HomeMy WebLinkAbout20091224 Ver 1_DCM Permit_201103100
Permit Class Permit
MODIk'ICATION/NIINOR 24-10
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
~errrYit
for
X Major Development in an Area of Envirotunental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to N.C. Department of Transportation,1598 Mail Service Center, Raleigh, NC 27699-1548
Authorizing development in Beaufort County at Pantego Creek, Bridge No. 77 on
NC 99 as requested in the permittee's application letter dated 3/10/11
including the attached 11" X 17"drawing dated as received on 3/17/11.
This permit, issued on 4/4111 , is subject to compliance with the application (where consistent
with the permit), al] applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Bridge No. 77 Replacement (TIP No. B-3611)
I) This minor modification authorizes an additiona10.02 acres of temporary Coastal Wetland impacts resulting from
hand clearing, as depicted on the attached workplan drawing, for a total of 0.36 acres, and a shift in the location of
the area of hand clearing. This change is being authorized to revise placement of the hand clearing area shown in
original permit drawings, sheets 4 and 5 of l7, dated l/28/l0 and sheets 6 and 7 of 17, dated 11/5/09.
2) All conditions and stipulations of [he active permit remain in force under this minor modification unless specifically
altered herein.
3) This minor modification shall be attached to the original of Permit #24-10 and copies of all documents must be
readily available on site,when a Division representative inspects the project for compliance.
(See attached sheet for Additional Conditions)
This pemtit action may be appealed by the permittee or Signed by the authority of the Seaetazy of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as [he case may be. ^ ~
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
James H. Gregson, Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
No Expiration Date, pursuant to GS 136-44.7B
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Cazolina Coastal Signature of Permittee
Management Program.
q-«zy
~t
Number ~ Q
N.C. Department of Transportation Permit # 24-10
TIP No. B-3611 Page 2 of 2
ADDITIONAL CONDITIONS
NOTE: This pemut does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.
•.R .r
L'~CAMA / U DREDGE & FILL N~ 579'7
G,.~/ENERAL PERMIT Previouspermit#
l~New ^Modification ^Complete Reissue ^Partial Reissue Date previous permit issued '-
As authorized by the State of Norch Carolina, Department of Environment and Natural Resources ~ .../ h1 16 0 p X70 u
and the Coaztal Resources Commission in an area of environmental concern pursuant to I SA NCAC ~
les attached.
Projett Location: County ~~+^`""{' ~
Street Address/ State Road/ Lot #(s) N ~ cj 9 0 /i.xf'"-"kIr
~. n.t laa P>r+f. r7P JK ILIS 6ri, S+c ~/P L'h-.j"2 o2
Subdivision
Clty OaNteJ° / ~, L ZIP ~-~yr60
Phone # (_) ~ River Bazin ' ar'`~ "''~"
~r- ' f''f ~a n..) .fu ~a<K. dl' r
Adj. Wtr. Body y"'j't/C`! nat man. unkn
Closest Maj. Wtr. Body Pur'g° ~./~e.r-
Type of Project/ Activity ^~
Q {..'f :Q
~.rr,~;,~- ,z,t, wri e c c
Pier (dock) length '~
Finger pier(s) '~
Groin length _ _
number -
Bulkhead! Riprap length -
avg dimn<e onshore -'
max distance onshore
Basin, channel =
cubicyards -
Boat ramp
Boathouse/ Boadih _
Beach Bulldovng
Other 3Q1 (°t, /~ 1.1 V' ~Gw
V~/it a.~~ ri fo C:'1~ L• Wo'IN-
a 3 D'fo"X ~~
•, z , (scale: /~//' )
_.
-_
-
._
I
_.
_ 1
_
- I
1 '
_ __
j
1
.
i f
i
I
l
_
L ~
~ ~ +
-t 1
..._.
_
L
~
~ . _
_
.. 1 ;.
i.. ~
U_J_
_ t
-
-
-i {
j--
j
-- I
-
-1-
-- ~
i
-_ i
.T
i_ I I
-i 1-
I
__ '
I I I I
I I
!
I !
~ I
i '~'
i! I
- N- - W ~-1 ~ p~
~, e ~
_ ~ a n1_ _.- y
-l-I-~_ _
Y __
ate , ; -i--I-
_ ~ _ .fitPP_
-I i i-_ t1
0.C. f ._I
I ~ @ _
S~1 .Q
~7 z ,1
C- j
-I`Ca,
f i 1
o~al 1j _
~lE a_'_
ifl I1
`1- _
- ~i~ I 1_ 1
Z"~Nt i-j~l
Y
I i I
~ I
J
i i i I
1 ~ _ ~_
1 ~ ~ I I
1 - I
I I
~-1 I
1
_
I_
__
-- I _I
1~
~-f- I
4 i
I i ~ I
- ~-~ 1
1
--r- I 1
J i-1
i ~
1
1 1 I
_ 1 I _I
~ r ~~
I_
i- I t
I
*-- ; 1i~1~~I-I
I i i
T
-~-
i r -
~ "
' 1
I ~ -
-
-
I
-
I
-~-~"
-
-,.-
1
-
--
--
-
~
}-
J
-
_. ~I i 1(
-
11~ I
I I !~.
-_
-~-~
+
- I
_
-~--~ I
_
}-
__.
_ j
I-+ 1
~-
- I
__ I_i
I ~
_S
-. I I j_
i
_
I
~
~ ~~
, I I 1 1111 l l lll _ f
A building permi[ may be required by. ~'"~~~' ~''ur~Y
Notes/Soecial Conditions ~ ~ ~'~- elclJ~i^5 b~jfhst-
n
/f See nJjote on backyregardin[g River Basin rules.
all ~ 7~'XV4l'a-l )YI /If A~^`7/~a~Y~)+~c(NQ[1 f
Affected ^CW ^EW bFTA ^ES ~'~TS
AEC(s): ~ OFA ^ HHF ^ IH ^ UBA ^ WA
^ PWS: ^FC:
ORW: yes / no PNA yes / no Crit.Hab. yes / no
M
~¢
p q
S
~ ~ L
~V ~
4
f~1
v
SN
i'
O C tC
O
" V
Qa. Q a W
N
> a
e
E
0
°= >
c ~ ~'
~ y u
a
U
5
.°
~ ^..
_o
3N
T ~
•O
G
7
Q
r
r dyV. d N
3c`.`=dd
~s
y .e ~ oo ~
~3~MM
ro~
Y .t
C CC V M ~
07 V i ~
5
S' L
F
~ V " N v~
O=! C y ~
.] G
rn o
~ o
~ ~ N
N N
.O r.
r1
~ M
L
~ O
Z ~ Q
6
Q ~ ~
i Y
V `
U zs
~ E 3
Y ~ ~
0
~ NF
R a
F
i
Q
N
01
R
F
`v
3
T t
sb
0
c ?
O [L
U T
C
~ `o
y c
u E
~F
m II
Q
`v H
v ~
o
a a
v
9a. Q
3 0
o ~
o ~
00
c °
F o
fL
_ II
c _
o ,o
C
V
_~ ~
~ II
O V
C
O H
9 3
°' a
v~
v ..
a. o`
r
m"
n
m ~
C
9
3 3
U o
2U
BUFFER AUTHORIZATION CERTIFICATION FOR BRIDGE REPLACEMENT PROJECTS
A riparian buffer authorization is required for bridge replacement activities within the Neuse and Tar-
Pamlico River basins per Division of Water Quality (DWQ) regulations 15A NCAC OZB.OZ33 & .0259. The
Division of Coastal Management (DCM) through a Memorandum of Understanding with the Division of
Water Quality (DWQ) has reviewed your project proposal, determined that the project as proposed
complies with the aforementioned regulations, and made a "no practical alternatives' determination
per those regulations:
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer authorization
as long as the project is constructed in a manner that continues to meet allot the conditions listed below. Failure
to comply with this Buffer Authorization shall subject the property owner & the party (contractor) performing the
construction &/or land clearing to a civil penalty of up to $25,000 per day per vidlatioh.
1) All stormwater runoff shall 6e directed as shee[Flow through stream buffers atnon-erosive velocities,
unless otherwise approved by this certification.
2) All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored
to the preconstruction mntoutsand re-vegetated. Maintained buffers shall be permanently re-
vegetated with non-woody species by the end of the growing season following completion of
construction. For [he purpose of this condition, maintained buffer areas are defined as areas within
[he transportation corridor that will be subject to regular.NCDOT maintenance activities including
mowing. The area with non-maintained buffers shall be permanently re-vegetated with native woody
species before the next growing season following completion ofconstruction.
n
3) Pursuant to NCACISA 2B .0233 & .0259, sediment and erosion control devicesshallnot be plated in
Zone 1 of any Neuse orTar-Pamlico Buffer without prior approval by NCDWQ. At this time, NCOWQ
has approved no sediment and erosion control devices in Zone 1, outside of the approved project
impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed
in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as
diffuse flow.
4) Bridge deck drains shall no[ discharge directly into [he stream. stormwater shall be directed across
the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes,
vegetated buffers, etc.) before entering the stream. Please refer to the most current version of
stormwater Best Management Practices.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify
~~'S~9o7
CAMA GENERAL PERMIT q:
that all information is complete and accurate.
o... J rrv,
Agent or Appli ant Print d Name
Agent Ap ica t ignature
~~
Permit Officer's Signature
`7-I-11 .
Issue Date
Statement of Compliance and Consistency
This permit is subjett to compliance with this application, site drawing and attached general and specificconditions:. Any-
violation of these terms may subject the, permittee to a fine or criminal or civil action; and may cause the permit to'become
nullandvoid. c,-' , ,
This permit must be on the project site and accessible to the permit offcerwhen the project is inspected for compliance. The
applicant certifies by signing this permit that I)priortoundertakinganyattivitiesauthoriiedbythispertnit,theapplicantwill
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt haz been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coaztal Management Program.
River Basin Rules Applicable To Your Project:
QTar-PamlicoRiverBazinBufferRules Q
Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Bazin checked above due to its location within that River Basin: These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on howto complywith these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
- r a.-
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead Ciri Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ I-888-4RCOAST
Fax: 252-247-3330',. - ~ .. ? .
(Serves: Cartere[, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth Cit~District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax: 252-264-3723
(Serves: Camden, Chowan, Cumtuck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax:p252-948=0478 ~ - ''`
w
(Serves: Beaufort. Berrie. Hertford.~Hyde.
Tyrrell and Washington Coundes)
Wilmington~District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3,845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
..- ... .4.~:{
Revised oe~ovroe