Loading...
HomeMy WebLinkAbout20110815 Ver 1_More Info Received_20110920Strickland, Bev From: Landry, Natalie Sent: Tuesday, September 20, 2011 4:48 PM To: Strickland, Bev Subject: 11-0815 Attachments: Lunsford Letter 0727 11.pdf; 0920 11 Corrected PCN Pg 6.pdf Hi Bev, Please add these two documents to 20110815 as Information Received. Thank you! Natalie From: Robin Austin [mailto:raustin(5tbiilm.com1 Sent: Tuesday, September 20, 20114:43 PM To: Landry, Natalie Subject: Person County Approach 6 Clearing Hi Natalie, Please find attached the revised Page 6 of the PCN and the Letter signed by the Property Owner, that you requested. Let me know if you need anything else. Thanks, Robin Robin Austin, PE ? .'Yt & BCigji-o 4810 Shelley Drive Wilmington, NC 28405 910-763-5350 910-762-6281/Fax raustin _tbiilm.com 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary (T) impact required? B1 ®P ? T Safety UT to Alderidge Creek ®Nees 16,740 10,966 B2 ? P ? T ? Yes ? No B3 ? P ? T ? Yes ? No 6h. Total buffer impacts 16,740 10,966 6i. Comments: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version Date 112-.11z0t1 Mr. Ricky Lunsford 456 Tom Oakley Road Timberlake, NC 27583 Re: Person County Executive Airport Runway 6 Approach Clearing Parcel ID No. 5942 - 2120 Frank Timberlake Road Dear Mr. Lunsford, Person County needs to begin clearing trees from the approach end of Runway 6 at the Person County Executive Airport within the next few weeks. The County recently performed a survey to update obstacle information as required by the FAA. The survey identified an area of trees on your family's property that penetrates the 34:1 approach slope for Runway 6. The trees are located within the existing aviation easement that the County purchased over the property several years ago. I am writing to you on behalf of Person County to confirm your family's permission to clear the approximate 2.3-acre area located on your family's property at 2120 Frank Timberlake Road. A map showing the proposed clearing area (including clearing that will be performed on the Airport itself) is attached. The purpose of the clearing is to make the Runway 6 approach safe for aircraft that will be using the runway. Trees in this area will be removed and the stumps will be grubbed out. Following the grubbing, the Contractor will smooth grade the surface and seed the disturbed areas. Please indicate that you will allow the County and its subcontractors to enter your family's property for the purpose of clearing the 2.3-acre area that penetrates the 34:1 approach surface as shown on the attached map. Your signature below indicates you have given your permission to the County to complete this work. I am available to answer any questions you may have. I can be reached at 336-504-4776. Sincerely, Ray Foushee Person County General Services Director 1 LAd give the Person County Executive Airport and its subcontr ctors permission to ter my property for the purposes of clearing trees within the limits shown on the attached map. Date : ,7 ?? Ul 0 0 N Ln O O U7 C'n n II m z ° 0 0 o ,-, m mI 0 O O c;l O 0 g " °aoxeoRO, raoRhi ?aROiinia T FRT & BRIGHT ALB g L?'."iENFLRMG& PVv411\C CONSIILTAM175 o RUNWAY ° APPROACH CLEARING ? REw510N5