Loading...
HomeMy WebLinkAbout20040275 Ver 8_Email_20110322RE: Duke Curve project (UNCLASSIFIED) Page //1 of 3 S G 1 a ?V RE: Duke Curve project (UNCLASSIFIED) T /?"" ? Euliss, Amy Sent: Tuesday, March 22, 2011 11:32 AM To: Thomas, John T JR SAW [John.T.Thomas.]R@usace.army.mil]; Scott Davis [sdavis@axiomenvironmental.org]; Amy.Euliss@ncmail.net Cc: White, Ryan L; Sandy Smith [ssmith@axiomenvironmental.org] If any crossing equals or exceeds 150 feet (intermittent and perennial streams) then mitigation will be required from DWQ. It doesn't look like this will be the case, but just wanted to let you know. DWQ understands that it is a single and complete project. Also, the Yadkin is 303d for turbidity. We expect Design Standards for Sensitive Watersheds. We also expect stormwater treatment to the maximum extent practicable. Amy -----Original Message----- From: Thomas, John T JR SAW [mailto:John.T.Thomas.JR@usace.army.mil] Sent: Tuesday, March 22, 2011 11:08 AM To: Scott Davis; Amy.Euliss@ncmail.net Cc: White, Ryan L; Sandy Smith Subject: RE: Duke Curve project (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Scott, 1. When you submit your PCN request, you will need to include documentation for the required mitigation for this project. 2. Even thought the project is retaining the DOT TIP number, we will be reviewing it as a separate and complete project with its own Corps Action Id number. John Thomas Raleigh Regulatory Field Office 919 554-4884 ex. 25 -----Original Message----- From: Scott Davis [mailto:sdavis@axiomenvironmental.org] Sent: Monday, March 211 2011 2:05 PM To: Thomas, John T JR SAW; Amy.Euliss@ncmail.net Cc: White, Ryan L; Sandy Smith Subject: Duke Curve project John and Amy, Good afternoon. Axiom is preparing the permit application for the Duke Curve Railroad Improvement project located in Davidson County and we wanted to alert you to it and give you some background prior to its submission. This project was initially part of the I-85 corridor improvements, including the replacement of the bridge over the Yadkin River, and still retains the TIP https:Hmai l.ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W 2TJI II4%2bm... 6/6/2011 RE: Duke Curve project (UNCLASSIFIED) Page 2 of 3 number for that project (I-2304A-C). The stretch of railroad considered for this project is generally oriented on an east-west axis and extends approximately 0.6 mile east from the general location of the I-85 bridge replacement location. This project is intended to improve railroad function and capacity of approximately 0.6 mile of railroad by realigning the track, replacing several culverts and adding a short maintenance roadway. The realignment will flatten a sharp curve that currently limits train speeds and efficient railroad operations. The project will serve existing and future passenger and freight rail traffic growth, including the Southeast High-Speed Railroad Corridor. A Categorical Exclusion document has been prepared for this project and we expect (based on my conversation with John last week per independent utility of the project) that project impacts may be authorized under Nationwide Permit 14 (Linear Transportation Projects). There are two stream crossings located within this project, an eastern crossing and a western crossing. The eastern crossing will impact two intermittent streams (Streams SA and SB) for a total of 163 linear feet of impacts (based on a 25-foot buffer of the 258 design plans) and the western crossing will impact approximately 144 linear feet of perennial stream (Stream SC) and 0.013 acre of wetland. Jurisdictional streams and wetlands were delineated by NCDOT Natural Environment Unit (NEU) biologists, and were apparently verified by the two of you on January 6, 2010. At that time, streams SA and SB were determined to have an intermittent flow regime and require mitigation at 1:1 ratios (if mitigation is determined to be necessary) and Stream SC was determined to have a perennial flow regime requiring mitigation at a 2:1 ratio (if mitigation is determined to be necessary). I am attaching a figure generated for the CE Document that should help my descriptions of the location and function of the project. We appreciate all of your time and input, and we hope to make this process as smooth as possible. Any suggestions or requests that you have to aid in this are greatly appreciated. We intend to keep you as up-to-date as possible. Please let us know if you would like any additional information at any time. Sincerely, Scott Scott G. Davis Senior Scientist Axiom_Logo.jpg Axiom Environmental. Inc. 218 Snow Avenue Raleigh, NC 27603 919-696-3045 sdavis@axiomenvironmental.org https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W 2TJH14%2bm... 6/6/2011 RE: Duke Curve project (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Page 3 of 3 https://mail.ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzL ed9W2TJIH4%2bm... 6/6/2011