Loading...
HomeMy WebLinkAbout20071841 Ver 4_Staff Comments_20110927Strickland, Bev From: Cranford, Chuck Sent: Tuesday, September 27, 2011 2:58 PM To: Mcmillan, Ian; Strickland, Bev Subject: AVL Airport 07-1841 V 4 Attachments: AROComments.071841 V4.9.27.11. pdf Hello Y'all - Here is our comment sheet for the subject project. Thanks, Chuck ********************************************** Chuck Cranford - Chuck.Cranford@ncdenr.gov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Quality - Surface Water Protection Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. 401 Water Quality Certification Regional Office Comments Project number: 07-1841 V4 Region: Asheville Date: 09-27-11 Project name: Asheville Airport Runway Rehab Staff` Chuck Cranford Regional Office Supervisor:' Keith Haynes ? Issue as submitted Q Issue with conditions listed below Requested Action' ` El Request additional information ? Return to applicant ? Den project 1. Stormwater Management Before any permanent impervious surface (i.e., building, roadway, taxiway, tarmac or other similar surface) is installed as part of any phase of the project described in this certification, the applicant must meet all of the following: • The Stormwater Management Plan (SMP) must be approved in writing by the City of Asheville. A copy of the approval letter and approved SMP must be submitted to the Division prior to installation of any impervious surface within the project site. If the project is phased, then the approved SMP for each phase must be submitted to the Division prior to installation of any impervious surfaces associated with that phase. The approved stormwater best management practices (BMPs) must be constructed and operational before any permanent building or other structure is occupied or becomes operational. If the project is phased, then the approved BMPs for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied or becomes operational. The approved SMP, phased or otherwise, as well as drainage patterns must be maintained in perpetuity. The SMP may not be modified without prior written authorization from the SMP approval authority. Also, include any standard IP conditions you see fit. Version 1 S:\SWP\Buncombe\401s\Non-DO'RAshevilleAirport\AVLAirport 07-1841 V4\RegionalOffice Comments.9.27.1Ldoc