE PLACED PER DETAIL. 22 DEEP ~ • 4. BEGIN BACKFILLING AROUND LEVEL SPREADER AND: REINFORCE THE CHANNEL. SEAL Q" ENSURE WATER WILL ENTER BLIND SWALE AND FLOW ACROSS LEVEL LIP WITHOUT ~ 19843 z~ SECTION FESCUE SOD WATERING REQUIREMENTS BYPASSING ON BOTH ENDS. :,w ••.FN~iNEEE~.•: h`,,` ~z 5. INSTALL FLOW SPLITTER.. ~°~~~~~NAEIS~~.~ ~-~-2oi~ NwJ iaici ~ ,nin -rrn c~nn n ~rnv n z n n vc^ nrnrninrniT t innni -rr~nnro n Ti i~r Tr...., ir. -r. nii . i i rir. r~ innrr~ n nr n n n in.rni n ri rv i innr.innn nni rrinn~ ~'~Qllwu~i11111A 0 . 'Q C I. VVH IGF\ 3\,)U EVE F\ I L-U UM I D UC.rLINUCIV 1 Ur VIN IGVif I-f1/11V(lE. SPREADER b. SttU, J I KAW HIVU I HLK ALL UI~ I UKtitU HKtHZ:) IIVINItUIH I Lt T UrUIV UUIVIt Lt I IUIV. 57/_ _ 6 r 1- - DWQ LEVEL SPREADER DETAIL LIP 2. ATLEAST 2 INCHES OF WATER SHALL BE APPLIED DURING WATERING. Lolf- OQ Z r D-2 SCALE. • N. T. S. 2. ONCE SOD IS WELL ROOTED WATER AS NECESSARY TO MAINTAIN. SCALE: 1 30' 0 30 60 75 90 Dmz