Loading...
HomeMy WebLinkAbout20061785 Ver 1_Triage Comments_20061116_....... DwQ~ ~~~ ~ l ~ ~~ Data ~~ l Plag Detail Yncomplete - ^ Please provide a location map for the project. a- Who Reviewed: ~ _ ^ Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ^. Please show all wetland impacts including fill slopes on the site plan. ~' ~~"Q° ' i S ~~~ ~ ~ ~ ~ ~ .u~- fi ~-~,~ ' ,~i i~, . f}Ju.~E2hC~ .t - ^ Please indicate all buffer impacts on the site plan. ,~ ~~~ ~{ ,1.~.:,{~..~-~-h ~ (~ ~'~-`"`. ~~ G`'~~` ~,.~ 1. Cfi~.~ ~i 1 ~ ~ Cr'"''h /SYI V i~i1 ~ ~x..~ ~ ^ Please indicate proposed lot layout ea overlays on the situ plan. ~" ~ (J ^ Pleaso indicate the location of the protected buff~•a as Qverl'ays oa the site plan. . ^ Please locate ail isolated or non-isolated wetlands, streams and other waters of the Stato as overlays on the site plea. ^ Please provide cross section details showing tho provisions for aquatic lifo passage ^ Please locate any planned•aewer lines on tho rife plan. ~ 2L~ Ploaso provide the location of any proposed stormwater maaagoment practixa as required by ~ l~ Ploase provide detail for the atormwater managamcnt practices as required by C3C ~. ^ Please specify the portent of project imperviousness area based on the estimated built-out conditions: . Please indicate all atormwate ~,o~}tfalla on the site etas. • /^ Please indicate the difli~se flow provision measuros do the site plan. ^ Please indicate whether ~or sot the proposed impacts ahroady bear conducted. Avoidance and/or Mlnimlzatbn Not Provided ~ ~ ~ ~ . . • The labeled as on the plena does not appear to be necessary. Please eliminate the . or provide additional information as to why it is aecea§ary for this project.. • [] This Office believes that the labeled on the plans as ~ can be moved. or reconfigured to avoid the impacts to the •~ . Please revise the plena to avoid thq impacts. ~ ~ ~ • ^. ~ This Office believes that the labeled on the plans as• ~ can be moved or reconfigured to:miniaiizo the iri~acts to'the . Please revise the pleas to minimize the impacts. ^ The stormwater discharges at the location on the plans labeled will. not provide diffase flow through the buffer because . Please revise the plans and providq calculations to show that dii;Ettse flow will be schievod through the entirobuf~. If it is not possible to achieve diffuse flow through. the entire buffea~ then it may bo necessary to' provide atormwater managem~t • practices that r~nove nutrients before the stormwater can be discharged through the. buffer. • Other i . ^. The application fee was inauffieiont•because over 150 feet of stream and/or.over 1 acre ofwetland'impacts were requested Please provide $ .This additional fee must bo recdved before your application can be reviewed. • ^ Please compkto Section(s) on theapplication. - f ^ Please provide a signed copy of the application. ^ Pleaseprovide copies of the application, . copies ofthe siteplans and other supporting information _ ^ ~ Pleasesubmit electronic CXD files showixtg ~ ; via' einai~l to ian.mcmillaa(r~namail.net and CD: • Mitigation . .. ~ ^ of compensatory mitigation is rcquirod for this projCct.' Pleaao provide'a compensatory mitigation plan. The plan must conform to tharequireraents in 15 A NCAC 2H .0500 and must be appropriate to thetypo-of impacts proposed. ^ Please indicate which 404 Permit the USACE would use to authorize this project.