Hi Bev,
Please add these two documents to 20110815 as Information Received. Thank you! Natalie
From: Robin Austin [mailto:raustin(5tbiilm.com1
Sent: Tuesday, September 20, 20114:43 PM
To: Landry, Natalie
Subject: Person County Approach 6 Clearing
Hi Natalie,
Please find attached the revised Page 6 of the PCN and the Letter signed by the Property Owner, that you requested. Let
me know if you need anything else.
Thanks,
Robin
Robin Austin, PE
? .'Yt & BCigji-o
4810 Shelley Drive
Wilmington, NC 28405
910-763-5350
910-762-6281/Fax
raustin _tbiilm.com
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
K Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary (T) impact required?
B1 ®P ? T Safety UT to Alderidge Creek ®Nees 16,740 10,966
B2 ? P ? T ? Yes
? No
B3 ? P ? T ? Yes
? No
6h. Total buffer impacts 16,740 10,966
6i. Comments:
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
Date 112-.11z0t1
Mr. Ricky Lunsford
456 Tom Oakley Road
Timberlake, NC 27583
Re: Person County Executive Airport
Runway 6 Approach Clearing
Parcel ID No. 5942 - 2120 Frank Timberlake Road
Dear Mr. Lunsford,
Person County needs to begin clearing trees from the approach end of Runway 6 at the Person County
Executive Airport within the next few weeks. The County recently performed a survey to update
obstacle information as required by the FAA. The survey identified an area of trees on your family's
property that penetrates the 34:1 approach slope for Runway 6. The trees are located within the
existing aviation easement that the County purchased over the property several years ago.
I am writing to you on behalf of Person County to confirm your family's permission to clear the
approximate 2.3-acre area located on your family's property at 2120 Frank Timberlake Road. A map
showing the proposed clearing area (including clearing that will be performed on the Airport itself) is
attached. The purpose of the clearing is to make the Runway 6 approach safe for aircraft that will be
using the runway.
Trees in this area will be removed and the stumps will be grubbed out. Following the grubbing, the
Contractor will smooth grade the surface and seed the disturbed areas.
Please indicate that you will allow the County and its subcontractors to enter your family's property for
the purpose of clearing the 2.3-acre area that penetrates the 34:1 approach surface as shown on the
attached map. Your signature below indicates you have given your permission to the County to
complete this work.
I am available to answer any questions you may have. I can be reached at 336-504-4776.
Sincerely,
Ray Foushee
Person County General Services Director
1 LAd give the Person County Executive Airport and its
subcontr ctors permission to ter my property for the purposes of clearing trees within the limits
shown on the attached map.
Date : ,7
??
Ul
0
0
N
Ln
O
O
U7
C'n
n
II m
z °
0 0
o ,-,
m
mI
0
O
O
c;l
O
0
g " °aoxeoRO, raoRhi ?aROiinia T
FRT & BRIGHT
ALB
g
L?'."iENFLRMG& PVv411\C CONSIILTAM175
o RUNWAY
° APPROACH CLEARING
? REw510N5