Loading...
HomeMy WebLinkAbout20110359 Ver 1_Staff Comments_20110929Lucas, Annette From: Lucas, Annette Sent: Thursday, September 29, 2011 1:54 PM To: Homewood, Sue Subject: 11-0359 Village Point Drive - SW condition Attachments: 11-0359 Village Point Drive - condition.docx Here is the condition - let me know what you think please. Annette M. Lucas, PE Environmental Engineer NCDENR I DWQ Wetlands and Stormwater Branch 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) Phone: (919) 807-6381 Fax: (919) 807-6494 1 Email: AnnettcLucas?ri'nc?icnr. >ov Website: http://portal.ncdenr.org/web/wq/swp/-ws/401 `A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 11-0359 Village Point Drive AML comments September 29, 2011 1. Stormwater Management Plan Approved for Tract 2. The final, written stormwater management plan for Tract 2 approved by the Village of Clemmons, shall be constructed and operational before any permanent building is occupied at the subject site. The structural stormwater practices as approved by the Village of Clemmons as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Village of Clemmons and a copy of the stormwater plan modifications shall be sent to the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe), NCDENR/Division of Water Quality - Wetlands and Stormwater Branch, 1650 Mail Service Center, Raleigh, NC 27699-1650. 2. Temporary Stormwater Management Plan Approved for Tract 6. The temporary stormwater management plans received by the NC Division of Water Quality on September 13, 2011 must be implemented from the present time until a permanent BMP is constructed and operational to treat the stormwater associated with this tract. The approved temporary stormwater best management practice (BMP) devices consist of one sediment basin. The structural stormwater practices as approved by this Office as well as the drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances, and on all lots containing these structures including future access for maintenance. The stormwater easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. The schedule of maintenance activities listed in the Operation & Maintenance (O&M) Agreements signed by Mr. Nick Eller (Construction Manager - Novant Health, Inc.) on August 22, 2011 for the sediment basin must be followed for its effective operation. The O&M Agreements must transfer with the sale of the land or transfer of responsibility for the stormwater facilities. DWQ must be notified promptly of every transfer. 3. Written Stormwater Management Plan for the Remainder of the Site (Action Required). For the remainder of the site, a final, written stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) and proof of plan approval by the Village of Clemmons shall be submitted to the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe), NCDENR/Division of Water Quality - Wetlands and Stormwater Branch, 1650 Mail Service Center, Raleigh, NC 27699-1650. Before any land disturbance associated with any future phase may occur, the DWQ must receive documentation of the City's approval of the stormwater management plan for this project. These facilities must be designed to treat the runoff from the entire phase. Before any permanent building is occupied at the subject site, the stormwater management facilities shall be constructed and operational, and the stormwater management plan shall be implemented.